Environmental & Social Review Summary

Project Number

8802

Company Name

NCC Fegda UAB

Date ESRS Disclosed

Feb 5, 2010

Country

Lithuania

Region

Europe

Last Updated Date

Dec 31, 2016

Environmental Category

FI

Status

Completed

Previous Events

Approved : May 14, 1996
Signed : Mar 17, 1997
Invested : Mar 23, 1999

Sector

Quarried Construction Materials (Including Asbestos, Crushed Stone Construction, Aggregates, Granite Block, Sand, etc.)

Industry

Manufacturing

Department

Regional Industry MAS LAC & EUR

Project Description

ENVIRONMENTAL REVIEW SUMMARY (ERS)



Project Name: Lithuania-Superfos Fegda UAB

Region: Europe

Sector: Construction

Project No.: 008802

1. The company will produce asphalt, pave and maintain roads as well as, to some extent, construct roads in Lithuania. The asphalt produced will be for Superfos Fegda’s own use (i.e. for pavement and road construction jobs performed) and sale to other road construction companies. The technology and equipment, for all activities, used in Lithuania will be similar to the technology used at Superfos Construction’s (SC) plants in Denmark. The equipment will be of high quality and the company will be the first in Lithuania to recycle asphalt. Production capacity is expected to be app. 250,000 tons of asphalt annually.
2. The plant will be established in an industrial area in the outskirts of Vilnius on vacant land not previously used of industrial purposes. Land use has been approved by the Vilnius Municipality.
3. Road pavement and repairs will mainly be conducted in the Vilnius-region. Road pavement and construction will mainly be for the existing road network.
4. This is a category B project according to IFC’s environmental review procedure. Specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of appraising technical and environmental information submitted by the project sponsor and technical appraisal by an environmental expert of the Investment Fund for Central and Eastern Europe (IØ), the agent for this facility. The following potential environmental, health and safety impacts of the project were evaluated:
· Air emission
· Handling and storage of hydrocarbon and raw materials
· Noise
· Waste
· Working environment
5. Information on how these potential issues will be addressed is summarized below.
6. Dust form handling and storage of raw materials will be minimized by spreading of water on the ground. Dust emissions from the asphalt plant will, due to installation of a filter before the chimney, not exceed 50 mg/m3. Emissions of SO2 and NOx will not exceed 0.25 mg/m3 and 0.125 mg/m3, respectively, due to the burner and installation of a filter in the chimney, the height of the chimney, and use of natural gas.
7. Hydrocarbons, including bitumen, will be transported and stored in containers or tanks. Other raw materials such as sand, gravel and recycled asphalt will be stored out doors on gravel or asphalt paved grounds. Tank pits will have secondary containment to avoid spills and contamination of soil and ground water. All hazardous materials will be stored in labeled containers or vessels. Storage and handling will comply with Lithuanians as well as Danish laws and regulations.
8. Noise level from the production will not exceed 75 dB (A) during day time and 70 dB (A) during night time outside the production area.
9. Surface waste water from areas where oil is handled will be collected and cleaned in an oil/water separator. Solid waste will be recycled, reclaimed or disposed of in compliance with Lithuanian laws and regulations.
10. All employees will be provided with necessary safety equipment, including fluorescent work wear, hearing protection, helmets, masks, footwear and glasses etc. For road pavement, necessary traffic safety measures will be taken, including traffic direction. In general, strict safety procedures will be implemented.
11. IØ, acting as IFC’s agent, will monitor ongoing compliance with World Bank environmental, health and safety policies and guidelines during IØ’s financial participation in the project by evaluating reports submitted annually to IØ by SC, and by conducting periodic supervision.
12. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that SC’s proposed project will meet World Bank environmental, health and safety policies and guidelines as well as Lithuanian environmental laws and regulations.

L:\MARY\IO\SUPERFOS\ERS.DOC

March 11, 1998 12:36

Environmental and Social Mitigation Measures

Broad Community Support