PROJECT

Projects

Environmental & Social Review Summary

Project Number

34376

Company Name

AL SAFI DANONE IRAQ

Date ESRS Disclosed

Jun 16, 2014

Country

Iraq

Region

Middle East

Last Updated Date

Feb 5, 2022

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Nov 13, 2014
Signed : Apr 19, 2015
Invested : Jul 21, 2015

Sector

Dairy Products

Industry

Agribusiness and Forestry

Department

Regional Industry MAS MCT

Project Description

Al Safi Danone for Dairy Production and Distribution LLC (the “Company” or “ASDI”) is an establishment that was formed in 2012 for the production, marketing and sales of processed dairy products in Iraq. In 2014, the Company constructed a new dairy processing and bottling plant near Erbil, located within the semi-autonomous Kurdistan Regional Government (KRG) in northern Iraq. The shareholders have already completed the full equity contribution amount of US$36 million into ASDI that was used to construct the facility and to install two of the three envisaged production lines with circa 43k tpa capacity to date. The Company started commercial production April 20, 2014. IFC’s loan proceeds will be used to purchase and install the 3rd production line to produce Big Pot Yogurts which will be tentatively commissioned in September 2014, and to pay for the remaining ancillary Capex items.

The Project will be funded by a combination of the Sponsors’ equity and IFC long-term financing. The main purpose of the Project is to partially replace the importation of processed dairy products from the Kingdom of Saudi Arabia (“KSA”) to Iraq through the Company’s local production. The proposed IFC investment is an US$18 million A Loan that will be structured as a Sharia-compliant sale-and-lease-back product, “Ijara”.

Overview of IFC's Scope of Review

IFC’s review consisted of meeting in Al Safi Danone’s Headquarters in Erbil, Iraq (KRG- Kurdistan Regional Government) and site visit of the dairy plant in Perdi, 40 km from Erbily during the week of March 23rd, 2014. During the visit, the plant was at commissioning stage. Interviews were held with the Company representatives, including general manager, human resources (HR) manager, chief financial officer, plant manager, chief engineer, performance and safety Engineer, quality and food safety manager and the utilities engineer.

The following key documents were reviewed during the appraisal: Operation Permit (No. 3513 issued 29/04/2013; Company registration license issued 29/04/2012; Human Resources, Quality, Environment and OHS policies, Quality Management System Manual, Procedures and HACCP (Hazard Analyzes and Critical Control Points Plan); Organization chart and documented job descriptions; employee contracts and job descriptions; OHS Procedures LOTO (Log Out Tag Out), Workplace Risk Assessment, MSDS (Material Safety Data Sheets); Training documents; Pest Management Plan; Waste Water Treatment Plant Design documents and technical specifications, and the hydrogeological study for water supply.

IFC’s appraisal considered environmental and social management plans for the Project and gaps, if any between these plans and IFC requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through implementation of these management plans and the ESAP, the Project is expected to be designed and operated in accordance with IFC’s Performance Standards (PSs) objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan