Environmental & Social Review Summary

Project Number

32859

Company Name

AZURA POWER WEST AFRICA LIMITED

Date ESRS Disclosed

Sep 5, 2013

Country

Nigeria

Region

Africa

Last Updated Date

Apr 6, 2026

Environmental Category

A - Significant

Status

Active

Previous Events

Approved : May 1, 2014
Signed : Nov 25, 2014
Invested : Dec 29, 2015

Sector

Gas - Thermal Power Generation

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

The Project consists of a Greenfield 450 MW (net) open cycle gas turbine (“OCGT”) power plant covering approximately 12.5ha of a 102ha site located in Edo State, Nigeria. The Project site is located to the north-east of Benin City, adjacent to the existing NIPP, just outside the limits of the built up area and within the Benin bypass road. It mainly consists of secondary forest, subsistence farming (slash and burn practices), plantation (palm oil, rubber), and dwellings and footpaths.

The Project Sponsor is Azura Power West Africa Limited (“Azura”), a subsidiary of Amaya Capital Limited (“Amaya”). The OCGT plant has been designed to accommodate the potential conversion to Closed Cycle Gas Turbine (CCGT) with a total net output of approximately 670 MW. There are two associated facilities: an above ground 300kV transmission line (less than 1 km), with two pylons, connecting the Project site to the Benin North substation (adjacent to the Project site); and an underground gas pipeline spur of approximately 1km in length connecting the power plant to the Escravos Lagos Pipeline System (“ELPS”). The existing Benin-North substation is not an associated facility given that its use predates the Project.

The World Bank is involved in the restructuring of the energy sector in Nigeria, and is expected to have a role in this Project through the partial risk guarantee (“PRG”) scheme being proposed. Azura is one of 14 IPPs nominated by the Nigerian Federal Ministry of Finance for participation in the proposed PRG series. MIGA is considering providing political risk insurance for the Project.

Overview of IFC's Scope of Review

IFC visited the Project site and area in November 2012 and coordinated its review with the complementary World Bank team supporting the Government of Nigeria in this effort. The following activities were also conducted:
Review of the Azura-Edo Independent Power Project (IPP) Environmental Impact Assessment (EIA) dated February 2012 by ERM;
Review of the Resettlement Action Plan (RAP) for the Azura-Edo Independent Power Plant dated February 2012 by ERM;
Review of the RAP addendum for Azura-Edo Independent Power Plant dated May 31, 2013 by ERM;
Review of ESIA addendum (including Air Modelling and Impact Assessment Update) For the Azura-Edo IPP dated July 2013;
Interviews with Azura Project Manager;
Meeting Ministry of Land – Benin State;
Separate Meetings with the Communities of Orior-Osemwende, Idunmwowina-Urho-Nisen and Ihovbor-Evboeka;
Meeting with the Association of Landlords affected by the resettlement;
Visit to the transmission station and also view of the of the National Integrated Power Project (NIPP) Plant established by the Federal Government and located closed to the Project; and
Visit to some of the Benin Moats network, and surrounds.

Refer to the Early Disclosure website which provides supporting documentation

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan