Environmental & Social Review Summary

Project Number

34358

Company Name

ADN PPP SAGLIK YATIRIM ANONIM SIRKETI

Date ESRS Disclosed

Jun 24, 2014

Country

Turkiye

Region

Central Asia and Turkiye

Last Updated Date

Dec 1, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Sep 18, 2014
Signed : Dec 19, 2014
Invested : Mar 31, 2015

Sector

Hospitals and Clinics

Industry

Health, Education and Life Sciences

Department

Gbl Ind, Manufact, Agribus & Services

Project Description

The Turkish Ministry of Health (“MoH”) developed a substantial healthcare Public Private Partnership (PPP) Program in order to renovate the healthcare infrastructure that is unable to meet the increasing healthcare demands, consolidate small state-owned hospitals into larger campuses, and increase service quality and efficiency of state-owned hospitals. The Adana Integrated Health Campus (“the project”) is a mid-size project within the program located in Adana, a second tier city in Southern Turkey with a population of 4.5 million including the metropolitan area. The project site (328,820 m2) belongs to the Treasury and has already been allocated to MoH. The campus will have a 1,550-bed capacity, composed of 6 hospitals: a 584-bed general hospital, a 185-bed cardiology hospital, a 182-bed oncology hospital, a 349-bed women’s and children’s hospital, a 150-bed physical medicine and rehabilitation hospital, and a 100-bed forensic psychiatric hospital. The health campus will be developed on a greenfield located on the outskirts of Adana, and will add new bed capacity and replace some of the existing inefficient and dated state owned hospitals scattered around the city.

In addition to hospital buildings, a commercial area consisting of health support facilities such as pharmacies, doctors’ offices, ophthalmic hospital and day chemotherapy; a technical unit building to house a tri-generation system in the ground floor with an estimated capacity of 8.6 MW; a helipad located on top of the tower will be constructed; a 154 kV energy transmission line which is currently nonoperational will be relocated and a 400 m road that passes through the project site will be removed within the scope of the project.

The project sponsors are a consortium comprised of Ronesans Holding A.S, Ronesans Saglik Yatirim A.S., Meridiam Eastern Europe S.a.r.l, TTT Saglik Hizmetleri Egitim Insaat Sanayi Ticaret A.S., Sam Yapi Sanayi ve Ticaret Ltd. Sti., Sila Danışmanlık Saglik Bilisim İnşaat Ticaret A.S., which combines construction and development experience, with medical knowledge, concessions and health PPP expertise. The borrower is a new project company to be established and called ADN PPP Saglik Yatirim A.S. The proposed IFC investment entails an IFC A Loan of EUR 35 million, a MCPP Loan (Managed co-lending portfolio program) of EUR 26.25 million, an Interest Rate Swap and mobilization from B/Parallel lenders to participate in the EUR 467 million greenfield project financing of the Adana IHC.

The construction period is 3 years, to be followed by a 25 year operating period. During the operating period, the MoH will provide the core medical services in the health campuses while the project company will be responsible for hospital management, maintenance, security and support services including imaging, labs, linens, and catering, etc.

Overview of IFC's Scope of Review

IFC’s review of Adana Integrated Health Campus Project (“Adana IHC” or “the project”) consisted of appraising the following technical, environmental, and social information provided by ADN PPP Saglik Yatirim A.S. (“ADN PPP” or “the project company”):

Environmental and Social Impact Assessment Report (ESIA) for Adana Integrated Health Campus (IHC) Project, June 2014,
Adana Integrated Health Campus Project Stakeholder Engagement Plan, June 2014,
Adana Integrated Health Campus Project Non-Technical Summary, June 2014,
Environmental and Social Management Plan for Adana Integrated Health Campus Project, June 2014.

Visit to the project site and its surrounding areas was conducted by IFC staff on November 21st, 2013 and May 28th, 2014. During the site visit, meetings were held with the representatives of sponsors and Adana PPP A.S. including the project manager, as well as representatives from environmental consultancy that prepared the ESIA. The meeting started with a presentation by the Company on the project and continued with the field visit to see the locations of the project components as well as the surroundings of the project area.

IFC’s appraisal considered environmental and social management plans for the project and gaps if any between these plans and IFC requirements. Where necessary, corrective measures, intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through implementation of these management plans and the ESAP the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
Adana ESK_Paydas Katilim Plani.pdf
Adana IHC_Nihai Taslak CSED Raporu_Ana Rapor.pdf
Adana ESK_Teknik Olmayan Ozet.pdf
Adana IHC_Stakeholder Engagement Plan.pdf
Adana IHC_Final Draft ESIA Report_Main Text.pdf
Adana IHC Non-Tecnical Summary.pdf