PROJECT

Projects

Environmental & Social Review Summary

Project Number

42222

Company Name

SOCIETE D'EXPLOITATION DU TRANSGABONAIS

Date ESRS Disclosed

Feb 4, 2020

Country

Gabon

Region

Africa

Last Updated Date

Aug 10, 2022

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Jul 16, 2020
Signed : Oct 31, 2020
Invested : Aug 8, 2022

Sector

Rail Transportation

Industry

Infrastructure

Department

Regional Industry - INF Africa

Project Description

This Environmental and Social Review Summary (ESRS) is disclosed in anticipation of a proposed second loan to the Société d’Exploitation du Transgabonais (Setrag or the “Company”) for its 2015-2024 capital expenditure program for the Transgabonais railroad. A first loan was signed in June 2016 (# 34400), and funds were intended to support rehabilitation of the existing infrastructure (replacement of approximately 165 km of sleepers – 102 km achieved by end of October 2019); acquisition of new rolling stock for replacement and expansion of transport capacity; refurbishment of railway stations, track bed repairs in selected unstable zones, refurbishment of workers accommodations ; drainage improvement along the rail corridor; installation of new rail awareness signage and improvement of level crossings.

 

The proposed second facility will allow Setrag to complete the balance of works (the “Project”) estimated at a cost of €256.2 million. IFC proposed investment is an A loan of up to €59.5 million and a mobilization of €44.7 million. The incremental funding will be used to continue the work described above, plus i) replacement of 515 km of sleepers, ii) replacement of 184 km of rails, iii) building of additional safety barriers and pedestrian overpasses, and iv) upgrades to the traffic management system. Best estimates of workforce size covering all tasks is about 500 workers. Phase II is to be started in March 2020.

 

This project is confined to the existing 648 km railway corridor, i.e.  a safety corridor stretching 15 m on either side of the existing railway tracks plus land already acquired for other existing infrastructure. Itwill not result in any new footprint or habitat fragmentation. The legal right of way for the railway extends 40 m on either side of the centerline of the tracks, but to minimize potential social impacts on informal settlers, it has been decided to restrict the works area to the narrower safety/operational corridor.

                                                   

Overview of IFC's Scope of Review

The scope of IFC’s review included assessing the progress of the company in terms of their capacity to oversee and monitor its operations consistent with IFC’s Performance Standards (PS) and implementation of good international industry practice as defined in the applicable and relevant sections of the industry specific World Bank Group (WBG) Environmental, Health, and Safety (EHS) Guidelines on Railways, and the WBG General EHS Guidelines.

 

IFC Environmental and Social (E&S) team’s last site visits were conducted in January and December 2019.  The missions consisted in meetings with numerous stakeholders (representatives of Setrag, and Gabonese National Park Agency), a visit of railway stations, workers accommodations, and the new market set up by Setrag for shop owners located in Owendo.

 

IFC reviewed numerous documents since inception of the first project and during its implementation, including the relevant progress reports and deliverables provided as part of the implementation of the E&S Action Plan (ESAP) agreed under the first investment and disclosed together with the relevant ESRS. Key documents included the Environmental and Social Management Plan, the Biodiversity Action Plan and the Resettlement Framework, all reviewed and approved by IFC in 2015. As part of IFC’s monitoring of the first investment, the following documents were also reviewed:  the Resettlement Action Plan (May 2017); the 2016, and 2018 agreements between Setrag, WWF, the Ministry of Waters and Forests and Gabonese National Park Agency, the 2017 Rail Operational Safety Audit Report, the 2017 Fire Safety Audit of railway stations and passengers trains, the 2017 Environmental and Social Impact Assessment (ESIA) of sand extraction in the Ogooue River, the 2016 abridged ESIA of the sleepers plant in Booué, the 2017 abridged ESIA of the refurbishment project Kango-Franceville, and the 2019 Occupational Health and Safety Management System Audit Report. A lenders’ E&S monitoring consultant (ERM) was appointed in 2017 and their recent reports (February 2018, June 2018, May 2019, and September 2019) have also been instrumental for IFC’s review. The relevant assessments and plans are disclosed together with this ESRS.

 

E&S performance of the first project has been affected by delays in completing the agreed Environmental and Social Action Plan (ESAP) with respect to the agreed timelines.  The reasons for the delays were discussed with Setrag and were partly related to the project implementation timeline. Consequently, lenders and company have agreed on corrective actions which have been included in the ESAP for this proposed investment and as conditions of IFC’s commitment.

                                                   

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan