PROJECT

Projects

Environmental & Social Review Summary

Project Number

36735

Company Name

Wasion Holdings Limited

Date ESRS Disclosed

May 13, 2015

Country

China

Region

East Asia and the Pacific

Last Updated Date

Jun 26, 2026

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : May 29, 2015
Signed : Jun 1, 2015
Invested : Jun 9, 2015

Sector

Other Machinery (Including Metalworking Machinery, Ventilation, Heating and Air-Conditioning, etc.)

Industry

Manufacturing

Department

Regional Industry - MAS Asia & Pac

Project Description

Founded in 2000 and headquartered in Changsha, Hunan Province, China, Wasion Group Holdings Ltd. (“Wasion” or the “company”), is a leading manufacturer of advanced energy metering equipment and provider of efficiency management services in China. The company is listed on the Hong Kong Stock Exchange (http://www.wasion.com).

Wasion currently has one operating manufacturing facility, occupying some 260,000 sqm of land, located in an industrial zone on the outskirts of Changsha, Hunan Province. The company produces its energy metering equipment at this facility, which also houses a R&D center, corporate office and dormitories for its workers.

Wasion is planning to expand its operations by constructing an identical new facility (same scale and size as the existing facility) in the Jiuhua Economic Development Zone, Xiangtan, Hunan Province, a frontier region in China, to develop its Advanced Distribution Operations (ADO) business, which provides integrated smart distribution devices and solutions to a wide range of industrial clients, including both utility companies and the end users.

Established in 2003, Xiangtan Jiuhua Economic and Technical Zone is the demonstration and pilot area for resource-conservation and environmental-friendly manufacturing, and was approved as a state-level economic and technical zone in September, 2011. Construction of the new facility has been completed, and the manufacturing equipment and machinery was being commissioned at the time of appraisal site visit in April 2015. Wasion plans to start and scale up the operations in the new facility in a phased manner over the coming years.

IFC is considering a corporate investment in Wasion, to support establishment of the new facility in Xiangtan, Hunan Province (the “project”).

Overview of IFC's Scope of Review

IFC’s review of this proposed investment consisted of appraising technical; environment, health and safety, (EHS) and social related information submitted by Wasion, such as its EHS policies and procedures, management manual, organization chart, human resources (HR) policies and procedures; EHS related key performance indicators (KPIs) and monitoring reports. The appraisal also included a site visit to Wasion’s corporate office and operational manufacturing facility in Changsha and discussions with its senior management as well as the technical, HR and EHS teams.

IFC’s appraisal considered environmental and social (E&S) management plans for the project and gaps, if any, between these plans and IFC requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow. Through implementation of these actions, the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support