Project Description
The Project involves the refurbishment and operation by Santa Marta International Terminal Company, S.A. (“SMITCO”) of a container terminal inside the Port of Santa Marta, which is located on the Caribbean coast and is Colombia’s third largest port. The Project includes (i) the refurbishment of 2 berths with a combined total length of 322 meters; (ii) the installation of two Post-Panamax Ship-to-Shore cranes, four Rubber Tired Gantries Cranes, and other terminal handing equipment to complement an existing mobile harbor crane; and (iii) the demolition of existing buildings and expansion of the container yard from 4 hectares to 8 hectares. Upon completion, the terminal’s container handling capacity will increase from 120,000 twenty foot equivalent container units (“TEUs”) to 300,000 TEUs.