PROJECT

Projects

Environmental & Social Review Summary

Project Number

36898

Company Name

CIMENTERIE DE LUKALA

Date ESRS Disclosed

Jul 24, 2015

Country

Congo, Democratic Republic of

Region

Africa

Last Updated Date

Dec 1, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Oct 2, 2015
Signed : Nov 13, 2015
Invested : Jun 28, 2016

Sector

Cement

Industry

Manufacturing

Department

Regional Industry - MAS Africa

Project Description

HeidelbergCement (“the company”), a large international aggregates and cement company, has acquired a majority stake in the existing CILU Lukala cement plant in Bas Congo, Democratic Republic of Congo (DRC) in 2010. At that time the cement plant was in need of substantive rehabilitation and upgrade and since the acquisition, HeidelbergCement has worked on improving the operations. In May 2015 HeidelbergCement gained full control of the cement plant and has defined the remaining needs for the requisite upgrade. So as to support the upgrade HeidelbergCement has requested IFC to provide financing.

CILU Lukala has been in operations since 1921. The initial operations were based on vertical kilns and in the 1970’s these were replaced by the current vertical rotary kiln with a four stage pre-heater. The focus of the current upgrade involves replacement of the existing systems with a new five stage pre-heater kiln with a pre-calciner, replacement of the limestone crushers, increasing the clinker grinding capacity and installation of new bagging and dispatch facility with rotary packers, a new staging area for vehicles dispatching cement, and rearrangement of certain site components. These developments will result in the capacity increasing from 330,000 tons of clinker and 450,000 tons of cement to 580,000 tons and 750,000 tons of clinker and cement per annum respectively. In addition, there will be improved plant reliability and energy efficiency, improvements to point source emissions, and improvements in site administration and management (e.g., human resource, environmental management, etc.) to ensure alignment with the HeidelbergCement standards as applied internationally.

IFC has an existing equity investment in Scancem, a holding company owned by HeidelbergCement, for various other operations in Sun-Saharan Africa and the environmental and social performance of these activities is considered satisfactory.

An engineering, procurement and construction (EPC) contract has been signed with Sinoma International, an experienced Chinese equipment supplier and construction company, with construction start expected in the second half of 2015 and project commissioning during the second half of 2017.

Overview of IFC's Scope of Review

IFC’s environmental and social due diligence of this project included meetings with company officials at the CILU Lukala cement plant responsible for overall plant and project management, as well as for human resources, environmental health and safety, and social services. The due diligence also included field visits to the following locations:

The cement manufacturing facilities in Lukala
Proposed site for the new cement manufacturing plant (within current company owned land)
Main roads providing access to the project site (National Highway 1 from Kinshasa to Matadi)
The Lukala village which is used by the CILU operations for staff quarters and provision of related social services (health care, schooling and outreach services).

The IFC appraisal considered environmental and social management plans for the current operations, the proposed upgrades, and gaps, if any, between these plans and IFC requirements. Wherever necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed with this review summary. Through implementation of these management plans and the ESAP, the project is expected to be designed and operated in accordance with the Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan