PROJECT

Projects

Summary of Proposed Investment

Project Number

7071

Company Name

Scana Leshan Machinery Co., Ltd.

Date SPI Disclosed

Oct 14, 1997

Country

China

Industry

Manufacturing

Status

Completed

Sector

Iron and Steel

Department

Regional Industry - MAS Asia & Pac

Environmental Category

B - Limited

Previous Events

Approved : Dec 5, 1997
Signed : Mar 18, 1999
Invested : Jun 4, 1999

Project Description

SUMMARY OF PROJECT INFORMATION (SPI)


Project Name China-Scana Leshan Metallurgical Joint Venture Co., Ltd.

Region Asia

Sector Iron and Steel Manufacturing

Project No. 007071

Projected Board Date November 14, 1997

Company Name Scana Leshan Metallurgical Joint Venture Co., Ltd.

Technical Partner and/or
Major Shareholders The majority (60%) shareholder will be Scana Industrier, asa, of Norway. Leshan Metallurgical Machinery and Roll Works (Leshan Works) will hold a 30% share. IFC is considering taking up the remaining 10% share.

Project Cost About US$ 29.9 million.
IFC financing being considered: US$ 6.1 million “A” Loan; US$ 1.35 million in equity.

Location of Project
and Description of
Site Shawan District, Leshan City, Sichuan Province, China. The site is the existing production facility of Leshan Works, located on the Chengdu-Kunming Railway and on the Dadu River.

Description of Company
and Purpose of Project The project company will be a limited liability sino-foreign joint venture company incorporated in China. The project is to restructure the ownership of Leshan Works, a state-owned enterprise, update its technological base, and introduce new management principles. The company will have the capacity to produce 30,000 tons per year of iron and steel rolls, components and parts for heavy industrial use.

Environment Category
and Issues This is an environmental review category B project, with special issues. The special issues are related to its significant social impacts, which include labor redundancies and a separation of Leshan Works’ productive operations from its social services obligations. A “Social Agreement” has been negotiated to mitigate these issues.
Other environmental issues associated with this project include potential site contamination, air emissions, liquid effluents, and solid waste management. Occupational health and safety issues include fire safety and emergency response, equipment guarding and employee exposure to noise, chemical substances, heat and dust. An environmental audit has been carried out for the production plants. A detailed environmental action plan for mitigating these issues and bringing the facilities in compliance with both local regulations and the World Bank guidelines will be part of the Investment Agreement.

The Environmental Review Summary is available from the Public Information Center.

Date SPI sent to PIC October 14, 1997.
Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Sponsor / Cost / Location