Environmental & Social Review Summary

Project Number

33098

Company Name

SOCIETE EIFFAGE DE LA CONCESSION DE L'AUTOROUTE DE L'AVENIR S.A.

Date ESRS Disclosed

May 1, 2014

Country

Senegal

Region

Africa

Last Updated Date

Jul 17, 2024

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Sep 30, 2014
Signed : Dec 4, 2014
Invested : Feb 1, 2016

Sector

Highway Operations (Includes Toll Roads)

Industry

Infrastructure

Department

Regional Industry - INF Africa

Project Description

The project consists of a 17 km extension (the “Project”) of an existing IFC project (SENAC, project #29008) -a 24km Dakar-Diamniadio toll road project (the “Initial Project”) - in full operation since August 2013, which is considered to be a flagship Private Public Partnership in the region. The Project aims to connect the city center of Dakar with the new Blaise Diagne International Airport (“AIBD”), presently under construction. The Project will be designed, built, operated and maintained by the Concessionaire under a 25 year concession contract.

The contractual and construction arrangements are broadly the same as for the first project, with SENAC SA., a Special Purpose Vehicle created for the Initial Project and 100% owned by Eiffage S.A., responsible for the finance, design, construction, operation and maintenance of the concession. SENAC has subcontracted the design and construction to a joint venture composed of Eiffage Travaux Publiques and Eiffage Senegal (the “EPC Contractor”) which is a reputable construction company in Senegal and has been operating in the country since 1926. Both SENAC and APIX have gained significant experience from managing the broad environmental, safety and social (displacement of 30,000 PAPs) issues from the Initial Project. SENAC has been to date materially compliant with the E&S requirements of IFC on this Initial Project.

Overview of IFC's Scope of Review

IFC’s Environmental and Social (E&S) appraisal of this Project mainly consisted of:
-the review of (a) the Environmental and Social Impact Assessment (ESIA) titled Mbaye Mbengue Faye, Etude d’impact environnemental et social du prolongement de l’autoroute Diamniadio- AIBD, May 2013; (b) the Resettlement Action Plan (RAP) titled APIX, s.a., Plan d’action de réinstallation du projet de prolongement de l’autoroute à péage Diamniadio-AIBD, September 2013;
-meetings with the E&S team of the Agence Nationale Chargée de la Promotion et de l’Investissement des Grands Travaux (APIX) - the government agency in charge of large projects. Most of the team members were involved in the resettlement process as well as the forest management plan for the Initial Project. APIX is responsible for the RAP implementation and has some responsibilities in the implementation of the Environmental and Social Management Plan (ESMP). Issues discussed included RAP implementation status; permits and environmental compliance certificate; decree for the decommissioning of the portion of the forest reserve located in Thiés; and forest management plan;
-meeting with SENAC’s management and Project team including social specialist consultant and the construction site Environmental Health and Safety (EHS) Coordinator. Discussion included update on E&S management of the first leg of the highway; SENAC’s stakeholder engagement as well as its organizational capacity to manage E&S aspects of the Project;
-Drive through the entire right of way with several stops to interview with some people encountered along the route such as workers, residents, hunters, herders, and the headmaster of a school that was resettled. Discussions centered around current and anticipated impacts from their perspectives as well as engagement with APIX and SENAC;
-visit to Rufisque office of the dispute resolution commission where APIX and Project Affected Peoples (“PAPs”) meet to negotiate settlement.
- Review of IFC’s E&S supervision history for the existing SENAC project (# 29008, disclosed June 10, 2010), based on site visits and Annual Monitoring Report reviews, including the current E&S performance status which is satisfactory; and
IFC’s appraisal considered the environmental and social management plans for the project and the gaps, if any, between these plans and IFC’s requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time, are summarized in the paragraphs that follow and in the agreed Environmental and Social Action Plan (ESAP) disclosed in this review summary. Through the implementation of these management plans and the ESAP, the Project is expected to be designed and operated in accordance with Performance Standards objectives.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan