E&S Policies. CMGP has adopted a Group-level sustainable development strategy which outlines its vision and objectives with respect to good governance, human resources, environmental performance and corporate social responsibility (CSR). At Company level, CMGP has adopted policies on Quality, Health, Safety and Environment (QHSE) for its different business lines and subsidiaries. These policies include CMPG’s commitment to environmental protection and pollution control and to guaranteeing safe working conditions in compliance with Morocco legal and regulatory requirements. The policies have been disclosed to the workforce and published on the Company website. Going forward, CMGP will upgrade its overarching E&S policies to commit the performance of all its manufacturing and distribution operations towards IFC Performance Standards (PSs) requirements (ESAP#1).
Identification of E&S Risks and Impacts. CMGP has implemented a QHSE risk assessment and internal audit procedure as part of its Integrated Management System (IMS) management systems and documented in a risk register. Major environmental and OHS risks identified in the risk register include storage, handling and transportation of equipment, disposal of hazardous waste (batteries, rags, paints pots, broken solar panels), road accidents involving distribution vehicle (contractor owned or CMGP’s own fleet). The register does not reflect community health risk.
A sector risk associated with this Project is linked to the commercialization of irrigation equipment. In December 2022 the Ministry of Agriculture acknowledged that exemptions of ‘water abstraction permits’ and ‘water drilling permits’ granted to applicants seeking government subsidies for irrigation projects under the Green Morocco Plan (2008-2018) resulted in uncontrolled water abstraction and further increased stress on limited water resources. It has thus decided to enforce back the compulsory permits, via the ‘water agency’, prior to applying for the government drip-irrigation subsidy for farming projects. However, there is a risk that, if not monitored properly, program beneficiary farmers or distributors may still operate unlicensed water wells or look to engage in drilling or abstracting water without the required permits. CMGP will (i) closely coordinate with BCP to ensure that farmer's applications involving new wells are submitted with the accompanying valid water abstraction permits delivered by the relevant water agency (Agence du Bassin Hydraulique - ‘ABH’); (ii) closely coordinate with BCP to ensure that distributors eligible under the program will only be those demonstrating partnership/compliance with the ABH through an MoU with CMGP (Code of Conduct) and independent verification ; (iii) update its risk register to reflect the community health risks associated with road safety, security management, and well drilling and water abstraction (ESAP#2).
E&S Management System and Programs. CMGP has implemented an Integrated Management System (‘IMS’) based on voluntary management standards for quality (ISO 9001), environment (ISO 14001) and occupational health and safety (ISO 45001). The IMS is structured around ISO certification requirements, with necessary components to implement a plan-do-check-act approach. It includes risk identification and analysis registers, management programs and detailed work instructions, key QHSE functions and personnel roles and competences, workforce training plan, emergency procedures and drills reports, monitoring records, audit and management review reports. To drive continuous improvement, CMGP defines annual objectives and key performance indicators (KPIs) and establishes “improvement cards” to document and track non-compliances and corrective actions for further reporting to management. As part of the system, CMGP has also identified QHSE aspects applicable to distributors, contractors and service providers, defining relevant mitigation measures and KPIs applicable to their various scopes of activities. The current KPIs however are mostly focused on quality management.
CMGP has developed a QHSE master plan which is informed by recommendations resulting from internal risk analysis, internal/external compliance audits or management reviews. The plan outlines preventive and corrective actions with responsibilities, scope of activities, budgets, KPIs, deadlines and escalation procedures when required. The plan is articulated in work instructions and operational procedures. Some of the key procedures reviewed include the regulatory compliance monitoring procedure which inventories periodic checks and inspections; the workplace OHS management and monitoring procedure; the QHSE training and awareness plan, the accident reporting and investigation procedure and the waste management procedure. Most of the environmental and OHS plans are commensurate with the E&S risks and impacts of CMGP’s operations. The Company will review its existing E&S management plans and implement additional Standard Operating Procedures (SOPs) to further align its IMS towards a PS-compliant ESMS, based on the updated risk assessment, including with a Security Management Plan and a Road Safety Management Plan. CMGP will ensure the plans cover all its facilities (i.e CMGP, SICDA plants and distribution branches) (ESAP#3).
E&S Organizational Capacity. The E&S management function falls under the responsibility of the Group-level director in charge of organization, transformation and CSR. This director is responsible for the IMS implementation and internal ISO audits. Besides subsidiaries’ EHS staff, this director supervises five (5) staffs, namely Group-level QHSE Manager, SICDA plants QHSE Manager, CSR Manager and two QHSE officers. This Director reports to the CEO and participates in Board meetings to advise on IMS implementation progress, including implementation of the “improvement” cards. The QHSE officers are tasked with daily OHS and environmental management and monitoring at the SICDA factories. The CSR manager oversees stakeholders’ engagement and community outreach programs. CMPG’s senior management approves the Group-level E&S strategy and policies.
The Human Resources (HR) function at Group-level is led by a HR Director. She is responsible for HR policies development and implementation, labour regulatory compliance and performance review, including labour agencies and contractors’ performance such as E&S incidents reporting and corrective actions. She oversees a team of 4 supervisors in charge of HR and administrative operations in SICDA factories and distribution branches. Workshop, branch managers, and distribution teams equally have E&S responsibilities defined in their roles as part of the IMS. Independent consultants are hired for ISO certification audits and environmental/OHS monitoring (emissions, effluents, workplace nuisance etc.) as per regulatory requirements. CMPG provides QHSE training to its workforce and distributors. The E&S and HR teams are considered competent and experienced to implement PS requirements, including proposed ESAP items.
Emergency Preparedness and Response. CMGP has documented an emergency response procedure which identifies potential accidents. The procedure describes emergency scenarios and specifies responsibilities, measures and necessary resources. Scenarios anticipated include fire, falls, electric shock, road accidents, toxic releases etc. The procedure also provides for new staff briefing and employee annual refresher training. It is further substantiated at all facilities by emergency signage, contact numbers and instructions displayed conspicuously. The factories and warehouses are equipped with adequate emergency systems, including fire hydrants, extinguishers, automatic sprinklers, smoke and heat detectors and alarm systems with dedicated water storage and emergency exits. Each facility has a trained emergency response team and performs routine drills. Emergency training including on fire response, first aid gestures and hazardous material based on material safety data sheets (MSDS) is organized with the support of external experts. The local fire police conduct periodic controls which CMGP’s facilities have passed successfully. Drill reports evaluate team preparedness level, coordination and engagement and formulate recommendations accordingly.
E&S Monitoring and Review. The IMS includes a protocol for QHSE and HR monitoring and reporting. The QHSE monitoring plan defines required parameters and monitoring frequencies for OHS/environmental inspections and mandatory regulatory controls related to different operations (e.g. factory, administration, stores, workshops). Monitoring parameters are defined based on KPIs approved in the annual objectives and tracked in the QHSE dashboard. KPIs include total number of accidents, lost-time injuries, water quality and consumption, energy use, solid waste, occupational noise, OHS training, number of controls performed and evaluation of service providers. Environmental and workplace OHS monitoring is performed by accredited organizations as per country regulations; emergency systems undergo periodic checks conducted by local fire police. Annual ISO certification audit of the IMS is carried out by external auditors. The QHSE team monitors corrective actions resulting from controls and documents non-conformities and opportunities for improvement in the “improvement cards” shared with senior management. A quarterly management review meeting is held to review the effectiveness of the IMS. The outcomes of this review are analyzed and prioritized for follow-up. CMGP publishes its E&S performance in its annual reports, available at https://cmgp-cas.com/nos-realisations/.