Environmental & Social Review Summary

Project Number

9619

Company Name

Mabati Rolling Mills Limited

Date ESRS Disclosed

Feb 5, 2010

Country

Kenya

Region

Africa

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Dec 2, 1999
Signed : Apr 7, 2000
Invested : Oct 23, 2000

Sector

Coated Products

Industry

Manufacturing

Department

Gbl Ind, Manufact, Agribus & Services

Project Description

- 6 - August 13, 1999
International Finance Corporation
A Member of the World Bank Group
International Finance Corporation
A Member of the World Bank Group
Environmental Review Summary (ERS)

Project Name Kenya - Mabati Ltd.

Region Sub-Saharan Africa

Sector Iron and Steel Manufacturing

Project No. 009619


1. This project involves support of Mabati’s modernization proposals. Mabati’s operations include Cold Rolling Mills, Chemicals Division, Color Coating and Galvanizing lines. The key component of the project is to replace two existing galvanizing lines (one each at Mombasa and Nairobi) with a single unit at Mariakani near Mombasa. The technology chosen, i.e. non-oxidising type hot dip galvanizing and Aluminium-Zinc (Al-Zn) coating with on-line annealing, is state-of-the-art. The new plant, which is already under construction, will have the capacity to manufacture 80,000 tpa of galvanized and Al-Zn coated coils for the local market as well as for exports in the region. Hot rolled steel coils (imported from Japan, Europe and South Africa) are processed by the company''s in-house Cold Rolling Mill into cold rolled coils, which will be used in the manufacturing of the products. The galvanized coils, after undergoing further processing into plain, corrugated and color coated material will be used for industrial and residential roofing, furniture and office equipment, tanks, air-conditioning duct work and other general engineering fabrications.

2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of the project consisted of appraising technical and environmental information submitted by the project sponsor. The following potential environmental, health and safety impacts of the project were analyzed:

· impacts associated with past operations;
· air emissions;
· liquid effluent handling, treatment and discharge;
· hazardous materials handling and disposal;
· solid waste disposal; raw materials supply.
· water and power supply;
· emergency planning and response; and
· general health and safety issues.

The information provided by Mabati about how each of these potential impacts will be addressed in the development of the proposed project is summarized in the paragraphs that follow.

3. At IFC’s request Mabati completed an independent environmental audit of all existing operations proposed under the IFC project (this included Cold Rolling, Chemicals and Color Coating operations). This audit revealed that Mabati has no major problems with respect to environmental and safety management issues. Their operations are ISO 9000 certified, and they are targeting ISO 14001 certification for which they are currently developing Environmental Management Plans. Although the plants operated by Mabati are generally well managed, environmental and safety improvement recommendations were made as part of the audit and incorporated into action plans with implementation target dates. Mabati has committed to implement these corrective action measures as part of the IFC project.

4. Key elements of the respective action plans for the Chemicals, Cold Rolling, and Color Coating operations are summarized in the tables below. The independent auditors will play an ongoing role in ensuring implementation of these plans and in the steps necessary, including Environmental Management Plan development, for ISO 14001 certification.

5. This ERS will be translated into Swahili and made available at the factory locations at Mariakani and Nairobi and also at Mabati’s city office at Mombasa. Availability of these will be made known by a notice outside these premises.

6. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that Mabati’s proposed project will meet IFC/World Bank environmental, health and safety policies and guidelines and host country requirements. IFC will monitor ongoing compliance with IFC/World Bank environmental, health and safety policies and guidelines during the lifetime of the project by evaluating reports submitted annually to IFC by Mabati and by conducting periodic supervision.

The Action Plan is available upon request from the InfoShop.
COLD ROLLING MILL
ISSUE
ACTION PLAN
PROGRESS
TAR. DATE
No periodic monitoring of work place air qualityIndependent monitoring will be conductedReagents for the tests are being imported and are getting cleared at portAugust 1999
There is no fully formalized environmental management structure in placeEnvironmental management is being formalizedEnvironmental management committee is formed. Preparation of structure and policies as per guidelines has startedOctober 1999
There is no evidence of an insurance coverage on environmental matter (Locally not applicable)Matter is being examined
No evidence for personnel to have been formally trained on hazards, precautions, and procedures for safe storage, handling and use of potentially harmful materials in chemical laboratoryTraining will be institutedAll personnel in chemical lab have been explained of precautions and procedures while handling chemicals. All chemicals have been labelled with appropriate cautions/instructionsAugust 1999
No evidence of noise pollution/levels being measuredNoise pollution/levels to be monitored periodicallyNoise levels checked on 14.7.99. Ear plugs are provided to staff exposed to higher levelsDone
General lack of awareness of usage of personal protective equipment and trainingTraining to improve safety and protective equipment usage to be given to all employees25 employees have been given one day course in safety. Similar course for another 25 employees will be conducted by 25.9.99September 1999
Repeat fire drill and emergency response capability to be carried and records maintainedFire drills to be repeated with stress on emergency response capability and records to be maintained.Planned on 10.08.99August 1999


COLOR COATING
ISSUES OF CONCERN
ACTION PLAN
TARGET
DATE
Quality of safety boots and masks especially to paint mixing operators and casual labourInferior quality of safety boots, uniforms and masks will be identified and replaced. This will be reviewed monthly and replaced where necessaryJuly 19, 1999
Formal training of personnel on handling of hazardous material and use of protective gearTraining needs have been identified and included in the training scheduleAugust 17, 1999
House keeping in chemical stores and some areas of shop floorThis is being attended to immediately. Spillage’s and leakages to be sorted outJuly 19, 1999
Waste Management as per IFC standards1. We are reviewing our waste management systems to comply with the IFC standards
2. We are in the process of changing our processing chemical system to ‘Dry in place’ system which will be free from any toxic effluent
December 1, 1999
High noise levelsEar mufflers are provided to all staff but we shall impose its use. Awareness training has been identified and included in our training scheduleAugust 16, 1999
No evidence of fire drillsRecords of any future fire drills will be maintainedAugust 30, 1999
Air emissions monitoringSystem of air emissions monitoring and regular review to be put in placeAugust 30, 1999
Emergency eye washWashing basin to be installed near the chemical tanksJuly 26, 1999
Pre employment medical examinations for personnel This is done for staff working in the kitchens. The system for medical examination will be reviewed and implemented accordinglyAugust 30, 1999

CHEMICALS
ISSUE
ACTION PLAN
PROGRESS
TAR. DATE
Some spillages of HCL are noticedTo collect all the spillages and floor washings in a tank, analyse and treat to the required quality before drainingTanks for collection are procured and being installed. Pumps and pipe lines are ordered and expected in the 2nd week of August 1999. Work will be completed by end of August 1999.
Taking action to recycle all the liquid effluents and spillages in the process. Taking action to reuse the pump-seal water
August 1999
Air instrumentation compressor noise level is not measuredNoise levels will be checked periodically once a yearNoise level of the air compressor/rectifier checked and found to be 90dB. Ambient noise level outside the project property boundary is 68 dB, which is below the guidelines. Ear mufflers will be provided for the workers in the area.August 1999
Emergency and safety plans need improvementPlans and procedures are being improved and being formalized. Employees will be educated and trained.Action initiatedSeptember 1999
There is no formal environmental management structure in placeEnvironmental management is being formalized.Environmental management committee is formed. Preparation of structure and policies as per guidelines has startedSeptember 1999
There is no environmental insurance coverage in place (Locally not applicable)Noise pollution/levels to be monitored periodicallyMatter is being examinedDone

CHEMICALS
ISSUE
ACTION PLAN
PROGRESS
Materials were handled by operators who had no formal trainingTo institute formal training for operators and workersFormal training already started. Written instructions are under preparationSeptember 1999
Formal waste management procedure not availableTo prepare formal procedure for waste managementAlready startedAugust 1999
Housekeeping needs improvementTo pay more attention for better housekeepingAlready startedSeptember 1999
No surveillance program institute for personnel potentially exposed to toxic substancesOperators and workmen to be periodically examined once a year by a clinical officer and on his recommendations, specific cases will be sent for further medical examination. To check the ambient air quality by an outside agency once in six monthsOperators already sent for medical examination and workers will be sent for medical examination shortly.

Arrangements are already made with SGS Kenya
August 1999


August 1999
Noise and vibration level exposureTo be monitored on a bi-annual basis by a third party.
To provide ear mufflers
Already done

Being arranged
August 1999
Training of personnel in chemical/material handling, personnel protective equipment, emergency response capabilities and fire protection equipmentTo arrange formal trainingAlready startedSeptember 1999

Environmental and Social Mitigation Measures

Broad Community Support