Environmental and Social Assessment and Management System
Setrag is a subsidiary of the Eramet Group which has a Sustainable Development Policy, an Environmental Policy, and an Ethics Charter. As required under the ESAP agreed for the initial investment, Setrag developed its own Environmental and Social Sustainability Policy in line with IFC’s Performance Standard 1. Most elements of an adequate Environmental and Social Management System (ESMS) are now available. There are procedures and teams responsible to ensure that: i) Setrag is in compliance with all applicable laws and regulations; ii) all environmental licenses are obtained for the different activities; and iii) the Environmental and Social Management Plans (ESMP), the Resettlement Action Plan, and the Biodiversity Action Plan are implemented. There are management programs and procedures covering aspects such as: environmental and occupational health and safety (OHS) procedures for contractors involved in refurbishment activities, train safety, vehicle safety, hazardous and non-hazardous waste management, spill management, chance find procedure, emergency preparedness and response plan, anti-poaching patrolling, pedestrian awareness raising, stakeholder engagement including a grievance mechanism. The stakeholder engagement plan (SEP) was developed in line with requirements of this Performance Standard. So far and given the scope of the project, its implementation has been focused on engagement activities needed for the implementation of the resettlement program, as discussed under Performance Standard 5 below. Going forward, the SEP will also focus on pedestrian safety and awareness related to railway crossing and other activities that take place in the vicinity of the railway corridor. This will include awareness raising on emergency response in cases of accidents.
Identification of Risks and Impacts
A number of environmental and social audits and action plans have been undertaken for the railway refurbishment projects. Setrag conductedan Environmental and Social Audit (2015), an Environmental and Social Management Plan (2015), a Resettlement Framework (2015) and a Resettlement Action Plan (2017), and a Biodiversity Action Plan (2015). All reports are in line with requirements of this Performance Standard. In accordance with the Environment Law (dated August 26, 1993) and consistent with IFC’s Performance Standards, Setrag also developed the following environmental studies: Environmental and Social Impact Assessment (ESIA) of sand extraction in the Ogooue River (2017), abridged ESIA of the sleepers plant in Booué (2016), abridged ESIA of the refurbishment project Kango-Franceville (2017), and abridged ESIA for workers accommodations in Lastourville, Moanda, and Ndole (2013).
As indicated above, the project footprint does not exceed the existing railway corridor and rehabilitation works will be confined within the 30-meter wide safety corridor. Sources of risks and potential impacts associated with this project include use of machinery and transportation, presence of workers (one team of up to 100 workers), storage and disposal of hazardous materials including used sleepers, refurbishment of infrastructures, and presence of unstable track bed zones/slopes along the corridor, and the presence of informal settlers and informal economic activities within the safety corridor. Main E&S risks and issues are as follows: soil erosion and slope instability, air and water pollution, noise, waste production and contaminated sleepers, occupational health and safety risks, influx of workers, community health and safety risks, and resettlement of informal settlers.
The project is located in a country where the risk of Gender-Based Violence (GBV) is substantial due to the legal context, gender norms and beliefs, and actual capacity to respond and manage GBV issues. As part of this investment, a gender and GBV assessment will be undertaken. Among others, this will include a review of the Human Resources policy to include a policy on addressing sexual harassment. The client will review and, if necessary, revise procedures for implementing these policies to ensure and measure effectiveness and consistent usage and include recommendations for training, etc. The assessment will also include the risks and impacts to host communities of the project, such as for example the influx of contractors/migrants, and improvement measures for women safety along the railway corridor and in stations and supporting infrastructures. Based on the findings, Setrag will develop and implement an action plan (e.g. influx management; railway stations improvement measures such as safe waiting areas, adequate lighting in parking lots, separate toilets, CCTV; sufficient lightening around family houses; and improvement to existing stakeholder engagement plan and community grievance mechanism) that is designed to manage such risks and impacts effectively. The plan will include gender-specific mitigation measures to ensure risks are mitigated and will be included in the ESMS (ESAP #1).
Gabon is very rich in terms of biodiversity. The railway runs through natural habitat for about 80% of its length and passes through the Lope National Park (for 62 km), a World Heritage Site, the Bas Ogooué Ramsar Site (for 56 km), and the Rapides de Mboungou Badouma Ramsar Site (for 30 km). Based on the reviews carried out as part of the first investment, it was confirmed that Lope National Park, and the two Ramsar sites qualify as critical habitats based on criteria 1 (Critically Endangered and/or Endangered species) and 2 (Endemic and/or restricted-range species). Refer to the section on Performance Standard 6 below for more details.
Organizational Capacity and Competency
As part of the actions agreed under the ESAP for the first investment, the team responsible for E&S management was strenghtened and is now composed of eight staff in the E&S department, 17 staff in the OHS and fire safety department, five staff in the Railway Safety department, and seven staff in the Resettlement Bureau (including two senior social specialists, one data base officer, and three field agents) supported by an international resettlement expert. Since 2016 there is also a full-time international E&S coordinator responsible to ensure implementation of the IFC’s ESAP. Under ESAP #2, another senior social specialist will be hired to strengthen the team for the implementation of both stakeholder engagement plan and Resettlement Action Plan, and existing staff will receive adequate training.
Given that the departments above were recently created, their roles and responsibilities and the coordination and communication among departments and with senior management are being defined as part of the initial implementation of the revised organization chart. Setrag’s organizational chart will include an E&S coordinating structure to ensure efficient communications and reporting lines between all E&S related departments, other departments and management. Clear roles and responsibilities will also be defined (ESAP #3).
The HR department offers a range of training programs. For example, in 2018, about 350 workers were trained in first aid, OHS, driving safety, and fire safety. Every year, about 100 workers are trained in fire-fighting and prevention. Thematic occupational health & safety training is provided to all workers every year (e.g., hazardous materials handling, work at height), and use of personal protection equipment. Specific annual training is provided to Safety Chiefs responsible for the safe movement of trains at the stations and to Regulators who are responsible for the safe operations of trains along the entire corridor. The train drivers and their assistants are also trained each year. They are also subject to continuous training and supervision.
Emergency Preparedness and Response
Setrag relies on an Emergency Preparedness and Response Plan (‘’Plan Fer’’), and Crisis Management guidelines in case of emergency scenarios such as natural disasters, fire, explosions, oil and hazardous materials spills, train accidents, terrorism or vandalism. These plans include the identification of areas where accidents and emergency situations may occur, response procedures, provision of equipment and resources, and designation of responsibilities and communication. The emergency plan for fire emergencies is fully in line with IFC’s requirements. For other scenarios, the plans do not include provisions on periodic training to ensure effective response, and community notification. As outlined in ESAP #4, the plans will be updated to include, among others, specific training and practice (i.e., simulations and drills) to ensure effective response, and community notification, and provisions for workers accommodations, in line with good international industry practice as described in the WBG General EHS Guidelines and the recommendations made by the International Union of Railways.
Monitoring and Review
Throughout the initial investment, Setrag has continued to report on key performance indicators to monitor energy and water consumption, air emissions (e.g. SOx, NOx, CO2, metals), hazardous and non-hazardous waste, etc. Relevant information continues to be compiled in a data base (Eragreen) and annual reports to be prepared for senior management. Lost Time Incidence Frequency Rate (LTIFR) and accident free days continue to be compiled in a specific data base (Eralink) and reported monthly. Customers and community complaints are also managed and documented. Progress on resettlement is being monitored (see under PS 5 below), and reports are drafted on a regular basis. A specific data base on resettlement complaints was developed during the first phase of the project. This data base includes a complaint form, a numeric register georeferenced to the location of complainants, and a monitoring system to follow up on the responses. This system is being implemented to include all types of complaints. As part of the reporting requirements under the initial investment, since 2016 the company has consistently reported annually its performance to IFC.