PROJECT

Projects

Environmental & Social Review Summary

Project Number

34405

Company Name

Parque Fotovoltaico Luz del Norte SpA

Date ESRS Disclosed

May 13, 2014

Country

Chile

Region

Latin America and the Caribbean

Last Updated Date

May 25, 2023

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Jun 13, 2014
Signed : Aug 22, 2014
Invested : Sep 24, 2014

Sector

Solar - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

The project under consideration will install a photovoltaic (PV) solar plant to generate 141.04 MW AC of solar energy to be supplied to the Chilean Central Interconnected System (SIC). The project is located in the Atacama Desert, considered one of the driest and sunniest places in the world, in the Llano de Varas, Province of Copiapó, approximately 60 kilometers to the Northeast of the city of Copiapó. It is placed on a fenced 456 ha property of the Chilean government leased to First Solar for the project. The closest settlement, the town of Carrera Pinto, is located 7.8 km away from the project. The closest indigenous community, out of the six indigenous communities in the district of Copiapó, is located 19 km distant from the project. There was presence of cultural heritage within the project site including some areas of secondary archeological interest were near the transmission line route. The landscape in the region is typical of deserts and arid areas, with no nearby inhabitants or proximity to either critical or preserved habitats.

The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid system. As part of the project, the Company will also (a) open a 0.5 km access road, (b) add an interconnection panel to the existing 220 kV Carrera Pinto substation, and (c) install a 2 km (220 kV) transmission line, with a right-of-way (ROW) of 40 m.

Overview of IFC's Scope of Review

IFC’s appraisal reviewed First Solar (the “Company”)’s Environmental, Health and Safety (EHS), and Social capabilities and its ability to construct and operate the Luz del Norte project in accordance with the Chilean regulatory requirements and IFC’s Performance Standards. IFC reviewed the Environmental Assessment document prepared for the project, conducted a visit to the proposed project site, and conducted interviews with the local environmental authorities, and Company’s project management team including EHS staff in February 2014.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan