This project was originally approved in January 2003 based on a review in accordance with the Safeguard Policies, and is now under commissioning in accordance with the original plans. This investment, to provide additional financing for the original project to cover cost over-runs has been categorized as a C project based on the following.
The relevant Performance Standards for the investment are as follows:
PS1: Social and Environmental Assessment and Management Systems, which has been dealt with through the review of the original project and Pilkington’s corporate management systems;
PS2: Labor and Working conditions, which was dealt with through the visits to and review of other Pilkington operations and Pilkington Russia’s implementation of similar or better conditions at the new facility, including the freedom to create unions (was not a requirement of the Safeguard Policies);
PS3: Pollution Prevention and Abatement, which has been dealt with through the design of the new facility according to the latest principles and with a reference to new targets to be met according to EU IPPC implementation schedules; and
PS4: Community Health, Safety and Security. The project include best-available-technique for emission control, a distance to residential areas, an access road that avoids residential areas, and frequent public information and discussion meetings in cooperation with the local authorities.
PS5-8: The project has been screened and found not to have issues covered under these Performance Standards.
The above is documented in the ERS, and its attachment, as released on September 15, 2003 to the IFC Infoshop site and through a recent supervision visit to ensure it is fully implemented in accordance with the original plans, and consistent with the new Performance Standards.
Reference ERS #11660
[