PROJECT

Projects

Environmental & Social Review Summary

Project Number

34975

Company Name

Participaciones Choluteca Dos, S.A.

Date ESRS Disclosed

Aug 15, 2014

Country

Honduras

Region

Latin America and the Caribbean

Last Updated Date

Mar 10, 2022

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Sep 30, 2014
Signed : Dec 4, 2014
Invested : Dec 19, 2014

Sector

Solar - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

The project entails the development of three solar photovoltaic (PV) power plants with aggregate capacity of 78.6 MW in Choluteca municipality, which is located in the southernmost part of Honduras, some 40 km inland from the Pacific Ocean. Construction of the Pacifico I and Choluteca I and II plants is expected to begin in late Q32014 and all have very similar technical characteristics. Pacifico I will have a nominal installed capacity of 23 MWp and is expected to generate 52 GWh per annum. The project will be located on 120 ha of agricultural pasture land in an area with strong irradiation equivalent to 6.0-6.5 kWh/m2/day. The Choluteca I and II projects are very similar to Pacifico I and are located next to each other within 151 ha of modified habitat, also composed of pastures and agricultural land. With an aggregate installed capacity of 58 MWp, these plants are expected to generate 112 GWh per annum. The three projects are located within 5 km of one another and will be interconnected to Santa Lucia - an existing substation located in the outskirts of San Jose de la Landa – via two dedicated 34.5 kV single pole transmission lines. Pacifico I’s transmission line will be 4 kilometers long with right-of-way (RoW) of 15 meters, and Choluteca I and II will share a 7-kilometer transmission line with the same RoW width. Given the peri-urban siting of the Santa Lucia substation, the last 500 meters of the two transmission lines will be buried.
The equipment will consist of proven ground mounted photovoltaic crystalline modules and single-axis trackers from SunEdison, and inverters from Bonfiglioli/Ingeteam/SMA or equivalent. Construction is expected to be completed by Q1 2015.

Overview of IFC's Scope of Review

IFC reviewed SunEdison’s (the “company”) Environmental, Social, Health and Safety (ESHS) capabilities and its ability to construct and operate the Pacifico I and Choluteca I and II projects in accordance with Honduran regulatory requirements and IFC’s Performance Standards. Specific items reviewed included, but were not limited to, the Environmental and Social Impact Assessments (ESIAs), environmental licenses, operating contracts and other supporting documents for the three projects, as well as SunEdison’s corporate ESHS policies and procedures. IFC conducted a visit to the proposed project site in July 2014, and interviewed the project management team including corporate ESHS staff.
IFC has several other projects with the same sponsor: SunEdison CAP and Merchant (Chile; disclosed May 20, 2013 and May 17, 2013, respectively), SEI Solar Power Pvt. Ltd (India, disclosed November 16, 2012), Karadzhalovo (Bulgaria disclosed January 20th, 2012), and a corporate loan to SunEdison (global, disclosed May 23rd, 2011). Based on IFC standard portfolio supervision activities, all of these projects have been ranked satisfactory or above in their environmental and social performance.
IFC’s appraisal considered environmental and social management plans for the project, and gaps between these plans vis-à-vis IFC requirements. Corrective measures to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed together with this review summary. Through implementation of these management plans and the ESAP, the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
4. Choluteca II ESIA.pdf
3. Choluteca I ESIA .pdf
2. Pacifico I Environmental License and Operations Contract.pdf
1. Pacifico I ESIA .pdf