PROJECT

Projects

Environmental & Social Review Summary

Project Number

35288

Company Name

SPHINX GLASS SAE

Date ESRS Disclosed

Apr 1, 2015

Country

Egypt, Arab Republic of

Region

Africa

Last Updated Date

Aug 14, 2025

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 16, 2015
Signed : Sep 30, 2015
Invested : Nov 24, 2015

Sector

Glass and Glass Products (Including Glass and Mineral Wool)

Industry

Manufacturing

Department

Regional Industry - MAS Africa

Project Description

The Project consists of a 20% equity stake in Egypt-based float glass manufacturer Sphinx Glass S.A.E. (“Sphinx” or “the company”) which is currently 100% owned by Construction Products Holding Company (CPC).

The Sphinx manufacturing facility was designed and completed in 2010 with technological cooperation from US-based Pittsburgh Plate Glass (PPG) and the facility currently has a capacity to melt 600 tons of product per day (about 200,000 tons per year) and is located on a 220,000 square meter plot of land in an industrial zone of Sadat City, Menofeya governorate, Egypt. The production line is currently operating at maximum capacity.

Sphinx produces mainly clear glass with different widths ranging from 2 mm to 19 mm. In addition, it produces limited quantities of tinted and coated glass. The company plans to introduce a second production line of 200,000 tons per year capacity which would enable it to dedicate one of its production units exclusively to the production of clear float glass. This will allow maximum efficiency in one production line, due to minimal changeovers, while allowing the other line to produce a more optimal mix of higher value added glass for the automotive, household appliances and construction (coated glass) sectors.

The production process consists of charging the raw materials required to make clear or colored glass through weighing, mixing and conveying to the furnace which produces molten glass. The molten glass then passes into a bath of molten tin where the temperature is gradually reduced and the glass sheets can be pulled off the bath by rollers. Variation in the flow speed and roller speed enables glass sheets of varying thickness to be formed. This is followed by annealing, cutting and loading.

Overview of IFC's Scope of Review

IFC’s appraisal of this project included a site visit to the Sphinx facility in Sadat Industrial city. The visit was undertaken in order to review environmental and social policies, management systems, related procedures, including that related to Occupational Health and Safety (OHS).

Meetings were held with the Chief Executive Officer (CEO), Health, Safety and Environment (HSE) Section Head, Plant Manager, Human Resources and Administration Senior Manager, Chief Financial Officer, Section Head of Local Procurement and the Commercial Manager. Meetings were also attended with the CPC Africa CEO and CPC Vice President Strategic Acquisitions.

Documentation reviewed during the appraisal included an Environmental Impact Assessment undertaken for the facility, Sphinx’s draft HSE policy, environmental measurements and analysis carried out in February 2013 for monitoring Sphinx performance, Human Resources (HR) policies and procedures, the emergency plan, HSE monthly reports that are submitted to the environmental committee, and the hazardous waste disposal contract.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan