PROJECT

Projects

Environmental & Social Review Summary

Project Number

35080

Company Name

Compania Hondurena de Energia Solar SA de CV

Date ESRS Disclosed

Sep 24, 2014

Country

Honduras

Region

Latin America and the Caribbean

Last Updated Date

Jan 22, 2026

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jan 9, 2015
Signed : May 13, 2015
Invested : Feb 12, 2016

Sector

Solar - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

The project entails the development of a photovoltaic solar plant with capacity of 70 MWp by COHESSA. The project began construction in August 2014. It will be sited in the Valle department, 111 km south of the capital city of Tegucigalpa. The project is expected to generate approximately 122 GWh per annum. The project will be located over an area of 212 hectares of modified habitat and agricultural pasture land. It will be connected through a substation to the national grid, which crosses the project from east to west, near the main entrance of the property.

The equipment for the project will consist of proven ground-mounted photovoltaic crystalline modules, and inverters from ABB (ABB PVS800-57-1000kW-C), or equivalent. Construction is expected to be completed by June 2015.

Overview of IFC's Scope of Review

IFC reviewed Compañía Hondureña de Energía Solar, S.A. de C.V. (“COHESSA” or the “Company”) Environmental, Social and Health and Safety (ESHS) capabilities and its ability to construct and operate the solar PV project they are developing in accordance with the Honduran regulatory requirements and IFC’s Performance Standards. Specific items reviewed included, but were not limited to, the Environmental Impact Assessment (EIA), environmental licenses, operating contracts and other supporting documents, as well as the Company’s corporate ESHS policies and procedures. IFC conducted a visit to the proposed project site in July 2014, and interviewed the project’s management team and site personnel. IFC has another project with the same sponsor, an operational 38.5MW hydroelectric project called La Vegona (Honduras, disclosed November 11th, 2010) and based on IFC standard portfolio supervision activities, the project has been ranked satisfactory in its environmental and social performance.
IFC’s appraisal considered environmental and social management plans for the project, and gaps between these plans vis-à-vis IFC requirements. Corrective measures to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed together with this review summary. Through implementation of these management plans and the ESAP, the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
Valle EIA.pdf
Anexo No. 9b (Plano Detalle de estructura).pdf
Anexo No. 9a (Plano Detalle de estructura).pdf
Anexo No. 8 (Plano Implantación de los módulos).pdf
Anexo No. 7b (Plano Edificio de control de acceso).pdf
Anexo No. 7a (Plano Layout General).pdf
Anexo No. 6 (Plano Topográfico).pdf
Anexo No. 5d (Plano Cimentación).pdf
Anexo No. 5c (Plano Cimentación).pdf
Anexo No. 5b (Plano de Cimentación).pdf
Anexo No. 5a (Plano Cimentación).pdf
Anexo No. 4 (Plano Instalaciones provisionales).pdf
Anexo No. 3 (Mapa Formaciones Geologicas).pdf
Anexo No. 25 (Declaraciones Juradas Consultores).pdf
Anexo No. 24 (Dictamen IHAH).pdf
Anexo No. 23 (Listado de Asistencia Cabildo Abierto).pdf
Anexo No. 22 (Certificación Alcaldia Municipal).pdf
Anexo No. 21g (Anuncio Peridico Finalización EIA La Tribuna Tiempo.pdf
Anexo No. 21f (Anuncio Peridico Finalización EIA Diario Tiempo.pdf
Anexo No. 21e (Constancia Anuncio Finalización EIA Radio Nacional.pdf
Anexo No. 21d (Constancia Anuncio Finalización EIA Radio Local.pdf
Anexo No. 21c (Anuncio Periodico Inicio EIA Peridico.pdf
Anexo No. 21b (Constancia Anuncio Inicio EIA Radio Nacional.pdf
Anexo No. 21a (Constancia Anuncio Inicio EIA Radio Local.pdf
Anexo No. 20 (Matriz MIIA).pdf
Anexo No. 2 (Plano de Areas).pdf
Anexo No. 1b (Mapa de Ubicacion).pdf
Anexo No. 1a (Plano de Ubicación).pdf
Anexo No. 19 (Mapa areas protegidas).pdf
Anexo No. 18 (Mapa uso de suelo).pdf
Anexo No. 17 (Mapa Tipos de suelo).pdf
Anexo No. 16 (Mapa Formaciones Hidrogeologicas).pdf
Anexo No. 15 (Plano Arquitectura de monitorización).pdf
Anexo No. 14 (Ficha Tecnica del Inversor).pdf
Anexo No. 13 (Ficha tecnica modulo fotovoltaico).pdf
Anexo No. 12 (Cronograma de Construcción).pdf
Anexo No. 11b (Plano Edificio de inversores y transdormador).pdf
Anexo No. 11a (Plano Edificio de inversores y transdormador).pdf
Anexo No. 10b (Plano Unifilar).pdf
Anexo No. 10a (Plano Unifilar).pdf