Environmental & Social Review Summary

Project Number

33776

Company Name

Contecon Manzanillo, S.A. de C.V.

Date ESRS Disclosed

Oct 10, 2014

Country

Mexico

Region

Latin America and the Caribbean

Last Updated Date

Jun 12, 2021

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Jan 7, 2015
Signed : Oct 21, 2015
Invested : Dec 23, 2015

Sector

Port and Harbor Operations

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

CMSA was established to develop and operate a container terminal in the Port of Manzanillo, State of Colima, located on the Mexican Pacific Coast. CMSA has a 34-year concession with APIMAN to operate the terminal. The terminal will be developed in 3 phases. IFC is expected to finance Phase 1 and Phase 2 (“the project”), which is in advanced stages of construction, commenced operations in 3Q2013, and is scheduled to be completed and fully operational by 1Q 2014 with an annual capacity of 500,000 twenty-foot equivalent units (TEUs). Once finalized, the terminal facilities will have a draft of 16 meters, 720 meters of quay, 2 berths, 4 Super Post Panamax cranes and a 41.3 hectare container yard. Phases 2 and 3 are not expected to increase the project physical footprint.
The Project is estimated to cost approximately US$ 555 million. IFC is considering an A loan of up to US$ 65 million for its own account. IFC will also mobilize B loans of approximately US$ 105 million needed to complete the financing plan.

Overview of IFC's Scope of Review

The appraisal of Contecon Manzanillo S.A. de C.V. (“CMSA” or the “Project”) consisted of an extensive desk review of the environmental, social and health and safety (ESHS) impact and risk assessments, environmental licenses, and the preliminary environmental, social, and health and safety management plans and procedures (ESMPs) developed for the project to date, as well as those ESHS studies, plans and procedures developed for the whole port complex by the Manzanillo Port Authority (APIMAN - Administración Portuaria Integral de Manzanillo, S.A. de C.V.). In addition, the Lenders hired an Independent Environmental and Social Consulting (IESC) firm to support the environmental and social due diligence process. Together with the IESC, the Lenders’ team performed a visit to the project site in October 2013, and walked through the existing operating port, including APIMAN’s emergency preparedness and response facilities, the mangrove nursery, and the area in the estuary Laguna de Las Garzas where some of the mangrove restoration and compensation project is currently being executed. The Lenders and the IESC also held several meetings with APIMAN’s ESHS management.
Contecon Manzanillo S.A. de C.V. (“CMSA”) is a wholly owned subsidiary of International Container Terminal Services, Inc. (“ICTSI”), which is a global IFC client. ICTSI owns Tecon Suape in Pernanmbuco, Brazil, where IFC committed a $6 million A loan in 2002 (Project No 11017 – Disclosed in Feb 2002). The loan has matured and was fully paid in 2012, but while it was in IFC portfolio it maintained a good ESHS performance.
IFC’s appraisal considered the environmental and social management plans for the project and the gaps, if any, between these plans and IFC’s requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through the implementation of these management plans and the ESAP, the project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan