PROJECT

Projects

Summary of Proposed Investment

Project Number

8112

Company Name

Nikol-Fert

Date SPI Disclosed

May 20, 1997

Country

North Macedonia

Industry

Manufacturing

Status

Completed

Sector

Re-Rolling and Drawing of Purchased Steel

Department

Regional Industry MAS LAC & EUR

Environmental Category

B - Limited

Previous Events

Approved : Jun 30, 1997
Signed : Dec 23, 1997
Invested : Mar 24, 1998

Project Description

revised Summary Of Project Information (SPI)

Project NameFYR Macedonia - Nikol-Fert
RegionEurope
Sector
Project No008112
Projected Board DateJune 15, 1997
Company NameNikol-Fert (the “Company”)
Technical Partner and/or Major Shareholders

The principal sponsors are the two owners and managers of the Company, Messrs. Nikola and Leonid Gajdadziev.

Project Cost Including proposed IFC investment

US$9.7 million including IFC loan of $3.0 million.

Location of project and Description of site

The project will be located adjacent to the Company’s current production site in the southeastern Macedonia village of Nikolic. The village is located on Lake Dojran and borders Greece.

Description of Company and Purpose of Project

The project is an expansion of the company’s manufacture of steel products for the construction industry. The Company is a medium-sized manufacturer of steel products--meshes, bearers, and cold drawn steel wire--used for the construction sector. The project will allow the Company to manufacture its input requirements of steel wire from billet, thus ensuring security of supply, better quality of inputs, and higher margins. The production will be primarily for Macedonia and the Balkan region.

Environmental Category and Issues

This is a category B project according to IFC’s environmental review procedure. Environmental issues associated with this project include air emissions, liquid effluents, solid wastes, noise and hazardous waste management. Occupational health and safety issues include general occupational and health and safety in the steel industry. The sponsor will submit adequate information to verify compliance of existing operations with local requirements and World Bank guidelines. The Company’s existing operations will be upgraded if necessary to bring the facility in compliance with applicable guidelines and regulations.

The is from the Public Information Center.

Date SPI sent to PIC
Revised
     May 14, 1997
May 20, 1997

For Additional Information contact: Corporate Relations Unit -
telephone: (202) 473-7711
facsimile: (202) 974-4384
Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Sponsor / Cost / Location