Environmental and Social Policies. The company manages its facility in compliance with national legal and regulatory requirements. KB has yet to formalize an Environmental, Occupational Health and Safety and Security (EHSS) policy (ESAP#1) aligned with IFC PS1 requirements. For its fruit sourcing from third-party suppliers, the company has yet to develop a Supplier Code, including documented EHS procedures for supplier risk screening, management and monitoring. These procedures are currently being formalized into an E&S Management System (ESMS). Going forward, KB will develop and implement an ESMS manual, including EHS Standard Operating Procedures (SOPs) commensurate to the E&S risks and impacts associated with its facility. In addition, the ESMS manual will formalize the screening and review process of its third-party fruit suppliers, especially on issues of harmful child labor, forced labor, significant OHS risks (e.g. use of pesticides and sharp knives) and risk of conversion of natural/critical habitats (ESAP#2).
Environmental and Social (E&S) Risk Assessment. Based on information provided during IFC appraisal, Kings Beverage appears in compliance with applicable national legal and regulatory EHS requirements for its facility. Further validation of the compliance of all legal EHS requirements will be carried out during the development of the ESMS Manual (ESAP#2). Elements of a legal register has been sighed during IFC appraisal, including review of copies of operational permits and licenses for its water bottling and CSD facility. These included the Environmental Impact Assessment (EIA) License Certificate, Sierra Leone’ Environmental Protection Agency’s (EPA) License’ Terms and Conditions (T&Cs), Ministry of Health and Sanitation’ Health & Safety compliance certificate, Sierra Leone Standard Bureau Food Microbiology and Chemical Analysis Certificate (ref. CSD), water purification certificate (ref. bottled water finished product), National Fire Force training Certification, and Sierra Leone’ water and electricity regulatory commission permit for the stand-by generators.
The E&S risk assessment and mitigation measures of the facility is currently part of the food safety and quality certifications from local government. KB undergoes comprehensive inspection of its operations from the Standards Bureau of Sierra Leone every 3 to 6 months. In addition, KB is inspected every 6 months by the Ministry of Health and Sanitation which any pending issues are shared with KB (ref. inspection report on occupational health and safety). Going forward, the company will develop an E&S risk assessment matrix, including risks associated with the company’s production activities, owned vehicles, warehouses, and laboratory (ESAP#3). As mentioned above, it will also develop/implement a risk screening checklist for its third-party supplier and selection (ESAP#2).
EHS Management System and Programs. The company is in the process of establishing an Integrated EHS management system, including SOPs Manual and management programs at its facility (ref. ESAP#2 above). Performance-based EHS requirements of this system are based on compliance with the national EHS/HR legal and regulatory requirements mentioned above. Going forward, performance-based requirements will be aligned with the IFC PSs requirements and applicable WBG EHS Guidelines. Based on the EPA License’s T&Cs, KB conducts quarterly environmental reviews of the implementation effectiveness of its E&S Management Plan (ESMP), as required by these T&Cs. Based on this ESMP framework, EHS procedures and training plan have been developed, covering issues such as Life and Fire Safety (L&FS), electrical safety, first aid, facility’s safety procedures and operational instructions required to be followed by staff. Going forward, KB will roll-out an expanded EHS Training Plan, including training on HR manual, ESMS (including fire drills), Supplier Code, etc. to be provided to all permanent/temporary workers, contractors and service providers (ESAP#4).
EHS organizational structure and competency. The facility’s general manager is currently responsible for overseeing EHS compliance with the License’ T&Cs. A team, managed by the operations manager and composed of the line managers, HR manager, technical manager and production manager, is responsible for EHS monitoring and reporting. The operations manager reports to senior management through weekly meetings to discuss operational issues, including EHS issues. Going forward, the company will identify and appoint a competent E&S officer to be responsible for the implementation and co-ordination of the ESMS; management, monitoring and reporting on EHS performance; coordinating investigations of workplace injuries and incidents and corrective actions and reporting; managing health and safety training (ESAP#5).
Emergency Preparedness and Response. In accordance with Sierra Leone’s regulatory requirements, the company undertook emergency preparedness and response planning for its operations, which includes the development of an evacuation procedure. Fire safety training is provided by the local fire department and is delivered to 5 designated KB staff (fire brigade) who then train new hires. Fire safety training is delivered as part of the induction training of new hires. Refreshers on fire safety awareness are conducted periodically (every 6 months) for all staff. Fire drills are regularly conducted, however not consistently since March 2020 (COVID-19). When conducted, reports are handled by the operations manager. In terms of safety preparedness measures, KB has an assembly point outside the facility, three fire exits in case of an emergency and a manually operated fire alarm. The factory is equipped with 36 fire extinguishers and one placed outside the factory. Fire extinguishers are checked on monthly basis. The local fire department undertakes refilling, as needed. The checked extinguishers are labeled with the latest inspection date. In case of a fire emergency, when there is power outage, there is a fire reel and a battery back-up for the fire hydrant pump. KB will formalize its emergency preparedness and document its Emergency Response Plan (ERP) (ESAP#6).
COVID-19 contingency measures. KB is following the Government of Sierra Leone’ policy on COVID-19 contingency measures. No salary or compensation cuts happened due to COVID-19. In addition, working hours were not reduced and the company only experienced one week of work stoppage to assess the situation and plan to resume work under the enforcement of new contingency measures. The measures that came into effect include the installation of a sanitization chamber, one side facing security at the outer gate of the facility and the other side leading to the entrance of the plant. Everyone on site is instructed to wear a face mask and gloves. Sanitization is provided at the facility and at the management residential area behind the factory. KB maintains a 3-month stock of masks and hand sanitization which are imported from India.
EHS Monitoring and Reporting. Under the Environmental Permit’ T&Cs, the ESMP entails valid medical certificates for staff at employment, safety and first aid training for all staff, health promotion posters, repair finished product area floor from cracks, reconstruct production area floor to prevent spill related accidents, paint the raw material area metal floor to avoid corrosion, provide borehole inspection chambers with tight fitting covers to prevent contamination, raw water and finished products to be tested by an approved laboratory, provision of changing rooms for staff, observe working hours not to exceed 8 hours per day, and, addition of four fans to the production room, 3 fans in the finished product room and three fans in the raw material store.
At the facility was recently commissioned, there is a very narrow coverage of EHS parameters which will need to be broadened to capture IFC PS requirements, including WBG EHS Guidelines for beverage production. Most of the EHS parameters analysis are currently undertaken at its own lab and at the Ministry of Health’ labs. Based on results shared during the appraisal, all parameters are meeting the local regulatory requirements since the commissioning of the plant in March 2020. Going forward, the client will develop a comprehensive EHS monitoring framework in line with IFC PS requirements and WBG EHS Guidelines (ESAP#7). This will include the definition of a set of Key Performance Indicators (KPIs), including monitoring frequency, methodology, and responsibility center which will be captured in the ESMS manual.
Supply Chain Risk Assessment and Management. As the company will install a new fruit production line in its existing facility, it will expand its direct sourcing of fruit from third-party suppliers to achieve up to 85% of its raw material needs. The company has identified three main suppliers (farms) but has not yet entered into contractual (sourcing) agreement with these fruit suppliers (e.g. pineapples, mangoes, oranges and cashew fruit). In case of shortages, additional fruit may have to be sourced directly from smaller local farms and/or through aggregators. In anticipation of this additional fruit sourcing volumes, the company will develop a Supplier Code of Conduct and screen/qualify these additional suppliers against PS2/PS6 supply chain requirements. Effective implementation of the Supplier Code will be independently verified on an annual basis (ESAP#2). The results of the risk screening for the three farms using IBAT and Global Forest Change (GFC) are described in the PS6 section. Risk screening using the GMAP and the ILAB Sweat & Toil did not document risks associated with the production of fruits sourced by KB as raw material.