PROJECT

Projects

Environmental & Social Review Summary

Project Number

35853

Company Name

SEGOU SOLAIRE SA

Date ESRS Disclosed

Sep 23, 2016

Country

Mali

Region

Africa

Last Updated Date

Oct 23, 2022

Environmental Category

B - Limited

Status

Hold

Previous Events

Approved : May 17, 2017

Sector

Solar - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry - INF ME & Africa

Project Description

The proposed investment is an IFC financing package to Ségou Solaire of (i) an IFC A loan of up to EUR [8.2] million, (ii) an IFC equity investment of EUR [2.5 to 4.1] million for an equity stake of [20 to 32.5]% in the project company, and (iii) mobilization of parallel loans of up to EUR [31] million, to finance a 33 MW solar power plant in Segou, Mali (the “Project”). The estimated total project cost is EUR [50.2] million.  The Project consists in the construction of a greenfield 33MW solar photovoltaic plant in Segou, located 236 km North-East of Bamako. The planned solar power plant is located on land already allocated to the sponsor by the Energy Ministry (Ségou Land Certificate no 8111), at Pélengana Were, in the commune of Pélengana in the Ségou vicinity. The power plant site can be accessed via the paved RN6 Bamako-Ségou-Pélengana road. The project is the result of a partnership between Scatec Solar (main sponsor), IFC InfraVentures and Africa Power 1. The project will be arranged by IFC and co-financed by IFC, the African Development Bank and the Climate Investment Fund.

 The solar power plant will contain approximately 104,764 solar panels on steel piles and around 10 uninterrupted power supply transformer containers on a single plot of land with a surface area of 87 hectares, 50 of which will be used for the 33 MW project. The photovoltaic power plant itself will occupy 47 ha.  The rest will constitute a logistics area of around 2.6 ha. The access road will be built to a length of 1.9 km, and an underground transmission line will extend for 2.8 km. At the time of the site visit, construction had not yet started. The construction phase is expected to take about eight months. The site is located in modified habitat with no significant biodiversity value, and land use is mostly agricultural. The road accessing the site crosses the following communities: Pélengana Were and Bougouni (about 9,300 people in total). Scatec Solar will not provide accommodations for workers as they will lodge in the surrounding communities.

Overview of IFC's Scope of Review

IFC’s review included a visit to the project site in Pélengana Were from 22-25 March 2016. Meetings were held with the main stakeholders: local communities of Pélengana Were and Bougouni including village chiefs, farmers, herdsmen, youth association, women’s group, and affected communities; representatives of the Ministry of Environment and the Ministry of Energy; the President of Africa Power; and representatives of the consultant responsible to draft the Environmental and Social Impact Assessment (ESIA) and the Abridged Resettlement Action Plan (ARAP). IFC reviewed the following documentation: ESIA, ARAP, and the public consultations report drafted by the Ministry of Environment. 

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
1529254_Rapport PAR Final_v5.0 WB_2016-11-10 Annexes.pdf
1529254-SCATEC-Rapport ESIA-V7_Final.pdf
1529254_Rapport PAR Final_v5.0 WB_2016-11-10 rapport.pdf