PROJECT

Projects

Environmental & Social Review Summary

Project Number

36080

Company Name

IZMIR SU VE KANALIZASYON IDARESI GENEL MUDURLUGU

Date ESRS Disclosed

May 14, 2015

Country

Turkiye

Region

Central Asia and Turkiye

Last Updated Date

Dec 1, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Jun 15, 2015
Signed : Jun 26, 2015
Invested : Dec 9, 2015

Sector

Water and Wastewater Utilities

Industry

Infrastructure

Department

Regional Industry - INF ECA

Project Description

The proposed investment includes a loan to Izmir Metropolitan Municipality’s (IMM’s) Water and Sewerage Administration (“Izsu” or the “Company”), for the installation of a [90] km sewerage network which will include 5 pumping/transfer stations and a new wastewater treatment plant (WWTP) with a treatment capacity of 10.000 m3/day to be built by Izsu in Yeni Foca, a coastal town in Turkey’s Izmir Province (the “Project”). The proposed loan is a follow on investment to Izsu Wastewater Project (#32078), whereby IFC supported the expansion of the Cigli Waste Water Treatment Plant (“WWTP”) serving the central districts of Izmir. Izsu Wastewater was committed in April 2013 and has been partially disbursed.

Currently, the inhabitants of Yeni Foca (up to 40,000 people during summer months) have access to septic tanks that are periodically emptied. Wastewater is transferred to a location out of town and is discharged without treatment. With the project, septic tanks are expected to be replaced with municipal sewerage service and transported to the new waste water treatment facility, benefiting from improved sanitation services and reducing the environmental and health related risks.

For the installation of the sewerage network, Izsu signed a contract with Usev Contracting and Bulas Contracting on October 22nd, 2014, following a competitive bidding process as per Turkish Public Procurement Law. Installation of the sewerage network is expected to take 30 months, with an expected completion date of April 2017. The tender for the new waste water treatment facility is expected to be announced within March 2015 and is expected to be operational in mid-2016.

Storm water and sewerage will be collected separately. No industrial waste water will be connected to the sewerage system and hotels, gas stations, car washing sites and / or restaurant can be connected to the sewerage system only if the effluent waste water quality meets the water quality acceptance criteria of Yeni Foca WWTP. Yeni Foca WWTP is expected to have sufficient capacity until 2019 and will be expanded if needed in future. The storm water collection system and potential expansion of the WWTP is out of the scope of this project.

IFC has 3 existing investments with the IMM related with traffic management and emergency response systems (category C, project number 31733), Izmir Tramway (category B, project number 34306) and with its water utility, Izsu, for the expansion of the Cigli wastewater treatment plant (category B, project number 32078). Another project, Izmir Railcars (category B, project number 35012), for the purchase of electrical light railcars, is pending approval. The Environmental and Social Review Summaries (ESRS) for project 32078, 34406 and 35012 can be reviewed from the following links.

Izmir Tramway : ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/78e3b305216fcdba85257a8b0075079d/e9d771b7c963b5b485257c630052df2a?opendocument
Izsu : ifcextapps.ifc.org/ifcext/spiwebsite.nsf/78e3b305216fcdba85257a8b0075079d/c9b4ff465688d2a685257b3900600dba?opendocument
Izmir Railcars: ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/78e3b305216fcdba85257a8b0075079d/c893bd15f1ed893f85257d86005bf7a2?opendocument

Overview of IFC's Scope of Review

The scope of this project review included assessment of IMM’s and Izsu’s environmental, health and safety and social (EHSS) management capacity and performance. The review relied on documents and reports made available by IMM and Izsu and observation and interviews by IFC staff during site visits to their head offices in Izmir-Turkey and the project location at Yeni Foca-Izmir-Turkey in January 2015.

IFC’s appraisal considered environmental and social management plans for the project and gaps if any between these plans and IFC requirements. Where necessary, corrective measures, intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the Environmental and Social Action Plan (ESAP) disclosed with this review summary document. Through the implementation of the management plans and the ESAP the Project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan