PROJECT

Projects

Environmental & Social Review Summary

Project Number

32752

Company Name

ELICIO ALI VE D.O.O. BEOGRAD

Date ESRS Disclosed

Apr 24, 2013

Country

Serbia

Region

Europe

Last Updated Date

Dec 18, 2022

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : May 31, 2013
Signed : Jun 28, 2017
Invested : Feb 13, 2018

Sector

Wind Power - Renewable Energy Generation

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

The Project will be developed by Electrawinds (Serbia) a wholly owned subsidiary of Electrawinds, a renewable energy company based in Ostend Belgium that has developed wind energy projects throughout Europe (Belgium, Italy, France, Bulgaria and Romania) as well as South Africa. Including solar and biomass generation assets, the company has an installed capacity of 256 MW.

Electrawinds is proposing to develop a 42 MW Wind Farm (21 turbines each of 2 MW) on a 450ha site between the village of Vladimirovac and Alibunar in Vojvodina Province, north east Serbia. The project site is located in an area designated for wind farm development under the 2012 Spatial Plan for Alibunar Municipality and design and development schemes proposed by the company have followed the requirements of the 2012 Detailed Plan of Regulation for Alibunar Municipality.

The site design and layout comprises three lines of turbines running in a north–easterly / south-westerly alignment. The distance between the towers in each row will be between 400-500m and the rows will be separated by 700-800m. The distance from the most easterly row of turbines and the A70 trunk road will be at least 250 m (Serbian requirements for safety setback are minimally 210m). Each turbine will have a foundation “footing” of between 12-20m radius. Tower height will be maximally 100m (with an additional 49m blade radius sweep), and the project site will additionally contain supporting road infrastructure and facilities. All on site cabling will be underground.

The Alibunar site will be connected (via underground cabling) to an existing 110kV transmission line that lies approximately 1km to the south of the site and a new 4ha substation will be constructed at this site. Electrawinds (Serbia) is working with the electricity distribution company “EMS” to improve and upgrade substation capacity and will pass ownership of the substation to the agency when it has been constructed.

The landscape in and around the project site comprises flat or gently undulating land and the current land use at the wind farm and substation sites is for arable crops (primarily corn and wheat). Surrounding land use is also primarily for arable agriculture. Soils are sandy and free draining and agricultural land quality across most of the site is graded as 5-6 (poor). The site contains no natural habitats, water bodies or other features of ecological significance. The Deliblasko Sands (Deliblatska Pescara) “Important Bird Area” lies approximately 2.5 km south of the site and is separated from the wind farm by intensively farmed agricultural lands.

The wind farm site is bounded to the immediate south by the A70 Trunk road and to the north by an unpaved road and rough grazing (known locally as the Volovski Put). The town of Alibunar lies 5km to the north east and the village of Vladimirovac lies 2.5 km to the south west. There are no houses or habitation on or adjacent to the wind farm site.

Overview of IFC's Scope of Review

IFC’s review of this investment consisted of appraising technical, environmental and social information made available by the sponsor, including the following documents:

Study on the Environmental Impact Assessment (EIA) of the Project for the development of “Alibunar” Wind Park on the Alibunar Municipal Territory on Cadastral Parcels No: 5016/2, 5045, 5078, 5146/3, 5147, 5396, 5123/2, 5123/3, 5086, 5087, 5166/2, 5196/1, 5196/2, 5230, 5311/3, 5278/3, 5234, 5323, 5324, 5358/1, 5358/, 5462, 5463/1, 5428/1, 5398/1, 5398/2, 67449, 6787, 6832 and 5786/17 Alibunar Cadastral Municipality (July 2012).
Guidelines on the Environmental Impact Assessment of Wind Farms – Strengthening the capacities of Western Balkan countries to address environmental problems through remediation of priority hotspots. Western Balkan Environment Program and UNDP (June 2010).
Analysis of impact of planned wind farm Alibunar on birds and bats (Proposed final report) Voislav Vasic, Andrej Conti, Danijela Anastasov, Jelena Nikolic Antonijevic and Senka Puhalo (Beograd, December 2011).
Preliminary Report on Power Curve & Sound Power Level from REpower MM100 [50Hz/2MW] Turbines.
Institute for the Protection of Cultural Monuments Pancevo (undated): Final report of archeological research of wind farm location Malibunar and Alibunar at cadaster municipality Vladimirovac and Alibunar, municipality Alibunar.
Between 5th and 7th March 2013, the appraisal team also met with Professor Voislav Vasic (ornithological consultant), representatives of the Institute for Nature Conservation Vojvodina Region, officials from Alibunar Municipality and the legal representative for individuals who had sold or leased land to Electrawinds.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
S Banat Region WPP RCIA Rev 6.pdf