Project Description
Hidroelectrica La Higuera (HLH or the project) is a 50:50 joint venture formed in May 2004 by Pacific Hydro Limited (PHL) and Statkraft Norfund Power Invest AS (SNPI), collectively, the sponsors.
HLH will build, own and operate a 155 MW run-of-the-river hydro power plant located in the Tinguiririca Valley east of the city of San Fernando. The project diverts the Tinguiririca River and its major tributary Azufre just upstream of their confluence. At a gross head of 367 meters and a design flow of 50 m3/s, the installed capacity is 155 MW in two generating units equipped with vertical Francis turbines in a surface powerhouse. Firm capacity is estimated at 128 MW and average annual energy production at about 840 GWh. A 38 km long transmission line will be built to connect with Chile’s central grid at San Fernando.