Environmental and Social Management System (ESMS): Humania currently does not have ESMS at the platform level. EHS polices, objectives and procedures are incorporated at the asset level for operations (e.g. SGH Cairo) and during construction (e.g. SGH Alexandria hospital). An overarching function with cross platform strategy and policies will be appointed at platform level once Humania Holding Company is incorporated with centralized functions (ESAP1). As per ESAP 1, Humania shall develop and implement an environmental and social management system at platform level to cover: i) E&S due diligence for acquisitions; ii) management plans for waste and effluents iii) identification of impacts, including land acquisition, biodiversity and chance finds, for greenfield projects and iv) EHS management plans and procedures for the new hospitals, inpatient healthcare facilities and outpatient healthcare facilities. This ESMS must be endorsed by senior management and communicated to all levels within its organization and subsidiaries. The Humania organizational structure will include the essential functions EHS, Supply Chain, HR, IT, Finance, Analysis and Reporting that will oversee and coordinate all related activities at each individual hospital SGH Cairo, Casablanca and Alexandria via the respective hospital based operational management and EHS teams.
As for asset level, the EHS plan for SGH Cairo is fully functional and adequately staffed with experienced professionals in quality, resource efficiency, infectious control, occupational and health safety, life and fire safety and security management. Its quality management system, the environmental management system and the occupational health and safety management system have been developed consistent with the current scope of outpatient healthcare services and are regularly monitored by SGH’s Environmental, Health and Safety Committee. The management systems include the following manuals, policies and procedures; i) Health, Safety and Environmental Plan with relevant policies and procedures, ii) Standard Operating Procedures, iii) Fire policy, program including procedures and measures for fire prevention, detection, abatement, fire fighting and emergency measures, fire drills, continuous education, iv) Infection Control Guidelines, and v) a Security Management Plan.
SGH Alexandria construction related activities are managed by the BAB owned related EPC party IHCC, a specialized turn key provider of design and construction for health care facilities. IHCC possess adequate EHS construction related management policies and plans, that incorporate sustainable principles into project delivery. IHCC is certified with ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. IHCC HSE plan describes requirements for safety and health measures to be implemented by contractor and sub-contractors at the work at Saudi Germen Hospital – Alexandria project during the construction phase of the project. The requirements are applicable to all IHCC employees, workers, sub-contractors and visitors along with temporary workers and daily wedges.
The SGH Cairo currently has ISO 22000 Food Safety Management system and have passed accreditations for Joint Commissioning International Accreditation for hospitals (JCIA), Trust Effective Medicine Optimized Services (TEMOS) (i.e. certification in quality in medical treatment and non-clinical services for international patients) and Canadian Accreditation Qmentum International accreditation requirements. SGH Cairo has officially become the first hospital in Egypt and Africa to receive the Canadian International accreditation with the highest Diamond accreditation level.
Similar approach in development of adequate EHS management system in SGH Alexandria, SGH Medical Tower and Casablanca SGH hospitals is being/will be applied for construction and operational phases.
Identification of Risks and Impacts: SGH Cairo Humania has commissioned Qmentum International to assess the SGH’s leadership, governance, clinical program and services against Accreditation Canada requirement for quality and safety, including emergency and disaster preparedness.
SGH Alexandria hospital is being constructed by IHCC with a prior obtained construction permit, which specifies EHS requirements during construction. The detailed construction related EHS requirements are specified in a separate plan “Health, Safety and Environment Requirements – SGH project Alexandria” drafted by IHCC.
Construction of new hospital in Zenata, a suburb of Casablanca, will start by Autumn and will be developed on land that has been already acquired and provided by the Moroccan state authorities and according to the Zenata Eco-city Master Plan. The Master Plan was developed following principles of sustainable development integrating socio economic responsibilities, management of environmental impact and with stakeholders’ engagement. All related infrastructure and utility for the SGH hospital will be provided by the Zenata Eco-city Management. As per (ESAP2) SGH Casablanca will complete the ESIA in accordance with good international practices and in line with the requirements of IFC Performance Standards. The ESIA will include the Construction Environmental Health and Safety Plan (CEHSP).
As per ESAP 1 and the EHS capacity that will be established, Humania will be able to assess construction and operational EHS risks for its future expansions in Casablanca, Medical Tower Cairo and any future developments in accordance with good international practices and IFC Performance Standards.
For operations of the existing and to-be-operational facilities, Humania is/will use good practice established by its Cairo SGH hospital and its EHS management systems, procedures, plans, SOPs and manuals. As part of the regular reaccreditation / certification in JCI, ISO 22000, and others and its internal and external monitoring the SGH Cairo is identifying corrective measures, developing improvements plans and disseminating throughout the facilities. The same approach will be utilized in other facilities once they become operational.
Management Programs: The management programs in the Cairo SGH healthcare facility identifies annual quality improvement plans from their quality management system gap analysis reports, environmental safety and quality improvement plans. The annual quality improvement plan contains objectives and programs that provide a framework for a systematic, integrated and organization-wide approach to monitor, assess and improve patient care, health and safety, waste management and organizational performance at the healthcare facilities.
Management programs as related to construction phase in SGH Alexandria are determined by IHCC own ESMS, which we found adequate.
Organizational Capacity and Competency: The EHS function at the Humania platform level is yet to be established, it will have full time EHS manager (ESAP 3) appointed at a corporate level with the experience required to assess and manage the EHS risks and impacts of its operations including construction related activities performed by EPC. The EHS manager will be fully qualified to be able to perform complex corporate EHS function, be responsible for enhancing and implementing at the corporate level the ESMS and ensure that the new hospitals and acquired healthcare facilities develop and implement their site specific ESMS in line with corporate EHS policy requirements, conduct monitoring of EHS performance and report to Humania management team on E&S performance and challenges.
Emergency Preparedness and Response: The SGH hospital has a comprehensive Disaster Preparedness Plan and Evacuation Plan with policies and procedures that cover emergency response and protect life of staff and patients in case of fire, smoke, flooding or potential exposure to hazardous material, terrorist attacks, and structural damages. DPP deals with all eventualities related to various emergencies. The plan represents a comprehensive engineering, architectural and administrative controls such as proper design, selection of the location of the structure, architectural segregation, selection of adequate material and its functionality, utility systems, ventilation, electric power system, communication, water supply systems, medical gas system, fire suppression system, emergency exit, medical equipment, safety and security of people, equipment and supplies, control of food and waste, decontamination practices and prescribes procedures and assigns responsibility for each responsible staff. The DPP also prescribes means and procedures how to inform local communities for emergencies and disasters. Separate plans exist for emergencies like HAZMAT spill i.e. chemical spill / leakage “Code Orange” and in case of mass casualty incidents like severe traffic incidents, explosions, fires, etc that would overtake the routine capabilities of Emergency Departments and other ancillary services e.g. Diagnostic Imaging.
As part of ESAP 1, Humania will develop and implement a corporate emergency preparedness and response plan including all probable emergency scenarios (fire, earthquake, terror attack, civil unrest, violent patient/family, etc) in line with IFC PS1 requirements which will be adopted by the new hospitals and the healthcare facilities.
Monitoring and Review: SGH Cairo carries out internal quality assurance audits against its Standard Operating Procedures (SOPs) and legislative requirements. Results of these audits are assessed by the Quality Assurance department and reported to the CEO of the hospital, who is ultimately responsible for correcting any performance issues. As part of the regular reaccreditation / certification in JCI, ISO 22000, and others international certification programs and its internal and external monitoring the SGH Cairo is identifying corrective measures, developing improvements plans and disseminating throughout the facilities. These corrective actions include for example improvement in waste management systems to meet best practice standards; ensuring best practice in hand hygiene and infection control at all healthcare facilities; fire safety, energy savings, water usage and conservation; reduction of losses at the pharmacies and laboratory and improvement in internal and external communication. The same approach will be utilized in other facilities once they become operational. As part of the corporate ESMS, Humania will formalize the platform level monitoring and reporting so that they could benchmark performance and share experience across hospitals.