PROJECT

Projects

Environmental & Social Review Summary

Project Number

32218

Company Name

VJETROELEKTRANA JELINAK d.o.o.

Date ESRS Disclosed

Apr 24, 2013

Country

Croatia

Region

Europe

Last Updated Date

Oct 23, 2024

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : May 24, 2013
Signed : May 30, 2013
Invested : Jul 17, 2013

Sector

Wind Power - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

The proposed investment involves an A Loan for IFC’s own account of up €6 million; a B Loan of up to €20 million and a C Loan for IFC’s account of up to €4 million to finance a greenfield wind power plant (“Jelinak WPP”) totaling 30 MW in the northwest of Splitsko-Dalmatinska region, 5 km from the coastline. Jelinak WPP is wholly-owned by Vjetroelektrana Jelinak d.o.o, a limited liability company incorporated under Croatian Law and wholly owned by Acciona Energia (AE) International. Construction of the project took place during the year 2012 and commercial operation of the wind farm started in January 2013.

The project is comprised of twenty 1.5 MW wind turbines set approximately 230 m apart; access roads; a 12 kW cable network linking the towers; and a sub-station connecting the windfarm to the existing 110 kV Bilice-Trogir overhead transmission line. The towers are 80 m high and the turbine blades 82 m in diameter, with a tip height of 120 m.

Overview of IFC's Scope of Review

IFC review of this project consisted of appraising technical, environmental and social information made available by the Sponsors, undertaking site visits and meeting with Sponsor representatives and consultants. Key documents reviewed included the Environmental Impact Assessment (EIA) prepared in 2009 for the project undertaken by Oikon (Croatian Institute for Applied Ecology); maps and plans of the site and surrounding area; the EIA Decision document issued by the Croatian Ministry of Environmental Protection, Physical Planning and Construction which includes implementation conditions; a detailed Environmental Management Plan (EMP) prepared for the project in 2012; a radio-electric interference study for the project; a visual impact study produced for the project; the scope of work for third party design and E&S consultants Eurus; and the terms of reference for ongoing bird and bat monitoring studies.

Site visits were undertaken in May 2012 when construction was underway. Visits were made to the project site; sub-station site; a shipyard in the nearby town of Split where wind towers were being manufactured; and the dock where the turbines and electro-mechanical equipment were offloaded and stored prior to transport to site. Meetings were held in the nearby town of Split with Acciona Energia (Sponsor) representatives, representatives from the design and implementation company Eurus, and from Alfa Test, an independent Occupational Health & Safety (OHS) Consultancy.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan