PROJECT

Projects

Environmental & Social Review Summary

Project Number

49774

Company Name

SOUTH ASIA GATEWAY TERMINALS (PRIVATE) LIMITED

Date ESRS Disclosed

Jan 28, 2026

Country

Sri Lanka

Region

South Asia

Last Updated Date

Jun 26, 2026

Environmental Category

B - Limited

Status

Pending Disbursement

Previous Events

Approved : Apr 9, 2026
Signed : Jun 24, 2026

Sector

Port and Harbor Operations

Industry

Infrastructure

Department

Regional Industry - INF Asia & Pac

Project Description

South Asia Gateway Terminals (Private) (“SAGT” or the “Company”), (https://www.sagt.com.lk/) is Sri Lanka’s first public-private partnership international container terminal, operating at the Port of Colombo under a 30-year build-operate-transfer (BOT) concession awarded in 1999 by the Sri Lanka Port Authority (SLPA). SAGT’s sponsors are John Keells Holdings PLC, APM Terminals B.V, Maersk B.V, SLPA and Peony Investment SA. IFC was one of the original financiers, with a debt and equity investment in 1999.
SLPA manages and regulates ports in Sri Lanka, including the Port of Colombo, Hambantota Port, and Trincomalee Port. SAGT is one of the five terminals operating at the Port of Colombo, a key transshipment hub for South Asia that serves India, Bangladesh, Pakistan, and the Maldives. The terminal handles approximately two million twenty-foot equivalent units (TEUs) annually. SAGT is currently a major container handling terminal with transshipment accounting for around 85 percent of the container handled at the terminal. Presently there are 10 STS cranes mobilized in different years with the design life of the existing cranes being 20-30 years and four of its cranes have exhausted their useful life. SAGT’s concession will expire on the 5th of September 2029.
The proposed IFC investment of US$20 million will be used to finance the purchase of two new Ship-To-Shore (STS) twin-lift cranes or Quay cranes and may also support the procurement of thirty electric prime movers, including associated charging infrastructure, subject to SAGT’s operational and commercial considerations. Any Environmental and Social Action Plan (ESAP) requirement and associated E&S measures, or requirements referenced in relation to electric prime movers shall apply only if SAGT procures such equipment.
The crane upgrades will support SAGT’s competitiveness and reduce fuel consumption and emissions. No replacement of rail gauges are envisaged as the four new STS cranes shall have the same specifications as per the existing ones and no any construction works are planned or are to be funded with the use of proceeds. For the electric prime movers, SAGT will require installation of the charging shed (around five dual chargers) with charging stations and other associated power infrastructure such as transformers with 33/11 kV lines, and associated substation equipment based on assessment of existing power infrastrucutre at the terminal. Existing maintenance shed will be customised and existing prime movers drivers will be trained on usage of electric prime movers. No dredging (including maintenance dredging) is required for the project as the new equipment will be installed within the existing footprint of the terminal. As per the Concession Agreement (CA)’s conditions, the project does not require any permit or approval from environmental authorities for the new equipment to be purchased as it is merely a procurement of four new STS cranes.

Overview of IFC's Scope of Review

IFC’s E&S review of this proposed investment included: (i) appraising Environmental, Health and Safety (EHS) and social related documentation shared by SAGT, such as EHS policies and procedures, E&S clearances from the Central and Provincial Environmental Authorities, Human Resource (HR) policies and procedures, etc.; (ii) Site visit to SAGT operations in October 2025; (iii) meetings during site visit with SAGT’s management team, including planning, engineering, operations, HSE & HR representatives; (iv) meeting with members of the workers union and third-party workers in October 2025; and (v) contextual screening of SAGT operations.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan