PROJECT

Projects

Environmental & Social Review Summary

Project Number

26753

Company Name

INTERNATIONAL STEELS LIMITED

Date ESRS Disclosed

Apr 28, 2008

Country

Pakistan

Region

Middle East

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 16, 2008
Signed : Jun 27, 2008
Invested : Apr 6, 2010

Sector

Other Steel Products (Including Wire, Metal Sheets etc.)

Industry

Manufacturing

Department

Regional Industry MAS MCT

Project Description

The proposed downstream steel project comprises the installation and operation of an integrated 280,000 tons per annum (tpa) cold rolled coil and galvanized sheet plant in Landhi, Karachi, Pakistan.

The project includes cold-rolling mill (120,000 tpa), pickling line, galvanizing (160,000 tpa) line, and a captive 18 MW gas fired power plant. The 32.4 acre project site has already been purchased, and the gas fired power plant is now fully operational and selling power to the national grid. The project is sponsored by International Industries Limited (IIL or the sponsor) which is the largest steel pipe manufacturer in Pakistan and listed on the Karachi Stock Exchange. It will be owned and operated by International Industries Ltd..

Overview of IFC's Scope of Review

The review of this project consisted of appraising technical, environmental and social information submitted by the project sponsor including a review of:

- the business plan for the proposed plant, including site maps, plans and engineering designs;
- the Initial Environmental Examination (IEE) report prepared for submission to the Pakistan Environmental Protection Agency,
- list of staff responsible for Q&E & and OHS Management System and their qualifications,
- organogram of concerned personnel,
- corporate social responsibility activities,
- Manual for Quality and Environmental Management System,
- Manual for Occupational Health and Safety Management System,
- Personnel Manual and recruitment procedure,
- Procedure for Environmental Aspect & Impact assessment,
- Procedure for Emergency Preparedness & Response,
- Procedure for Consultation and Communication,
- Procedure for Supplier & Contractor Management,
- Procedure for Use of Personal Protective Equipment,
- Current Status of Objectives (LTAFR – OHSAS),
- Current Status of Objectives (Environment),
- recent generator testing reports,
- current steps taken for Continual Improvement,
- employee participation in HSE MS System, and Lloyds Auditor reports for QMS (ISO9001:2000),
- EMS (ISO 14001) and OHSAS (ISO 18001).

In addition, IFC met with the project team at IIL’s existing plant in Karachi, and visited the project site, located approximately 2km from the existing plant.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
ESAP 4-28-08.pdf