PROJECT

Projects

Environmental & Social Review Summary

Project Number

36378

Company Name

VITOL UPSTREAM GHANA LIMITED

Date ESRS Disclosed

May 22, 2015

Country

Ghana

Region

Africa

Last Updated Date

Sep 20, 2025

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Jun 16, 2016
Signed : Dec 14, 2016
Invested : Mar 24, 2017

Sector

Oil and Gas Production (Includes Development)

Industry

Metals and Mining

Department

Regional Industry - INF Africa

Project Description

This ESRS has been revised to reflect an update on the public review and public hearing, as part of ESHIA process, the issuance of the environmental permits and the disclosure of the final ESHIA. There are no material changes to the environmental or social risks and/or impacts of the project.

The Sankofa and Gye Nyame gas fields (“Sankofa Gas Field”) and the Sankofa East oil field are located 55 to 60 km offshore in the Western Region of Ghana. The fields are part of the Offshore Cape Three Points (OCTP) block. Water depths in the block range from approximately 520 meters to 1014 meters. The OCTP project (“the project”) will be developed by a joint venture (JV), composed of Eni Ghana Exploration and Production Limited (“Eni Ghana”), the operator of the block holding 44.444% participating interest, Vitol Upstream Ghana Limited (“Vitol Ghana”) holding 35.556% participating interest, and Ghana National Petroleum Corporation (GNPC) holding 20% (15% carried and 5% paid) participating carried interest.

The project encompasses (i) the development of the Sankofa East oil field, with first oil production planned for 2017; and (ii) the development of non-associated gas in the Sankofa and Gye Nyame Gas Fields, with first gas production planned for 2018. Estimated discovered volumes in place are 481 million barrels of oil and 1.45 Tcf of non-associated gas.

The OCTP project will be developed as an integrated oil and gas development project, utilizing a shared, new conversion, double-hulled floating production, storage and offloading unit (FPSO), and will consist of:
- 14 (fourteen) wells for the oil exploitation: 8 (eight) oil production wells, 3 (three) water reinjection wells, and 3 (three) associated gas injection wells. Oil from the wells will be transferred to the FPSO via flexible risers. The estimated peak oil production will be 45,000 barrels per day (“bpd”).
- 5 (five) wells for the non-associated gas exploitation; subsea umbilicals, risers and flowlines from the five non-associated gas wells to the FPSO; 63 km long subsea pipeline from FPSO to shore; 1.5 km long onshore pipeline from shore approach to an onshore receiving facility (ORF) at Sanzule, including compression station, accommodation camp, warehouse, workshop, firefighting station, helipad, and medical facility; and a tie-in to the existing Ghana National Gas Company (GNGC) sales gas 20-inch pipeline. The production plateau is expected in 2018. Sanzule is located about 10 km east of the GNGC gas plant near the town of Atuabo on Ghana’s west coast.

Existing onshore logistics base located in Takoradi will be used for the project. This onshore base has been built anew under Eni Ghana’ supervision and will provide warehousing, office and supply support to the project. The majority of onshore logistics support infrastructure in Takoradi is already in place.

The total cost of the project is estimated at approximately $8 billion (current values). The proposed World Bank Group support to the final project security and financing structure includes the following:
1) World Bank (IDA) Guarantees to support the gas development;
2) MIGA guarantee against the risks of transfer restriction, war and civil disturbance, expropriation, and breach of contract on behalf of commercial lenders (yet to be identified) to cover non-shareholder loans to Vitol Ghana in support of the gas field development; and
3) IFC loan as part of a debt financing package for Vitol.

Overview of IFC's Scope of Review

WBG’s Environmental and Social Due Diligence for this project consisted of appraising technical, environmental, health, safety and social information submitted by Eni Ghana and Vitol Ghana, including the following:

- Environmental, Social and Health Impact Assessment (ESHIA) for the development of the Sankofa East Oil Field (Phase-1), issued for submission to authorities and dated January 2015, and the draft ESHIA for the development of the Sankofa Gas Field (Phase-2), dated March 2015;
- Available project E&S information, including environmental and social baseline reports, Stakeholder Engagement Plan (SEP), stakeholder registers, project background information document, Health Safety and Environment (HSE) Plan, draft Development Drilling & Production Operations Oil Spill Contingency Plan, and Waste Management Plan;
- Eni Ghana’s HSE Integrated Management System (IMS) and relevant Eni corporate-wide policies and Management System Guidelines (MSG);
- Eni Ghana’s human resources (HR) and procurement management procedures and practice;
- Vitol Exploration and Production (Vitol E&P), which is Vitol Ghana’s parent company, and Vitol Ghana HSE policy statements and management system, including management plans associated with offshore drilling operations carried out for Sankofa-1A exploration well.

IDA and IFC environmental and social (E&S) specialists conducted a site visit to the area of the project in January 2015 and met with senior management and technical staff of Eni Ghana, Vitol Ghana and Vitol E&P, deputy executive director and senior program officers of the Ghana Environmental Protection Agency (“Ghana EPA” or “EPA”) and representatives of the community of Sanzule where the ORF will be located. Prior to and after the site visit, several meetings and conference calls were held with Eni Ghana and Vitol staff responsible for the environment, health and safety, human resources and corporate social responsibility.

This Environmental and Social Review Summary was jointly prepared and disclosed by IDA, IFC and MIGA.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
2 - LRP for GHANA OCTP BLOCK Phase_Final Signed.pdf
3 - pln ms hse 013 eni Ghana r00 - Marine Traffic Management Plan_Final.pdf
24 - pln ms hse 006 eni ghana r00 - OCTP Cumulative Imp Mitig Strategy.pdf
pln ms hse 019 eni Ghana r04_Appendix F NNL Wetlands Strategy_Final Clean .pdf
plan ms hse 019 eni Ghana r03 - Appendix E Flora Conservation Plan.pdf
20 - pln ms hse 019 eni Ghana r00 - Appendix D Critical Habitats Screening.pdf
pln ms hse 019 eni Ghana r04 Sea turtle BAP Clean.pdf
plan ms hse 019 Eni Ghana r04 Avian_01_12_FINAL Clean.pdf
17 - pln ms hse 019 eni Ghana r00 - Biodiversity Management Plan.pdf
16 - pln ms hse 014 eni Ghana r00 - Appendix A MMST Monit Prog_Final.pdf
15 - pln ms hse 014 eni Ghana r00 - MMST PPP_Final .pdf
15 - pln ms hse 014 eni Ghana r00 - Appendix A MMST Monit Prog_Final.pdf
14 - pln ms hse 011 eni Ghana r00 - Off Haz Mat MP_Final.pdf
13 - plan ms hse 010 eni Ghana r01 - PPCMP.pdf
12 - Stakehdolder Engagement Plan_Annex A SUST-PRO-007-01 Grievance Mechanism.pdf
11 - SUST-PLN-010 02_OCTP Ghana FMP_Signed for Disclosure.pdf
9 - rep ms hse 009 eni ghana r00_BirdPreconstructionSurveyReport.pdf
8 - rep ms hse 008 eni ghana r00_SeaTurtlesPreconstructionSurveyReport.pdf
7 - SUST-PLAN-007 00 - Community Health Management Plan_Final Sig....pdf
6 - SUST-PLAN-003 00 - Workers Management Plan_Final Signed.pdf
5 - SUST-PLAN-001 00 - Recruitment EmployTraining Plan_Final Sign....pdf
4 - SUST-PLAN-002 00 - Local Content Development Plan_Final Signed .pdf
10 - SUST-PLAN-004 00 - Influx Management Plan_Final Signed.pdf
1 - pln ms hse 009 eni Ghana r00 - OCTP ESHMP_Final.pdf
NTS_eni Ghana OCTP phase 1_Final.pdf
ESHIA for GHANA OCTP BLOCK Phase 2 - Final Version - Volume 2 Annexes.pdf
ESHIA for GHANA OCTP BLOCK Phase 2 - Final - Volume 1 Report.pdf
ESHIA for GHANA OCTP BLOCK Phase 1 - Final - Volume 2 - Annex 3 Attachments.pdf
ESHIA for GHANA OCTP BLOCK Phase 1 - Final - Volume 1 Report.pdf
PS1_36378.doc
PS3_36378.doc
SUST-PLN-010 02_OCTP Ghana FMP_Signed for Disclosure.pdf
01 - plan ms hse 009 eni Ghana r01 - OCTP ESHMP_Final.pdf
03 - plan ms hse 013 eni Ghana r01 - Marine Traffic MP_Final.pdf
05 - SUST-PLAN-001 01 - Recruitment EmployTraining Plan Final.pdf
06 - SUST-PLAN-003 01 - Workers Management Plan Final.pdf
07 - SUST-PLAN-007 01 - Community Health Management Plan Final.pdf
15 - plan ms hse 014 eni Ghana r01 - MMST PPP_Final.pdf
17 - plan ms hse 019 eni Ghana r01 - BMP_Final.pdf
18 - plan ms hse 019 eni Ghana r01 - App A Avian BAP_Final.pdf
19 - plan ms hse 019 eni Ghana r01 - App B Sea Turtles BAP_Final.pdf