Environmental & Social Review Summary

Project Number

31612

Company Name

PACIFIC INFRASTRUCTURE VENTURES INC SUCURSAL COLOMBIA

Date ESRS Disclosed

Jan 13, 2013

Country

Colombia

Region

Latin America and the Caribbean

Last Updated Date

Nov 10, 2022

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Jul 1, 2013
Signed : Jul 31, 2013
Invested : Nov 6, 2013

Sector

Port and Harbor Operations

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

This Project consists of a proposed US$ 150 million IFC / AMC equity investment to support Pacific Infrastructure’s (“PI” or the “Company”) future infrastructure developments, focusing on the construction and operation of Sociedad Portuaria Puerto Bahía (PB) - a greenfield multipurpose terminal located in Cartagena, Colombia-, and Oleoducto del Caribe (Olecar) a 142-km pipeline to bring petroleum liquids from Coveñas to the Puerto Bahía terminal site (the “Sub-projects”). The development of PB includes the construction of a 100-m long bridge across Canal del Dique, complementing the recently built Cartagena-Baru highway. The bridge is already fully licensed and construction was initiated in December 2012. Other PI future investments that are being considered and in very early stages of development include: Varadero, which involves the dredging of a new alternative access canal to the Bay of Cartagena; and a Free Trade Zone Project adjacent to the PB site.
Sociedad Portuaria Puerto Bahía (SPPB): Will be located in a corner 100-ha plot at the Island of Baru in the Bay of Cartagena. SPPB will have a waterfront of 570 m along the left bank of Canal del Dique and a waterfront of approximately 750 m along the Bay. SPPB will construct and operate a multipurpose liquid, dry, break bulk, and container terminal. The construction period commenced in the last quarter of 2012 and is expected to last for about 24 months.
The liquids terminal will have specialized infrastructure for handling and storing crude oil exports and diluent imports (Naphtha). SPPB will develop an installation that will house 10 tanks with a nominal storage capacity of 334,000 bbl each, for a total storage capacity of 3.3 million bbls. Out of the 10 tanks, 8 will be dedicated for the storage and export of crude oil, and 2 will be dedicated for the reception of Naphtha imports from vessels and delivery to outgoing tanker trucks. The incoming pipeline will have an initial transportation capacity of 300,000 bbl/d, which will be complemented by a truck loading/unloading station capable of handling up to 30,000 bbl/d, and a barge handling facility with a capacity of up to 45,000 bbl/d. The truck station will be built inside the project development site. The terminal will also have a jetty to allow for 2 berthing positions, of which 1 will service vessels of up to 80,000 DWT and 1 will service vessels of up to 150,000 DWT. Adjacent to the liquids terminal will be a multipurpose facility that will include a berthing platform 297 m in length, and approximately 20 ha. of on-shore facilities designed to handle general, break bulk, and vehicle Roll-on/Roll-off cargoes.
Oleoducto del Caribe (Olecar): 142-km, 30” diameter pipeline to bring crude oil from Coveñas to the Puerto Bahía terminal site, with an initial transportation capacity of 300,000 bbl/d. It will also include a connection to the Reficar refinery through a 16” pipeline approximately 7-km in length. The pipeline connection to the terminal will be laid underneath Canal del Dique by directional drilling. This project is still in the early stages of development and the ESIA process will formally start in early 2013. Construction is not expected to commence until the 1st quarter of 2014.

Overview of IFC's Scope of Review

Sociedad Portuaria Puerto Bahía (SPPB): For the SPPB sub-project, an extensive review of the environmental and social impact studies, environmental licenses, and ESHS proposed management plans was performed, and the IFC team met with SPPB’s personnel responsible for ESHS management, including the community liaisons and social management team from the Fundación Puerto Bahía (FPB). Furthermore, IFC representatives met with the EPC ESHS management team, as well as the ESHS supervision team from Oiltanking, the owner’s engineer. In addition, the team visited the sub-project site, where only minimum construction activities had commenced (e.g. land clearance and early excavation) and held meetings with representatives and authorities from the five Afro-Colombian Affected Communities that will be impacted by Puerto Bahía’s construction and operation, namely Ararca, Santa Ana, Pasacaballos, Caño de Oro, and Bocachica.
Oleoducto del Caribe (Olecar): IFC appraisal of this sub-project consisted on a desk review of the alternative analysis (DAA- Diagnóstico Ambiental de Alternativas) developed by the Company and presented to the Colombian environmental licensing granting authority (ANLA – Autoridad Nacional de Licencias Ambientales) as a preliminary stage before it authorizes the routing alternative upon which the ESIA process can be performed. IFC specialist met with ANLA representatives to get their views of the environmental and social risk of the proposed alternatives, and to understand the authorities’ views on the project.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation

File Name Actions
II Puerto Bahia (a) - 3 Linea Base EIA Biotico.pdf
II Puerto Bahia (a) - 3 Linea Base EIA Abiòtico.pdf
II Puerto Bahia (b) - 9.Plan de Contingencia 10-11.pdf
II Puerto Bahia (b) - 9.1 Área de sensibilidad ambiental.pdf
II Puerto Bahia (b) - 8.Monitoreo y seguimiento 10-11.pdf
II Puerto Bahia (b) - 7.Plan Manejo Ambiental 10-11.pdf
II Puerto Bahia (b) - 6.Zonificacion de Manejo Ambiental 10-11.pdf
II Puerto Bahia (b) - 5.Evaluación Ambiental 10-11.pdf
II Puerto Bahia (b) - 4.Demanda Uso y Aprovechamiento 10-11.pdf
II Puerto Bahia (b) - 3.Medio Socioeconómico 10-11.pdf
II Puerto Bahia (b) - 3.Medio Biótico 10-11.pdf
II Puerto Bahia (b) - 3.Medio Abiótico 10-11.pdf
II Puerto Bahia (b) - 3.9 Mapa de muestreo de Ruido- .pdf
II Puerto Bahia (b) - 3.11 Zonificación ambiental.pdf
II Puerto Bahia (b) - 3.10 Social.pdf
II Puerto Bahia (b) - 2.3 Canales de acceso marítimo.pdf
II Puerto Bahia (b) - 2.2 Área de la licencia ambiental solicitada.pdf
II Puerto Bahia (b) - 2.1 Localización del proyecto.pdf
II Puerto Bahia (b) - 2 Descripción Proyecto 10-11.pdf
II Puerto Bahia (b) - 10.Plan de Abandono y Restauracion 10-11.pdf
II Puerto Bahia (b) - 1 Generalidades 10-11.pdf
II Puerto Bahia (b) - 0.Tomo I - Resumen Ejecutivo.pdf
II Puerto Bahia (a) - 1 Generalidades.pdf
II Puerto Bahia (a) - 10 Abandono y Restauracion.pdf
II Puerto Bahia (a) - 2 Descripción de proyecto.pdf
II Puerto Bahia (a) - 3 Línea Base EIA Social.pdf
II Puerto Bahia (a) - 4 Demanda Uso y Aprovechamiento.pdf
II Puerto Bahia (a) - 5 Evaluacion Impacto Ambiental.pdf
II Puerto Bahia (a) - 6 Zonificacion y Manejo.pdf
II Puerto Bahia (a) - 7 Plan Manejo Ambiental ajustado PB.pdf
II Puerto Bahia (a) - 8 Monitoreo y Seguimiento.pdf
II Puerto Bahia (a) - 8_Monitoreo_y_seguimiento__08-11-10[MAVDT].pdf
II Puerto Bahia (a) - 9 Plan de Contingencia.pdf
II Puerto Bahia (a) - Bibliografia.pdf
II Puerto Bahia (d) - PB - Cronograma Plan Estratégico Gestión ambiental y social PI (SPPB).pdf
III Olecar (a) - CAP 9 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 8 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 7 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 6 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 5 DAA OLCAR FINAL.pdf
III Olecar (a) - CAP 4 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 3 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 2 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 12 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 11 DAA OLECAR FINAL.pdf
III Olecar (a) - CAP 10 DAA OLCAR FINAL.pdf
IV Fundacion Puerto Bahia - Cartilla Didáctica Olecar Consulta Previa.pdf
III Olecar (c) - OLECAR - Cronograma Ambiental y Social - Olecar.pdf
III Olecar (b) - OLECAR - 2012 02 29 Olecar Certificacion de Comunidades 287 del MinInterior Olecar.pdf
II Puerto Bahia (c) - Certificacion de Comunidades del MinInterior.pdf
I Pacific Infra - POLITICA CORPORATIVA DE GESTION SOCIAL Y AMBIENTAL.pdf
PS1.txt