33385
BIDCO AFRICA LIMITED
May 3, 2014
Kenya
Africa
May 1, 2024
B - Limited
Completed
Approved : Jun 13, 2014
Signed : Jun 26, 2014
Invested : Jun 30, 2016
Other Food
Agribusiness and Forestry
Regional Industry - MAS Africa
| Bidco Kenya(33385) Supervision Disclosure Snapshot – Version 3 | ||||
|---|---|---|---|---|
| Description | Anticipated Completion Date | Status | Comments | Completion Date |
| BIDCO will design and implement an Integrated Environmental, Occupational Health and Safety (OHS), and Social Management System – consistent with ISO 14001, OHSAS 18001 and HACCP/ISO 22001 – in accordance with IFC PS1 requirements to be reviewed and approved by IFC, defining roles and responsibilities and manual procedures (to enable it to comply with Kenyan laws and regulations, IFC Performance Standards and applicable WBG’s Environmental, Health and Safety (EHS) Guidelines). The Management System will include mechanisms for the QA/EHS/Certification manager to report monthly environmental and social (E&S) monitoring results to the CEO who will need to sign off on the reports. Bidco will finalize job descriptions defining specific E&S roles and responsibilities, including supervisory and accountability framework, satisfactory to IFC, including composition of EHS Committee | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| Bidco will design and implement an Integrated Environmental, Occupational Health and Safety (OHS), and Social Management System (or an integrated ESMS) – consistent with ISO 14001, OHSAS 18001 and HACCP/ISO 22001 – in accordance with IFC PS1 requirements to be reviewed and approved by IFC, defining roles and responsibilities and manual procedures (to enable it to comply with Kenyan laws and regulations, IFC Performance Standards and applicable WBG’s Environmental, Health and Safety (EHS) Guidelines). The Management System will include mechanisms for the QA/EHS/Certification manager to report monthly environmental and social (E&S) monitoring results to the CEO who will need to sign off on the reports. | 30-Sep-2015 | Completed | Completed | 12/19/2018 |
| BIDCO will adopt Key Performance Indicators (KPIs) to mainstream EHS parameters, including: a) Safety – Lost Time Incidence Frequency Rate (LTIFR - Number of injuries per million of hours worked); Accident Free Days ( Number of Days since last Lost Time Incident); b) Sustainability – Carbon (kg/ton - CO2 emitted / tons produced); Water Usage (kiloliters/ton) and Efficiency - Consumed versus tons produced; Energy Usage (kWh/ton) - Energy consumed/tons produced; Wastewater monitoring effluents and air emissions parameters; c) Staff - Retention - Number of full time equivalents leaving in the period /Avg. full time equivalents - and Training days - Number of training days provided to new and existing employees. Monthly and annual report will be reviewed during BIDCO’s monthly EHS Review and annually during the Company’s planning and budgetary management review. | 28-Dec-2015 | Completed | Completed | 12/19/2018 |
| Finalize job descriptions defining specific Environmental and Social (E&S) roles and responsibilities, including supervisory and accountability framework, satisfactory to IFC, including composition of an Environmental, Health and Safety (EHS) Committee | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| BIDCO will prepare an integrated EHS report format based on critical EHS key performance indicators (e.g. compliance with legal and regulatory requirements, including the EIA’s Environmental Management/Monitoring Plan, EHS management system progress report and voluntary certification, including food safety management system (HACCP/ISO22000), energy and water consumption and efficiency; GHG emissions; solid and hazardous waste management and disposal, effluent discharges from the WWT unit, compliance with national OHS requirements, including accident rates (lost-time accidents); customers and community complaints, supplier performance and community engagement activities) and report annually to relevant Kenyan authorities and IFC as part of the Annual Monitoring Report (AMR). | 30-Jul-2016 | Completed | Completed | 12/19/2018 |
| Evidence of complete and effective implementation of the integrated ESMS and procedures at the plant (e.g. final documentation of the ESMS, including policies, plans, manual procedures and programs, e.g. EHS training logs, EHS monitoring and reporting plan, emergency preparedness and response, community and suppliers grievance policy and mechanism, OHS policies and procedures implementation, plant’s key performance indicators monitoring record, including liquid, air and solid effluents, waste management, hazardous chemical, fleet efficiency and safety management plan, food security procedures, wastewater, solid plant, minutes of progress reviews). | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| As part of its overall ESMS (please refer to ESAP, Action Item 1) BIDCO will develop and implement a specific management procedure for its supply chain, which will include the development and implementation of a Supplier’s Code of Conduct (including prohibition of harmful child/forced labor) which will be mainstreamed into contractual agreements with major suppliers. Implementation of this Code will be done through Bidco’s upstream team and associated training. | 01-Oct-2015 | Completed | Completed | 12/19/2018 |
| Bidco will adopt Key Performance Indicators (KPIs) to mainstream EHS parameters, including: a) Safety – Lost Time Incidence Frequency Rate (LTIFR - Number of injuries per million of hours worked); Accident Free Days ( Number of Days since last Lost Time Incident); b) Sustainability – Carbon (kg/ton - CO2 emitted / tons produced); Water Usage (kiloliters/ton) and Efficiency - Consumed versus tons produced; Energy Usage (kWh/ton) - Energy consumed/tons produced; Wastewater monitoring effluents and air emissions parameters; c) Staff - Retention - Number of full time equivalents leaving in the period /Avg. full time equivalents - and Training days - Number of training days provided to new and existing employees. Reports will be reviewed during BIDCO’s monthly EHS Review and annually during the Company’s planning and budgetary management review. | 30-Sep-2015 | Completed | Completed | 12/19/2018 |
| Bidco will develop and implement Human Resources Policies and Procedures appropriate for its workforce that set out the approach to managing workers consistent with the requirements of Performance Standard 2 and the Kenyan Labor Code. A grievance mechanism will be included as part of the procedure. | 30-Jul-2015 | Completed | Completed | 12/19/2018 |
| Bidco will prepare an integrated EHS report format based on critical EHS key performance indicators (e.g. compliance with legal and regulatory requirements, including the EIA’s Environmental Management/Monitoring Plan, EHS management system progress report and voluntary certification, including food safety management system (HACCP/ISO22000), energy and water consumption and efficiency; GHG emissions; solid and hazardous waste management and disposal, effluent discharges from the WWT unit, compliance with national OHS requirements, including accident rates (lost-time accidents); customers and community complaints, supplier performance and community engagement activities) and report annually to relevant Kenyan authorities and IFC as part of the Annual Monitoring Report (AMR). | 30-Mar-2016 | Completed | Completed | 12/19/2018 |
| Bidco will develop and implement Occupational Health and Safety (OHS) policies and procedures demonstrating compliance with WBG’s EHS requirements. The policies and procedures should include identification of managers responsible for OHS performance, on-going training, and a mechanism for reviewing deviations from procedures and improving performance both during construction and operational phase. | 30-Jul-2014 | Completed | Completed | 12/19/2018 |
| As part of its overall ESMS (please refer to ESAP, Action Item 1) BIDCO will develop and implement a specific management procedure for its supply chain, which will include the development and implementation of a Supplier’s Code of Conduct (including prohibition of harmful child/forced labor) which will be mainstreamed into contractual agreements with major suppliers. Implementation of this Code will be done through Bidco’s upstream team and associated training. | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| Bidco will a) develop and implement a safe driver and transport safety vehicle procedure, including training and monitoring program for its drivers and contractors (to the extent that it is commercially feasible, for the fleet of transportation sub-contractors) emphasizing the following: safety aspects among drivers, improving driver skills, licensing of drivers, provision of this procedure in contractual arrangements, and overall truck maintenance; and b) Bidco will adopt a formal Stakeholder Engagement Plan incorporating a Community Grievance Mechanism as part of its EHS management system, as articulated in the attached ESAP. A specific management procedure will be developed and implemented before construction phase | 30-Jul-2014 | Completed | Completed | 12/19/2018 |
| Bidco will develop and implement Human Resources Policies and Procedures appropriate for its workforce that set out the approach to managing workers consistent with the requirements of Performance Standard 2 and the Kenyan Labor Code. A grievance mechanism will be included as part of the procedure. | 30-Mar-2015 | Completed | Completed | 2/8/2019 |
| Bidco will (a) develop and implement Occupational Health and Safety (OHS) policies and procedures demonstrating compliance with WBG’s EHS requirements. The policies and procedures should include identification of managers responsible for OHS performance, on-going training, and a mechanism for reviewing deviations from procedures and improving performance both during construction and operational phase. (b) Obtain the construction contractor’s OHS and EMP manual and contractual OHS requirements, consistent with EIA documentation. Assign a BIDCO’s OHS construction supervisor and the Factory Architect’s own OHS supervision oversight responsibilities and inspection schedule. | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| Diesel storage tanks on all sites are to be restricted (boundary fence or wall) and bunded with secondary containment. If underground storage tanks are used, leak detection systems, pressure testing and monitoring will be implemented, as well as providing sumps and appropriate remediation protocols in the event of any spillage or contamination incident. | 30-Mar-2015 | Completed | Completed | 12/19/2018 |
| Bidco will develop and implement a Pest and Rodent Management System Procedure. The procedure will eliminate the use of WHO Class 1a and 1b chemical formulations in its facilities. The company will modify service contracts for all Bidco sites to require service providers’ mandatory training of its workers and adequate PPE based upon MSDS and/or ICSCs for the materials used. | 30-Mar-2015 | Completed | Completed | 2/8/2019 |
| Bidco will install a water treatment facility at the new factory, and implement a water monitoring plan for the water being used in production. A water monitoring program will be implemented which must include all parameters to comply with WBG’s EHS requirements and Kenyan Environmental Management and Coordination (Water Quality) Regulations (2004). | 30-Mar-2015 | Completed | Completed | 2/8/2019 |
| Bidco will design and construct a Waste Water Treatment unit in compliance with Kenyan and applicable WBG’s effluents guidelines, especially for pH, BOD, COD, total suspended Solids, Grease, total nitrogen and total phosphorus. All effluents from the new Bidco factory will be treated when its WWT plant expansion is completed A wastewater monitoring program will be implemented which must include all parameters within WBG’s effluents guidelines. | 30-Mar-2015 | Completed | Completed | 2/8/2019 |
| Bidco will a) develop and implement a safe driver and transport safety vehicle procedure, including training and monitoring program for its drivers and contractors (to the extent that it is commercially feasible, for the fleet of transportation sub-contractors) emphasizing the following: safety aspects among drivers, improving driver skills, licensing of drivers, provision of this procedure in contractual arrangements, and overall truck maintenance; and b) Bidco will adopt a formal Stakeholder Engagement Plan incorporating a Community Grievance Mechanism as part of its EHS management system. A specific management procedure will be developed and implemented before construction phase. | 30-Mar-2015 | Completed | Completed | 2/8/2019 |