PROJECT

Projects

Environmental & Social Review Summary

Project Number

34652

Company Name

MAS CAPITAL (PRIVATE) LIMITED

Date ESRS Disclosed

Apr 17, 2014

Country

Sri Lanka

Region

South Asia

Last Updated Date

Jun 12, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 2, 2014
Signed : Jun 20, 2014
Invested : Jun 27, 2014

Sector

Garment and Apparel (With Primary Textile Operations, Excluding Footwear)

Industry

Manufacturing

Department

Regional Industry - MAS Asia & Pac

Project Description

MAS Capital (Pvt) Ltd. (“MAS”, “the group” or “company”) is a vertically integrated intimate-wear and active-wear manufacturing group operating out of Sri Lanka. The company also has operations outside Sri Lanka, but these are not included within the scope of the proposed IFC investment. The group’s operations span the entire value chain of the manufacturing process from fabric, elastic, lace and accessories to the final product. IFC is considering an investment for capacity expansions, sustainability projects and product development in the group (MAS), which includes at MAS Capital (Pvt) Ltd, MAS Active (Pvt) Ltd, Trischel (Pvt) Ltd and Textprint Lanka (Pvt) Ltd (collectively the “Co-borrowers”) and their subsidiaries. (“the project”) which are all a part of the MAS group. The project will be carried out in MAS’s existing plants in Sri Lanka located in the Western and North Western Provinces. The project cost is estimated at $35 million and the proposed IFC investment is up to $27 million, A-loan to the co-borrowers to be used solely for projects in Sri Lanka.

Overview of IFC's Scope of Review

The scope of review of MAS'' potential to comply with IFC’s Performance Standards included assessment of the management capacity to provide adequate oversight of environmental, social, health and safety performance in relation to IFC Performance Standards, regulatory requirements and relevant aspects of the applicable World Bank Group Environmental Health and Safety Guidelines. The review relied on documents and reports made available by the company, IFC’s technical expert’s assessment and interviews conducted by IFC staff during their site visits in November 2103 and March 2014 to a number of facilities owned and operated by MAS in Sri Lanka. IFC conducted interviews with key management personnel, operational and human resources staff.

IFC’s appraisal considered environmental and social management plans for the project and gaps if any between these plans and IFC requirements. Corrective measures, intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through implementation of these management plans and the ESAP the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Client Documentation

File Name Actions
34652 ESAP Action_Plan_Sheet.xls.pdf