PROJECT

Projects

Environmental & Social Review Summary

Project Number

51660

Company Name

Dorjilung Hydro Power Limited

Date ESRS Disclosed

Nov 20, 2025

Country

Bhutan

Region

South Asia

Last Updated Date

Jan 26, 2026

Environmental Category

A - Significant

Status

Pending Signing

Previous Events

Approved : Jan 22, 2026

Sector

Large Hydro - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry - INF Asia & Pac

Project Description

The proposed Dorjilung Hydropower Project (DHPP, the Project) is a run-of-river hydropower plant to be developed on the Kurichhu River in Eastern Bhutan. DHPP has a planned design capacity of 1,125 MW, expected annual energy generation of 4,504 GWh, and 12.6 million cubic meters (MCM) of live storage, enabling peaking operation of up to eight hours. Power will be transmitted through a 35 km long, 400-kilovolt (kV) transmission line from Dorjilung to the pooling station at Durungri. This line is considered an associated facility to the Project. With a total estimated cost of US$1.7 billion, the Project comprises two main components:
• Component A. Preparatory Works – US$100 million: (a) Preparatory works (approximately US$ [93] million): This includes construction and strengthening of access roads and bridges, offices, on-site housing, preparation of civil contractor infrastructure, construction of diversion and access tunnels (adits) and construction power. (b) Community and Local Development (CLD) tailored investments (approximately US$ [7] million): This comprises strengthening local government capacity, community mobilization, supporting skilling and entrepreneurship (including in trade and sectors with urgent demand), and investing in last-mile infrastructure and services prioritized by communities – to ensure rural communities, including women and vulnerable groups, gain sustainable benefits from DHPP investments.
• Component B. Dam, Powerhouse, and Electromechanical Works (approximately US$1,600 million): (a) Construction of Main Hydraulic Structures- Civil and Hydromechanical Works (US$1,300 million): This comprises civil works for the construction of the headworks structures: (a) 139.5-m high and 241-m long Roller-Compacted Concrete (RCC) dam), the 15 km long headrace tunnel, and the underground powerhouse complex, and installation of hydromechanical equipment for the headworks, powerhouse, and tailrace. A portion of the budget dedicated to this component will also be allocated towards the financing costs. (b) Power Generation Facility – Electrical and Electromechanical Works (US$300 million): This comprises the design, supply, and installation of underground powerhouse equipment (turbines, generators, and control equipment), underground switchyard equipment, a centralized control system, general electrical equipment, control equipment for the headworks, and electrical and mechanical auxiliary equipment and systems. The power plant will have six units of 187.5 MW each. To ensure smooth implementation of these components, dedicated resources would be allocated to project management and monitoring activities (these activities' cost is already accounted for under Component B).
The Project will be implemented by the SPV (a joint venture of DGPC and Tata Power). In the interim, DGPC and Tata Power have established a Project Steering Committee to take key decisions and established a dedicated multi-disciplinary PIU to prepare DHPP. The PIU is working on DHPP preparatory activities in close coordination with the WBG. As the Project progresses and its SPV is incorporated, this PIU staff will become the SPV staff, complemented by personnel from Tata Power and additional hiring. To support implementation, the Bank is providing Hands-on Expanded Implementation Support (HEIS) for both E&S and procurement aspects upon request from DGPC, and dedicated experts are working closely with the DGPC PIU to develop local capacity, in coordination with relevant entities (such as the Department of Local Governance and Disaster Management). CLD investments will be implemented by SPV in partnership with government and non-government agencies with specialized technical expertise in proposed key areas.
IFC, as part of the World Bank Group (WBG) (jointly referred to as IFC, IDA and IBRD), is considering an investment of around US$300 million and additional mobilization of US$700 million in the Project. The WBG would be providing support of around US$ 800million in total, with remaining funding from IDA and IBRD.
In line with ongoing efforts to move towards a “One World Bank Group” E&S approach. IFC proposes to rely on Environmental and Social Standards (ESS). Accordingly, IFC and the World Bank have jointly undertaken the Environmental and Social Due Diligence (ESDD) and developed an E&S Review Summary (ESRS- present document) and the E&S Commitment Plan (ESCP) for the Project, and the outcome ensure equivalence in terms of findings and recommendations in line with ESSs and Performance Standards (PSs) requirement. To ensure consistency in disclosure with IBRD, while IFC disclosure (on its portal) refers to applicable PSs, the E&S mitigation measures section refers to applicable ESSs. Similarly, the common action plan refers to ESCP.

Overview of IFC's Scope of Review

IFC’s E&S review of this proposed investment included: (i) desk review of E&S risk management related documentation shared by Project Implementation Unit (PIU), which among others included, Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP), Land Acquisition and Livelihood Restoration Plan (LALRP), Feasibility study; (ii) Site visit in Sept 2025 to the Project area including ongoing preparatory work activity, worker accommodation; (iii) meetings in Sept 2025 with DGPC’s management team, including Project Director, technical team, PIU representatives such as E&S Manager, OHS Manager, and staffs responsible for stakeholder engagement, land acquisition, SEAH/SH; (iv) consultations with sample of economically displaced households, construction contractor, contract worker mobilized for preparatory work. Follow-up meetings took place between August to October on the findings of the site visit and document review; (v) review of the stakeholder consultation undertaken as part of the ESIA process and ongoing consultations by PIU; and (vi) discussion with forestry agencies, local government representatives at the project site.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
Environmental and Social Review Summary_V1.pdf
20250404_LALRP_Final Draft.pdf
20250813_Updated DHPP ESMP_Clean.pdf
20250813_Updated DHPP_ESIA_Clean.pdf
20250813_Updated DHPP_ESIA_Executive_Summary_Clean.pdf
20251215_DHPP_CIA_Addendum_Final_Draft.pdf
Stakeholder Engagement Plan (SEP).pdf