PROJECT

Projects

Summary of Proposed Investment

Project Number

7821

Company Name

GTI DAKAR

Date SPI Disclosed

May 27, 1997

Country

Senegal

Industry

Infrastructure

Status

Completed

Sector

Heavy Fuel Oil - Thermal Power Generation

Department

Gbl Infrastructure & Natural Resources

Environmental Category

B - Limited

Previous Events

Approved : Jun 30, 1997
Signed : May 15, 1998
Invested : Aug 27, 1998

Project Description

Summary Of Project Information (SPI)

Project NameSenegal - Greenwich Turbine (GTi) Dakar Project
     
RegionSub-Saharan Africa
Sector
Project No.:007821
Projected Board Date:June 27, 1997
Company Name:GTi Dakar Ltd.

Technical Partner and/or Major Shareholders

Greenwich Turbine, Inc., a wholly-owned subsidiary of Greenwich Air Services, Inc.

Project Cost Including proposed IFC investment

Project Cost: US$52.8 million equivalent
IFC Equity (10% ownership): US$1.2 million equivalent
IFC A Loan: US$11.4 million equivalent

Location of project and Description of site

Cap des Biches, Dakar, Senegal.

Description of Company and Purpose of Project

The Project is to build, own, operate and transfer a combined cycle power generation facility with an installed capacity of approximately 50 MW of electricity. The Project’s capacity and energy will be purchased by Societe Nationale d’Electricite (Senelec), the state-owned electricity utility of Senegal, under a 15-year Power Purchase Agreement (PPA). The Project will operate primarily on condensate liquid fuel which will be supplied under a long-term fuel supply agreement (FSA) with a major fuel supplier.

Environmental Category and Issues

This is a category B project according to IFC''s environmental review procedure. Environmental issues associated with this project include air emissions, liquid effluents, noise, spill control of fuel, fire protection and emergency response, and general workplace safety. The main fuel of the plant will be gas condensate which is low in sulfur (0.046%) and ash content. Because fresh water is a scarce commodity in Senegal and especially in the Dakar area, the project will meet World Bank ambient air quality guidelines without using water injection to reduce NOx emissions. Flue gas is emitted from a 30 m main stack. The sponsor will conduct a thorough ambient air quality monitoring program to confirm compliance. A one-pass sea water cooling system will be used to further reduce fresh water consumption. Neutralization and oil-water separator will be used to treat wastewater. The plant fire protection system will include automatic CO2 fire suppression systems for the combustion turbine generator and the control room and a water spray system for the steam turbine generator skid.
     

The is available from the Public Information Center.


Date SPI sent to PIC      May 27, 1997

For Additional Information contact: Corporate Relations Unit -
telephone: (202) 473-7711
facsimile: (202) 974-4384
Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Sponsor / Cost / Location