IFC’s appraisal considered the environmental and social management planning process and documentation for the Project and gaps, if any, between these and IFC’s requirements. Where necessary, corrective measures, intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and (if applicable) in an agreed Environmental and Social Action Plan (ESAP). Through implementation of these measures, the Project is expected to be designed and operated in accordance with Performance Standards objectives.
PS1: Assessment and Management of Environmental and Social Risks and Impacts:
PS1: Assessment and Management of Environmental and Social Risks and Impacts
Policy: JBM Ecolife has recently developed an Environmental Health and Safety (H&S) policy which is broadly consistent with the principles of IFC’s Performance Standards (PSs) and will be implemented for EMVPL operations.
Identification of E&S risks and impacts: EMVPL has undertaken desk-based E&S screening of all depot sites and site level E&S screening was done for sample of the depots. As part of ESAP#1, for the proposed depot sites covered in the Concession Agreement to be managed and operated by EMVPL, the company will: (a) For brownfield depot sites, conduct an Environmental and Social Compliance Audit (ESCA), develop and implement a Corrective Action Plan (CAP) aligned to IFC PS requirements, EHS Guidelines, and applicable regulations. (b) For greenfield depot sites, conduct an Initial Environmental and Social Examination (IESE), develop and implement environmental and social management plan aligned to IFC PS requirements, EHS Guidelines, and applicable regulations. In this regard, EMVPL will engage with the relevant authorities for design, construction and improvement of the depot as part of ESCA/IESE findings, before the handing over of the depots. EMVPL will ensure that the depots once handed over by authorities will comply with the findings of the ESCA/ IESE.
Environmental and Social Assessment and Management System: JBM Ecolife mobility has recently developed a corporate level ESMS which will be used to manage E&S performance of EMVPL operations.
The corporate ESMS developed has key elements which are in line with IFC PS requirements, and include standard operational procedures (SOPs), emergency preparedness and response framework, and training management systems. The third-party ESDD findings (commissioned for similar operational e-bus concessions but outside the scope of current Project), informed the understanding of on-ground implementation challenges and the need to update corporate ESMS including additional SOPs. As part of ESAP#2, EMVPL will adopt the corporate Environmental and Social Management System (ESMS), update and implement the management system elements relevant to its business activities and operations and aligned to IFC PS requirements, applicable WBG EHS Guidelines, and incorporating gaps identified as part of third-party ESDD, which at minimum, will include: (a) A framework for identification of E&S risks and impacts including occupational health and safety hazard identification and risk assessment (HIRA) for all project activities covering depot and bus route operations. (b) A detailed legal compliance register for all depots and bus route operations. The register will incorporate the Concession Agreement requirements, permitting and licensing requirements. (c) Management programs, including standard operating procedures (SOPs) and plans for managing EHSS risks and impacts in construction and operations phases to cover depot and bus route operations. Route operations management programs will cover, at a minimum, route risk assessment, fatigue risk management plan, driver selection, training and performance management, and journey management plans. (d) Contractor ESH management plans for construction and operations phase activities. (e) E&S organizational structure with clear roles and responsibilities for construction and operation phase activities. (f) Emergency preparedness and response plans including site-specific emergency response procedures, aligned to IFC PS1 requirement, covering construction, depot and bus route operations and activities. (g) Stakeholder engagement framework and grievance mechanism aligned to PS1 requirements. (h) A framework for monitoring, reporting and carrying out periodic reviews of E&S performance during construction and operations phases. The monitoring will cover identified significant environmental aspects and impacts, health and safety risks and social risks and impacts associated with EVMPL business operations. (i) Develop EMVPL minimum standards for depot infrastructure, facilities and amenities required under applicable laws and good international industry practices. The minimum standards will be used to assess compliance and operational readiness of depots prior to site handover from respective authorities to EMVPL.
EMVPL will be provided with depot sites with varied level of infrastructure, and existing legal compliance related to registration/ licenses under various acts and regulations may vary across depots. The CA for each of the depot sites will further have key EHS related requirements stipulated. The ESCA audit and IESE will capture these requirements and EMVPL as part of ESAP# 3, will apply and obtain the required permits, registrations and licenses under the applicable Acts, but not limited to, Factories Act, Principal Employer Act, Fire NOC, Motor Vehicles Act, Central Motor Vehicles Rules, Contract Labor Act, BOCW Act and Environment Protection Act.
Ensure that each depot site develop a detailed compliance register (using the sample legal register as part of the corporate ESMS), incorporating the CA requirement, multiple permits and licenses and requirements stipulated therein, applicable ESDD CAP recommendations for depot operations, ESCA’s gap closure recommendations, and IESE Environmental and Social Management Plan (ESMP) among others. In addition to the legal compliance register, depots will apply and obtain the required permits and registrations/licenses under the applicable Acts.
JBM Ecolife mobility has commissioned third party ESDD covering JBM Ecolife (corporate) and JBM’s existing depot operations that are similar to the depots in the project scope. The Corrective Action Plan (CAP) developed as outcome of ESDD will be used for depot level E&S improvements as part of EMVPL operations. As part of ESAP# 4, EMVPL will review and implement recommendations in the third-party ESDD and Labor Audit Corrective Action Plans (CAP) which are relevant to EMVPL’s activities and operations, in agreement with IFC.
Organizational Capacity and Training: The corporate EHS team currently includes Chief Human Resource Officer (CHRO) also acting as Head EHS; and 1 staff each for recruitment, onboarding, and labour compliance (supported by depot level HR/administration staff responsible for compliance. As part of ESAP#5, EMVPL will EMVPL will:(a) Hire a qualified EHS manager to lead and manage ESMS implementation for all business operations; (b) Hire an E&S permitting coordinator to coordinate and manage permitting requirements for all business operations; (c) Hire EHS coordinators, at the cluster level, responsible for monitoring ESMS implementation at the depots; and (d) Designate a senior operations staff to manage day-to-day EHS operations at the depot level. EHSS committee will be formed at EMVPL level to track the performance and provide support to the depot operations for successful ESMS implementation in line with IFC PS requirements. The proposed EHS training for workers engaged in operations (as part of corporate ESMS), including the ongoing driver training provisions, will be implemented for EMVPL operations.
Emergency Preparedness and Response: Emergency Preparedness and Response Framework (EPRF) is developed as part of the ESMS manual at the corporate level. EVMPL will develop and implement Emergency Preparedness and Response Plan (EPRP) during construction including installation and commissioning of the charging infrastructure, depot operations and bus route operations. As per ESAP#6, EMVPL will develop and implement emergency preparedness and response plans for bus route operations including site-specific emergency response procedures for depot level emergencies. EPRP will specifically address safety concerns related to climate-related risks and include measures to manage and mitigate the impacts of extreme weather events, such as floods, heavy rainfall and heatwaves. Separately, EMVPL will develop EPRP for en-route bus operations which will be communicated to passengers by auto message display in the e- bus (as permitted by the Authority).
Monitoring & Reporting: The existing ESMS developed for JBM Ecolife Mobility platform has provision for E&S reporting covering aspects such as: training and capacity building of driver on technical as well as behavioral aspects; water consumption; energy consumption; accident/incident cases at the depot and on road; waste management and minimization; monitoring of battery health and batteries end of life management; stakeholder engagement records and grievances records related to driver driver/ bus staff; life and fire safety trainings & mock-drills records. As per ESAP#2, the company will further update the E&S monitoring requirements, especially regular tracking of the compliance register, and include KPIs to meet IFC PS requirement and WBG EHS guidelines including labour and working conditions for direct as well as contract/ third party workers. EMVPL will implement an E&S monitoring and auditing procedure that covers regular inspections, internal and external audits and senior management reviews to ensure ESMS implementation as well as compliance with relevant legal requirements, IFC PS and applicable WBG Environment Health and Safety (EHS) Guidelines at depot sites.
Depots/ sites under EMVPL will be commissioned/ operationalized in phases depending upon the status of the signing of the CA, readiness status of sites (i.e site handover by authority post depot level construction as per CA requirements). As part of ESAP #7, EMVPL will undertake external monitoring of sample sites by a competent third-party, at least once annually, to assess ESMS implementation, and compliance with E&S requirements for the first three years. Subsequent monitoring requirements to be decided based on ESMS implementation status.
PS2: Labor and Working Conditions
Total manpower requirement for EMVPL operations will be around 3700, out of which EMVPL own staff will be less than 100, while the remaining workforce will include third party workers mobilised under Annual Maintenance Agreement (AMC) for e-buses and charging infrastructure, security, bus operator (including drivers) and other small AMC contracts. Some of these AMCs will be awarded to JBM group companies such as JBM ecofuel, JBM electric vehicles private limited.
Human Resource (HR) Policies and Procedures: Similar to ESMS, JBM Ecolife mobility (corporate/ platform) HR policies will be adopted and implemented by the EMVPL in each of the depots. Most of these HR policies are either adopted from JBM Group HR policies or are developed as part of Corporate ESMS development. These policies are not implemented currently and will be rolled out in due course of time.
EMVPL, as part of ESAP#8 will (a) adopt, update and implement the existing corporate Human Resource policies in line with all IFC PS 2 requirements covering: working conditions and terms of employment; prohibition of child labour, forced labour and discrimination; grievance mechanism; PoSH; collective bargaining and freedom of association; retrenchment; and (b) Incorporate the updated human resources policies in contractual E&S agreements with all suppliers and labor contractors.
The company commissioned a third-party labour due diligence (DD) of JBM Ecolife mobility/ corporate platform, and sample existing depot operations (outside of the project). As part of ESAP#4, EMVPL will implement the labour corrective action plan (CAP) as applicable for its own operations based on labour DD across EMVPL depots including development of stipulated policies and procedures.
Working Conditions and Terms of Employment: EMVPL will ensure that all employees receive appointment letter clearly articulating terms and condition of employment in line with updated HR policies and procedures.
Grievance Mechanism: The existing GM policy covers all on roll employees and direct workers of company. EMVPL will as part of ESAP#8, update the existing GM inclusive of anonymous option for reporting grievances, access for third party workers, GBVH sensitive channels, and detailed procedure for communication/ reporting/ tracking.
Prevention of Sexual Harassment (PoSH): The corporate HR policy on PoSH meets the legal requirement including formation of the Internal committee (IC), resolution of grievances. EMVPL will update and adopt the corporate HR policy related to PoSH (refer ESAP#8) with further details on Internal Committee (IC) roles and responsibility, access to third party workers, training and awareness generation of workers (including third party workers) and IC committee members, investigation procedure, survivor centric approach as part investigation and resolution of grievances.
Retrenchment: The company policies on retrenchment indicate that the company complies with the host country regulations should there be a situation requiring retrenchment. As part of ESAP#8, the company will update the retrenchment policy to include provision for retrenchment plan preparation in cases where retrenchment cannot be avoided, and should reflect EMVPL consultation with workers, unions, or other stakeholders in line with local law.
Worker’s Accommodation: The company does not envisage accommodation facility at the upcoming depots/ sites during operations. Resting areas and canteen will be made available to workers (drivers, maintenance crew, etc).at depots including access to sanitation facilities. As per ESAP# 2, the company will put in provision for amenities such as resting areas, canteen available to workers (drivers, maintenance crew, etc develop/ update.
Third party workers: The company will engage third party workers for depot operations, charging infrastructure maintenance, O&M of buses, security, and housekeeping, tyre maintenance, battery maintenance among others. Some of these will be through the contracts/ AMC to JBM group companies. In some cases, these contracts will be further sub-contracted. As part of ESAP#2, the contractor management system will be further updated to include: mapping of the contractors/ sub-contractors and deployed manpower associated with each of the contractor; compliance records and legal compliance monitoring (related to labour and working conditions and OHS); internal monitoring of the contractor performance (frequency of monitoring should be determined on the basis of risk profile of contractors). EVMPL will ensure that contractor management system is implemented, contractor management becomes the responsibility of the contract holders (hiring department) with compliance monitoring and assurance implemented by the EHS Officers and HR teams (as per ESAP#4), and dedicated manpower is assigned for implementation and monitoring of the contractor management system implementation. EMVPL contractual agreements with contractors will mandate E&S compliance with EMVPL policies and procedures including IFC PS requirements.
Occupational, Health and Safety (OHS): The corporate ESMS includes Occupational, Health & Safety (OHS) plan associated with route operations and electric bus depots operations such as washing and cleaning, charging of electric buses, maintenance workshops etc. The OHS plan includes: roles and responsibilities of the OHS team; risk identification on health and safety elements such as physical hazards, working at height, temperature, work place ergonomics, noise, slips, trips and fall, fire and electrical safety, charging infrastructure safety at depot along with mitigation measures; psychological wellbeing; employee/workers welfare; health check-ups; road safety management; fatigue risk management; accident and incident investigation; record keeping and monitoring and reviewing. EMVPL will adopt and implement the OHS plan for its operations. The SOP for HIRA (to be developed as part of corporate ESMS) will include a risk matrix to facilitate preparation of site-specific operational risk assessments. HIRA will list all identified hazards within the work zone, including the hazard levels and the controls available to eliminate or reduce the associated risk. HIRA will be developed specific to different work zones within the depot and appropriate signages, highlighting the risk assessments and safety instructions, will be displayed in respective work areas. The approved risk assessments should be communicated to all impacted workers in operations phase. The company will maintain records of Lost Time Incident Frequency Rates (LTIFR) across depots.
Supply Chain: JBM Ecolife will be sourcing Electric vehicles and charging infrastructure from the group companies. JBM Electric Vehicles will be further sourcing batteries from another group company of JBM Auto. The corporate ESMS includes supply chain management plan to manage the business risk associated with supply chain. The plan includes supply chain policy, supplier code of conduct (CoC), supplier screening criteria, supplier monitoring checklist. The supplier CoC provides for compliance with labour regulations and supply chain policy includes compliance with applicable labour laws and international labour standards including prohibition of child labour, elimination of forced labour etc. As part of ESAP #9, EMVPL will update and implement the supply chain management system for all its operations to include the following: (i) mapping of the OEM’s battery supply chain; (ii) develop specific E&S KPI’s to support supplier/vendor performance evaluation; (iii) Incorporate the supply chain policy and supplier code of conduct (CoC) into the contract agreement with all suppliers; (iv) define responsibilities and accountabilities for enforcing SCM requirements; and (v) conduct periodic supplier performance evaluation as part of the monitoring activities undertake monitoring of supplier compliance with CoC. Additionally, EMVPL will develop a consequence management matrix to address any non-compliances with the SCM Plan, Code of Conduct and other general E&S requirements.
PS3: Resource Efficiency and Pollution Prevention
Resource Efficiency: The water requirement at depots will for domestic consumption and for bus washing. The water is proposed to be sourced [through tankers or through municipal supply, as applicable for respective depots] and stored in underground water tanks (capacity depending upon need). The source of water for the sites will be confirmed as part of the ESCA/ IESE (refer ESAP#1). The depots will install water meter and maintain log book to record daily water consumption. The company proposes to use Light Emitting Diode (LED) lights at the bus depot and the electric chargers to be installed are designed to have higher efficiency. The company will continue to explore opportunities to improve energy efficiency across its operations and expand its renewable energy footprint.
Greenhouse Gases (GHG) Emissions: The annual electricity demand of 1,130 electric buses and associated infrastructure will result in GHG emissions of 53,185 tCO2 per year. The introduction of e- buses will result in reduction of 33,049 tCO2e per year compared to diesel bus fleet. The coolant used in the buses is R410 A which is not an Ozone Depleting Substance (ODS).
Air & Noise Emissions and vibration impacts: The key source of air emissions is related to back up Diesel Generator (DG) set (if required), and fugitive dust emission from vehicular movement. The depots will comply with the existing regulations (consent to operate from state pollution control board) as well as the environmental monitoring regime as part of the ESMS. Environmental monitoring will include ambient air quality monitoring in compliance with the national ambient air quality standards. Noise will be generated at the depot from day-to-day activities, vehicular movement and DG Set (when operated). The DG set will be provided with acoustic enclosure. The company will further undertake ambient noise monitoring to ensure noise levels are within prescribed limits. Bus depot operations such as the movement of buses, including acceleration, braking, and idling, can cause vibrations that are transmitted through the ground and potentially affect nearby structures and individuals. Indirectly, these vibrations can contribute to noise pollution and potentially affect the health and well-being of drivers and passengers. Any concerns related to vibration impacts will be addressed through GM (refer ESAP#8).
Wastewater Treatment: The company will generate process wastewater from its bus washing operations. The domestic wastewater generated from the depots will be treated through a septic tank followed by soak pit. The water from the washing activity will be treated through an ETP of adequate capacity (as per SPCB requirements). Some of the brownfield depots may have provision for ETP or may require to be constructed, while greenfield depots will need to construct ETP; this will be confirmed during the ESCA audit and/ or IEE study to be undertaken for each site. The ETP treatment process will include bar screen for separation of floating materials, oil skimming for oil and grease removal, provision for removal of suspended particles, tertiary treatment comprising of ozonator, multigrade sand filter, activated carbon filter. Sludge collected from the ETP will be taken to sludge filter press for removal of water. The entire treated water will be re-used for washing along with raw water. Wastewater at both inlet and outlet of ETP will be monitored to comply with applicable regulation and WBG EHS guidelines and will follow the environmental monitoring plan as per ESMS.
Waste management: The depots will generate hazardous waste such as used or spent oil, empty barrels/containers/ liners contaminated with hazardous chemicals /wastes, contaminated cotton rags or other cleaning materials and Chemical sludge from wastewater treatment. The depots will document all categories of hazardous waste generated as part of their operation and store them properly with adequate labelling and secondary containment and ensure disposal through authorized vendors in line with the local regulations. ETP sludge will be disposed through authorized vendors. Waste tyres will be re-treaded and re-fitted till the time tyres are serviceable or replaced by the tyre companies as per agreement. The battery used will be Lithium Iron Phosphate batteries (also known as LFP battery). The e-waste including battery waste generated from the buses will be segregated and stored at site and will be managed by the original equipment manufacturer (OEM)/ electric vehicle supplier private limited or JBM Auto as per the Extended Producer Responsibility (EPR) obligations of OEM who in turn will maintain records of the vendor appointed for disposal of Battery waste. The other waste streams such as paper, cartons, plastics, and iron scrap, will be disposed of through third-party recyclers.
Hazardous Chemicals: The depots store chemicals such a lubricant, coolant, paints, varnishes, lacquers, and thinners and some housekeeping chemicals many of which are flammable.
As part of ESMS update (refer ESAP#2), the company will develop site specific environmental monitoring and management plans covering all resource efficiency and pollution aspects such as noise, vibrations, air emissions, wastewater, hazardous chemicals, and wastes generated from the Project, consistent with national law, requirements of IFC PSs and WBG General EHS Guidelines. The plan while detailing out chemical management will have provision for chemical incident and accident prevention and control procedure that offers specific guidance for storage, transportation, transfer, handling, and disposal of chemicals including: inventory management of chemicals along with name, quantity and place of storage; Material Safety Data Sheet (MSDS) display for the chemicals (at the place of storage); provision for secondary containment trays for containers with hazardous chemicals; and spill kits for spill management. Similarly, waste management will have provision for records on the quantity of waste handled for various waste streams, provision for adequate hazardous materials and waste storage areas (for greenfield and brownfield sites), and manifests are maintained for all waste disposed of through vendors.
PS4: Community Health, Safety and Security
Infrastructure and equipment design and safety: Office buildings in designated high seismic zones will be designed, built, and certified or approved by competent authorities and will form part of EMVPL screening during site/ depot handover by the authorities. E-bus to be mobilised for operations under EMVPL will need certificate for compliance under the Central Motor Vehicles Rules (CMVR) 1989 issued by International Centre for Automotive technology (ICTA), as is the practice for other concessions and verified during appraisal. The certification confirms that the base model complies with the provisions of the CMVR as amended up to date, and is verified based on the use of specific components/ parts/ assemblies etc.
Life and Fire Safety: Charging infrastructure: JBM at group level has developed safety manual and guidelines for EV charging operations which includes work instruction and PPE matrix, do’s and don’ts for charging operations, fire preventions methods in charging station, emergency response plan for EV fire and format for periodic audits. The safety manual will be implemented for EMVPL operations. Sample charging infrastructure review during appraisal were found to be adequate and no material gaps were identified. indicated).
Battery safety: The battery is tested at extreme conditions and design to withstand rough handling, tampering, high temperature and humidity. Electric buses are equipped with safety features to protect the batteries and prevent issues in case of emergencies, including a battery cut-off switch to isolate the battery from the main system, a cooling system to maintain optimal battery temperature, and an advanced battery management system with sensors and Global Positioning System (GPS) tracking to monitor battery health and deter theft.
E-Bus Safety: The bus model and safety requirements in the bus will vary with each CA. EMVPL will ensure that buses provided through its supplier will meet the requirements stipulated in the CA with respective authorities and confirmed by each authority during trial run and buses will be onboarded once approved by authorities. The sample e- buses reviewed as part of the appraisal had extensive emergency provisions including key components on the roof, anti-pinch Sensors for passenger doors, emergency exits, driver-operated emergency switches, fire extinguishers and including Fire Detection & Suppression System (FDSS) kits, surveillance cameras, SOS buttons, and an Automatic Vehicle Location System (AVLS) for real-time monitoring. JBM Ecolife's SOP for maintenance ensures continuous checks on charging, preventive and corrective maintenance, and battery management with onboard sensors and GPS tracking.
Transformer, substation, charging infrastructure including installation, commissioning and operations will be managed through O&M agreements with third party, and the third party will have their SOPs for installation, commissioning and operations. However, as part of ESAP#10, EMVPL will undertake electrical safety audit for sample sites by a competent third-party to cover detailed review of electrical safety standard operating procedures and practices, electrical installations, charging infrastructure installation, commissioning and operation in line with local regulations and applicable industry standards and implement recommendations from the audit. EMVPL as part of ESMS (refer ESAP #2) will update the SOP on electrical safety including the recommendations of electrical safety audit and implement as applicable for the depot operations. EMVPL will put provision for similar audit in future at regular frequency.
Traffic Safety: Route Safety Assessment: As per the current practice, route safety assessments are not conducted for all the routes in which e-bus operates. However, in case there are driver complaints regarding bad road conditions resulting in damage to e-bus, excess consumption of battery power, time delays, a route safety assessment is conducted by the company. These preliminary safety assessments are conducted by the route officers assigned to the Depot. In case of major issues identified, the safety assessment findings are reported to Authority to get an alternative route; in addition, drivers are also trained to handle difficult road conditions and avoid wear and tear of vehicles. As part of ESMS update (refer ESAP#2), the company will update guidelines for route safety assessment on regular frequency which apart from road condition will include hot spot identification or accident-prone areas / road design aspects etc. and corrective actions will be implemented including reporting to authority.
Further, EMVPL will comply with the requirements related to bus drivers which include requirements such as: valid driving license and experience in driving heavy transport vehicle for at least 3 years; not blacklisted from operating heavy commercial vehicle; no pending cases related to fatal accidents or traffic violations; driver receive a combination of classroom instruction and behind the wheel instructions. JBM Ecolife Mobility has a dedicated training team including a head trainer and 4 other trainers and one driver demonstrator. Training team will ensure driver training requirements for EMVPL operations.
Security Personnel: Similar other operations under JBM Ecolife mobility platform indicate that depots typically engage unarmed security personnel through agreement with security contractors registered under Private Security Agencies (Regulation) Act, 2005 which includes aspects such as personal hygiene, physical security, material movements, mob control, firefighting, first aid etc. As per ESAP#2, the company will develop security management plan in line with the requirements of IFC PS 4 which will be guided by the principles of proportionality and good international practice and include procedures to: ensure hiring, rules of conduct, training, and monitoring of security personnel; train security personnel to exhibit appropriate conduct towards depot workers and driver; and to receive and resolve grievances about the security arrangements and acts of security personnel.