Summary of Proposed Investment

Project Number

8224

Company Name

Eritrea - Tesinma

Date SPI Disclosed

Apr 15, 1997

Country

Eritrea

Industry

Manufacturing

Status

Completed

Sector

Bus and Heavy Commercial Vehicle

Department

Regional Industry - MAS Africa

Environmental Category

B - Limited

Previous Events

Approved : Jun 12, 1997
Signed : May 14, 1998
Invested : Jun 24, 1998

Project Description

SUMMARY OF PROJECT INFORMATION


Project Name Eritrea-Tesinma

Region Sub-Saharan Africa

Sector Automotive (Coachbuilding)

Project No. 008224

Projected Board Date: June 20, 1997

Company Name: Tesinma

Technical Partners and/or Major Shareholders: The main sponsors are Mr. Tesfay Yhdego (42) and his wife Ms. Delia Brox.  Mr. Tesfay is an Eritrean national who has lived for over 20 years in Germany and obtained a degree in Production Engineering.  Ms. Brox, a German national, is also a qualified Production Engineer and both have had over 15 years experience in designing factories for batch and jobbing production. An Italian bus and coach builder (Cacciamali S.P.A) is to collaborate with Tesinma either as a technical partner or as a shareholder.

Project Cost and proposed IFC investment

Project Cost: US$1.91 million
IFC Investment: US$0.43 million (loan), and US$0.25 million (equity)

Location of Project and Description of Site:  Dekemhare, a town earmarked for industrial development about 40 kilometers west of Asmara, Eritrea’s capital.

Description of Company and Purpose of Project:  The venture will trade under the name of Tesinma, a newly established Company whose majority shareholder will be Mr. Tesfay. The project aims to assemble buses, dump trucks and flat trucks using completely knocked-down (CKD) kits.  Because Eritrea has the necessary skilled labor but much lower wage costs, it will be possible to assemble vehicles more cheaply than those presently imported as completely built-up units (CBU). Tesinma also plans to export to neighboring countries such as Ethiopia and Saudi Arabia. The Company also plans to provide maintenance services which are scarcely available in the country at present.

Environmental Category and Issues:  This is a category B project according to IFC''s environmental review procedure.  Environmental issues associated with this project include liquid and solid wastes disposal; handling and storage of hazardous materials, fuel, and oil; recycling of metals, solvents, oil, and motor fluids.  Occupational health and safety issues include employee exposure to dust, heat, noise and hazardous materials, and fire prevention and emergency evacuation.  The sponsor has submitted preliminary information identifying key mitigation measures, these include: proper storage of paints, thinners, and fuel; employee safety training; and provision of fire extinguishers.  Solid waste will be recycled as  appropriate, and it is expected that sewage will be discharged via soakaway. The project ERS is expected to be submitted to the PIC by May 16, 1997.

Date SPI sent to PIC April 15, 1997

For additional Information contact: Corporate Relations Unit  -  telephone (202) 473-7711  -  facsimile: (202) 974-4384
Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Sponsor / Cost / Location