PROJECT

Projects

Summary of Proposed Investment

Project Number

9151

Company Name

Kabula Hotel Limited

Date SPI Disclosed

Aug 19, 1998

Country

Malawi

Industry

Tourism, Retail and Property

Status

Completed

Sector

City and Business Hotel

Department

Regional Industry - MAS Africa

Environmental Category

B - Limited

Previous Events

Approved : Nov 5, 1998
Signed : Aug 27, 1999
Invested : Jun 22, 2000

Project Description

SUMMARY OF PROJECT INFORMATION (SPI)


Project Name Malawi-City Lodge Limited

Region Sub-Saharan Africa

Sector Hotels and Resorts

Project No 009151

Projected Board September 30, 1998
Date

Company Name City Lodge Limited

Technical Partner and/or Major Shareholders

City Lodge Limited, a Malawi registered company wholly owned by the Saidi family. Mr. Patrick Saidi (46) holds 75% of the shares. He has a Bachelor of Law degree from the University of Malawi and runs his own law firm, Saidi and Company. His wife, Annie and their children Priscilla, Patrick (jnr) and Charles hold the remaining 25% of the shareholding.

Project Cost Including proposed IFC investment

The project is estimated to cost US$1.5 million and IFC has been requested to provide a loan of US$612,000.

Location of project and Description of site

City Lodge Limited (CLL) has its head office in Blantyre, the commercial capital of Malawi. The hotel will be constructed on a half-acre plot behind the Kandodo Cornershop on the Zalewa Road in the Blantyre central business district.

Description of Company and Purpose of Project

City Lodge Limited (CLL) is a three story 30 bedroom hotel. The target market for the hotel is business people, both local and non-locals who travel to Blantyre on business. Presently the hotels available in Blantyre do not offer value for money. The services and amenities do not match the high prices charged. The rooms at CLL will offer direct telephone dialing, satellite TV and air conditioning. A restaurant, bar and conference hall will also be built to cater for guests and other visitors. The hotel will also have basement parking for its visitors and guests.

IFC’s finance will complete the financing plan and provide comfort to local financial institutions that are considering the project.

Environmental Category and Issues

This is a Category B project according to IFC''s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines, or design criteria. Environmental health and safety issues include site history and past contamination; disposal of liquid and solid wastes, including sewage; source of power and water supply including fuel storage if applicable; staff accommodation infrastructure; CFC-free cold storage and air conditioning; employee health and safety training; general housekeeping; and fire safety and emergency response preparedness. IFC has reviewed the information provided by the sponsor as well as information provided in the appraisal report regarding environmental impacts and proposed mitigation measures. : The site on which the project will be located is just outside Blantyre''s central business district. The land is undeveloped and, according to the project sponsor and appraisal consultant, has been vacant historically, the sponsors will discharge their wastewater and sewage to the municipal sewerage system. According to an engineer in the Blantyre Sewage Disposal Works, the municipal system has sufficient capacity to handle the hotel’s wastewater. The Government has adopted World Health Organization (WHO) limits for key water quality parameters (BOD, COD, pH and total suspended solids). City Lodge will obtain its power from the Electricity Supply Commission of Malawi (ESCOM). Because ESCOM''s supply is not reliable, a standby generator will be installed for use in the event of a power interruption and will be placed in a secondary containment structure capable of holding the entire contents of the tank in the event of a spill or breach. Water will be drawn from the Blantyre Water Board. The hotel will utilize cold storage and air conditioning equipment that contains non-CFC refrigerants, in accordance with the provisions of the 1987 Montreal Protocol on Substances that deplete the Ozone Layer. The sponsors will conduct an in-house training program for all staff that covers first aid, fire safety and safe operation of appliances and machinery. In addition, kitchen and other restaurant staff will be instructed in proper hygienic procedures relevant to their jobs. The sponsors have agreed to comply with all relevant IFC guidelines regarding fire protection and life safety. If necessary, a desk review of the detailed hotel design will be conducted by a fire safety expert prior to disbursement of IFC funds to ensure that the facility conforms to World Bank guidelines.

The Environmental Review Summary is available at the Infoshop

Date SPI sent to PIC: August 19, 1998

“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporations Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”

For additional Information contact: Corporate Relations Unit -
telephone: (202) 473-7711
facsimile: (202) 974-4384
Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Sponsor / Cost / Location