PROJECT

Projects

Summary of Proposed Investment

Project Number

23596

Company Name

Mazoon Petrogas SAOC

Date SPI Disclosed

Oct 13, 2004

Country

Oman

Industry

Metals and Mining

Projected Board Date

Nov 30, 2004

Status

Completed

Sector

Oil and Gas Production (Includes Development)

Department

Gbl Infrastructure & Natural Resources

Environmental Category

B - Limited

Previous Events

Approved : Feb 16, 2005
Signed : Feb 26, 2005
Invested : Jun 7, 2005

Project Description

Mazoon Petrogas SAOC (Mazoon or the Company) is engaged in exploration and production of oil and gas. Mazoon and its 50/50 joint operating partner, Mazoon Petrogas BVI Limited (MPBVI) (an indirect wholly-owned subsidiary of China National Petroleum Corporation), explore and produce crude oil in Block-5 through a joint operating company, Daleel Petroleum LLC (the Operator). The Operator has proposed a US$331 million Development Plan, which Mazoon and MPBVI will jointly fund. The Development Plan proposes to further develop Block-5 and to more than double current crude oil production of 12,000 barrels of oil per day (bopd) by way of waterflood. This proposed project is an expansion of a brown-field investment and consists of financing a small portion of Mazoon’s 50% share (US$165.5 million) of the capital expenditures envisioned under the Development Plan. Block-5 contains the Daleel, Mezoon, Shadi and Bushra fields. The largest and most explored field is the Daleel field, which extends from the north to the south of Block-5. This field is further subdivided into five main zones: A, B, C, D and E. The Development Plan calls for the further development of mainly zones B and C. The major Project components of the Development Plan include: (i) further development of the water-supply wells at Masruq (an area twenty-one kilometers from zone B); (ii) water-supply pipeline from Masruq to the B-Block Station (location in zone B housing many of the major Project components); (iii) water-injection equipment; (iv) associated power generation and distribution facilities for the water-supply and water-injection systems; (v) gathering system for new zone B and C production wells; (vi) gas and water separation facilities at B-Block Station; (vii) produced water treatment facility; and (viii) pumping facilities to route separated crude oil from B-Block Station to the main Daleel Gathering Station. Furthermore, the Development Plan calls for the acquisition and the processing of new 3D seismic and the drilling of over ninety appraisal/producer and fifty-six water-injection wells.

Sponsor / Cost / Location

Development Impact