PROJECT

Projects

Environmental & Social Review Summary

Project Number

35983

Company Name

ARLA FOODS INGREDIENTS S.A.

Date ESRS Disclosed

Mar 20, 2015

Country

Argentina

Region

Latin America and the Caribbean

Last Updated Date

Sep 21, 2022

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : May 21, 2015
Signed : Jun 26, 2015
Invested : Sep 10, 2015

Sector

Dairy Products

Industry

Agribusiness and Forestry

Department

Regional Industry MAS LAC & EUR

Project Description

The proposed investment is for a long term IFC A loan and B loan for an aggregated amount of US$56 mn to AFISA, to support the expansion of the Company’s whey intake from 900,000 to 1,200,000 MT per year and permeate drying capacity from 24,000 to 45,000 MT per year. The project calls for the construction of a new permeate tower to allow AFISA to increase permeate drying capacity and at the same time, switching the existing permeate drying tower to processing whey protein concentrates (WPC). AFISA, founded in 2000 as a JV between Arla Foods Ingredients (Denmark) and SanCor (Argentina), is a premier and leading processor of whey, a by-product of cheese production. AFISA is primarily operated by AFI, with SanCor functioning principally as a supplier of raw materials. AFISA controls the management, the commercial, processing and strategic direction, while SanCor provides the JV with the whey. Environmental and social sustainability standards are promoted by this project as whey is typically disposed of through land application or used as animal feed. By increasing the economic valued of whey, a milk derivative previously considered to be waste, processors such as AFISA help reduce the waste stream. The Company possesses first-rate technological capabilities, as well as a solid track record and full commitment to E&S standards. AFISA’s processing facility is located in Porteña (Córdoba, Argentina). In this plant, the whey is filtered, dried and converted into whey protein concentrates functional milk proteins (FMP) and permeate powders. These products are used for functional nutrition, to replace lactose and milk powder in foods including infant formulas and it is also used as animal feed.

Overview of IFC's Scope of Review

The scope of the review of AFISA included assessment of the management capacity to provide adequate oversight of environmental, social, health and safety risks and impacts in relation to IFC Performance Standards, regulatory requirements and relevant aspects of applicable Environmental Health and Safety guidelines. The environmental and social due diligence consisted of the following: (i) a visit to AFISA’s main office in Buenos Aires to meet and discuss the project with AFISA’s management team; and (ii) a visit to the plant in Porteña, Córdoba. This visit included interviews with key management and operational staff, and a tour of the facilities including the whey reception control rooms, warehouse storage rooms, operating rooms, processing rooms, main administrative office, and waste water treatment plant. During the plant visit the following staff was interviewed: whey procurement manager, environmental manager, quality assurance manager, occupational, health and safety manager, laboratory operators, coordinator for human resources capacity building, warehouse and packing room personnel. Lastly, the whey supplying plants (at SanCor, plus two other companies) were visited. This visit included interviews with the plant managers to discuss AFISA’s processing requirements and working relationship, environmental and quality requirements, visit to the whey processing facility and general discussions about their requirements to primary producers.

In addition to the meetings and plant inspections, the due diligence also consisted of document and report reviews made available by AFISA. These included audits for waste water plants, raw water wells, air emissions, occupational, health and safety training reports, occupational, health and safety statistics, permits and certifications, supply chain code of conduct, and certificates of waste processors involved in landfarming.

IFC’s appraisal considered environmental and social management plans for the Project and gaps if any between these plans and IFC requirements. Where necessary, corrective measures, intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through implementation of these management plans and the ESAP the Project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan