PROJECT

Projects

Environmental & Social Review Summary

Project Number

34623

Company Name

NYUMBA YA AKIBA SA

Date ESRS Disclosed

Mar 21, 2014

Country

Congo, Democratic Republic of

Region

Africa

Last Updated Date

Feb 11, 2023

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Jun 5, 2014
Signed : Nov 27, 2014
Invested : Aug 28, 2015

Sector

Cement

Industry

Manufacturing

Department

Regional Industry - MAS Africa

Project Description

Nyumba Ya Akiba SARL (“NYA”, or the “company”), is a 50:50 joint venture between Lucky Cement Limited (LCL) of Pakistan and Groupe Rawji of the Democratic Republic of Congo – DRC - (together, the “Sponsors”). The company is headquartered in Kinshasa. Groupe Rawji is a DRC based multinational company with interests in logistics, banking (Rawbank – an existing IFC client), manufacturing, trading, real-estate development and port operations. Outside of DRC the Group also has operations in Angola, Belgium, China, Dubai, Germany, India, Nigeria, and South Africa. LCL is Pakistan’s largest producer of cement with a production capacity of 7.75 million tons per annum (tpa). LCL currently has two operational plants in Pakistan and employs over 2,200 employees. LCL is also currently developing an 871 000 tpa cement grinding facility in Basra, Iraq.

LCL, through the NYA joint venture, plans to develop a greenfield cement project in the Songologo Region of the Bas-Congo Province of DRC, approximately 250 km south-west of Kinshasa, the capital city of the DRC. The N1 (the main Kinshasa-Matadi port highway) passes around 2 km from the project site, while the main Kinshasa – Matadi national railway line passes through the project site, south of the plant site.

The key components of the cement project include: a cement plant (with a production capacity of 1.18 million tpa ); limestone quarry (to be exploited using opencast mining); overburden storage facility; 220 kV powerline (6 km in length) to an existing substation; employee accommodation camps (for approx. 290 personnel – 600 during the construction phase); waste management facility; access and haul roads; and auxiliary facilities (water management infrastructure, package sewage treatment plant, explosives stores etc.). Limestone, clay and laterite will be mined, crushed and mixed with sand in the clinker production process, which will then be milled at an on-site grinding plant with limestone and (imported) gypsum to produce cement. The expected life of the mine is at least 40 years. Ground cement will be stored in two concrete silos with a capacity
15 000 tons each. The plant will have the capacity to bulk-load cement for commercial clients as well as to package and load cement in bags for sale in local retail markets. The project will rely on the N1 highway to transport raw materials and finished product. In addition to this, NYA plans to enter into a contract with the relevant authority for use of the railways for the transportation of imported coal from Matadi Port, some 100 km west of the project site.

IFC defined installation of the 6.6 km 220 kV powerline by the public utility company (Société Nationale d''Electricité, sarl - SNEL) as an Associated Facility in accordance with IFC’s Performance Standards and did not identify any critical elements. However, this will be further addressed during supplemental ESIA work which is further discussed in subsequent sections of this document.

NYA holds a lease of 28.56 km2 under an exploration permit and the total footprint of the project will be approximately 150 ha. Land concession rights have been issued for occupation of the land and construction is planned to commence in the third quarter of 2014, and continue until 4th quarter of 2016 when production is expected to start.

The area in which the project will be located is largely degraded and is considered a modified habitat. It is rural in nature and characterized by a lack of development or infrastructure. Approximately 10 000 people are estimated to live in the broader vicinity of the proposed project, while small settlements in the area include Yuku, Kokolo, Nkonda, Mbemba, Kinsua, Mbamba and Minkelo.

NYA is hiring reputable Engineering, Procurement and Construction Management (EPCM) contractors to build the cement plant, with a projected timeline of 27 months for construction.

The IFC proposed investment is a loan facility to partially finance the NYA Project.

Overview of IFC's Scope of Review

IFC’s Environmental and Social Due Diligence (ESDD) of this project included meetings with company officials in Kinshasa, including the company’s Chief Executive Officer, Environmental Manager and the Chief Financial Officer. It also included a visit to the project site, including the area for the limestone quarry; the cement processing plant; the exploration camp and site offices; and the construction camp. The team also visited the town of Minkelo and the villages of Yuku, Mbamba and Mbembe. IFC also had meetings with SRK Consulting (SRK), the consultants that compiled the Environmental and Social Impact Assessment (ESIA) for the project and are being commissioned to undertake further environmental and social studies and develop appropriate management plans.

In addition to the above, a review of the following documents was undertaken: LCL’s Sustainability Report for the period 01 July 2011 to 30 June 2012 and the Quality, Health, Safety and Environment (QHSE) policy; Nyumba Ya Akiba Cement Plant Updated ESIA (including Management Plans), SRK Consulting, August 2013; Nyumba Ya Akiba Framework Resettlement Action Plan, SRK Consulting, August 2013; NYA: Outstanding Studies Timeline; Qualite des Eaux et Debits des Rivieres Sanzikua et Yuku, a Kimpese, Bas-Congo, G.G.E.A, University of Kinshasa; Soil Site Investigation Report 2012/52 Yuku-Minkelo (Kimpese – Songololo Region), University of Kinshasa –Civil Engineering Laboratory.

IFC’s appraisal considered environmental and social management plans for the Project and gaps if any between these plans and IFC requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and (if applicable) in the agreed Environmental and Social Action Plan (ESAP). Through implementation of these management plans and the ESAP the Project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
PS1_34623.doc
PS2_34623.doc
PS3_34623.doc
PS4_34623.doc
PS5_34623.doc
Appendix - 9.4.pdf
463574_Updated ESIA for NYA Cement Project_August 2013_Final.pdf
Appendix - 9.1, Moderator's Guidelines.pdf
Appendix - 9.2, Performa for written views of the stakeholders.pdf
Appendix - 9.3, Performa was Translated into French.pdf
Appendix 3.6, MOU with SNEL.pdf
Appendix 1.1, Project Sponsors Profile.pdf
Appendix 1.2, Brief Introduction of the Experts.pdf
Appendix 3.1, Mining Ministry's Letters.pdf
Appendix 3.2, Analysis of Soil Core Samples.pdf
Appendix 3.3, Process Flow Diagram.pdf
Appendix 3.4, FLS Noise Engineering Methods.pdf
Appendix 3.5, Mass Flow Diagram.pdf
Appendix 8.5 social survey map.pdf
Appendix 6 2 GHG Assessment (SRK revised) .pdf
Appendix 7.1_ Botanical species list.pdf
Appendix 7.2_ Habitats map.pdf
Appendix 7.3_On site water quality measurements.pdf
Appendix 8.1_Attendance registers.pdf
Appendix 8.2_household questionnaire.pdf
Appendix 8.4_survey schedule.pdf
Appendix 9.10 _Comments sheets 8.pdf
Appendix 9.5 Letter of notification (French).pdf
Appendix 9.6 _Household survey questionnaire_June 2013_English.pdf
Appendix 9.8 NYA notification letter for draft ESIA NTS_ English .pdf
Appendix 9.9 NYA Comment Form for draft ESIA NTS_English.pdf
Appendix 9.9 NYA Comment Form for draft ESIA NTS_FR -revised.pdf
Appendix 9.10 _Comments sheets 1.pdf
Appendix 9.10 _Comments sheets 2.pdf
Appendix 9.10 _Comments sheets 3.pdf
Appendix 9.10 _Comments sheets 4.pdf
Appendix 9.10 _Comments sheets 5.pdf
Appendix 9.10 _Comments sheets 6.pdf
Appendix 9.10 _Comments sheets 7.pdf
Nyumba Ya Akiba Non-Technical Summary_12_07_2013 Kikongo DLS.pdf
Appendix 11_Labour and HR Plan_August 2013_Final.pdf
Appendix 12_OHS Plan_August 2013_Final.pdf
Appendix 13_CHSP_August 2013_Final.pdf
Appendix 14 GHG Emission_Final.pdf
Appendix 15_Waste Man Plan_August 2013.pdf
Appendix 16_EPRP_ August 2013.pdf
Appendix 17_SEP_August 2013_Final.pdf
Appendix 18_ FRAP_ Final _August 2013.pdf
Appendix 20 Draft of MOU with the Villagers_GB.pdf
NYA Executive Summary _English_Final.1.pdf
NYA Executive Summary_French_Final_1.pdf
NYA FRAP Executive Summary English.pdf
NYA FRAP Executive Summary French.pdf
Nyumba Ya Akiba Non-Technical Summary Lingala Final.pdf