Environmental & Social Review Summary

Project Number

49969

Company Name

ENGIE ENERGIA CHILE S.A.

Date ESRS Disclosed

Aug 27, 2026

Country

Chile

Region

Latin America and the Caribbean

Last Updated Date

Aug 28, 2026

Environmental Category

B - Limited

Status

Pending Approval

Sector

Integrated Utilities

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

IFC proposes to arrange a US$400 million 10-year unsecured corporate loan to Engie Energia Chile S.A. (“EECL” or the “Borrower”) (https://www.engie.cl). EECL is a leading integrated utility company in Chile and a subsidiary of Engie S.A. (“Engie” or the “Sponsor”), an existing client of IFC. The financing will include a US$50 million A Loan with the balance provided through B Loans. The proceeds will be used to finance energy transition infrastructure including: (i) the battery energy storage system (“BESS”) Tocopilla project (116 MW/660 MWh); (ii) the BESS Lile project (140 MW/802 MWh); and (iii) the development of Chile’s first synchronous condenser, developed at the Tocopilla Complex, through the conversion of the former coal-fired generation unit 15 (closed in 2022) (the “Project”).

The project is being implemented entirely within EECL-owned brownfield industrial sites, largely leveraging existing infrastructure. The Tocopilla BESS is located within the Tocopilla Energy Complex in Chile’s Antofagasta Region, on the site of a decommissioned coal-fired power plant. It occupies approximately 3.3 hectares and includes 240 lithium-ion battery containers and 30 power conversion systems. The facility connects to the National Electricity System (SEN) using existing infrastructure within the complex. Commercial operations commenced in February 2026. The Tocopilla synchronous condenser is intended to provide grid stabilization services in the Antofagasta Region; it will supply power of 145 megavolt-amperes reactive and reach commercial operations in July 2027.

The Lile BESS is being developed within the Mejillones Thermal Complex, also in the Antofagasta Region, using existing electrical infrastructure and transmission lines originally designed for a potential expansion of the legacy thermal complex. The project will cover approximately 2 hectares and comprise 160 battery containers and 40 medium voltage transformers. It is expected to enter commercial operation during the second half of 2026.

Overview of IFC's Scope of Review

EECL is an existing IFC client through project #46952 ( HYPERLINK "https://disclosures.ifc.org/project-detail/ESRS/46952/engie-chile-ucl" \t "_blank" https://disclosures.ifc.org/project-detail/ESRS/46952/engie-chile-ucl). As of this disclosure, EECL’s E&S performance under that investment is rated satisfactory. In addition, the sponsor is an existing IFC client through project #48736 ( HYPERLINK "https://disclosures.ifc.org/project-detail/ESRS/48736/engie-sll" \t "_blank" https://disclosures.ifc.org/project-detail/ESRS/48736/engie-sll), and the sponsor’s E&S performance is also satisfactory.

IFC’s E&S appraisal reviewed EECL’s and the sponsor’s performance across existing IFC-supervised investments, including progress on implementing the Environmental and Social Action Plan (ESAP) agreed under IFC’s prior investments. The appraisal also included: (i) a review of project-level environmental, health, safety, and social documentation; and (ii) an in-person site visit in June 2026 to the Tocopilla BESS project (including the Synchronous Condenser) and the Lile BESS project, during which IFC met with EECL’s corporate and project teams.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
CP BESS Tocopilla.pdf
CTT _ CP Nuevo Proyecto Reconversion Condensadores Sincronos vf.pdf
CP Nuevo Proyecto de Almacenamiento de Energia con Baterias BESS Lile.pdf