PROJECT

Projects

Environmental & Social Review Summary

Project Number

31433

Company Name

A & C Development

Date ESRS Disclosed

Jan 27, 2012

Country

Ghana

Region

Africa

Last Updated Date

Dec 1, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Jun 13, 2012
Signed : Jun 15, 2012
Invested : Mar 11, 2013

Sector

Retail (Including Supermarkets, Grocery Stores, etc.)

Industry

Tourism, Retail and Property

Department

Regional Industry - MAS Africa

Project Description

A&C Development Company Limited (“A&C Development” or the “Company”) is a privately held real estate development company based in Accra, Ghana. The A&C Square was conceived as a one-stop mall concept consisting of a shopping mall, a fuel station, fitness centre/office block building, a pool area, two multi-purpose business plazas and a children’s play ground. The first phase of the project comprising the shopping mall and an adjacent fuel station was built over 4 years (commissioned in 2006). The second phase, or the expansion, which started in 2007 included fitness center/office block, pool block, children’s playground area and Business Plaza I (an office block) all of which were completed by May 2010. The proposed IFC loan will be used to fast track the completion of the third phase or expansion program of the A&C Mixed Use Complex (“A&C Square”) comprising the construction of an additional office blocks (Business Plaza II) and the refurbishment of the existing retail area (“A&C Mixed Use” or the “Project”).

Overview of IFC's Scope of Review

IFC''s review for this project included meetings with the management team of A&C Development Co; the executive team of the property management company in charge of the existing A&C Square development; and the design team, including representatives from the architects and the refrigeration and air conditioning engineers. In addition, a visit to the existing A&C Square which includes the site of the proposed project was conducted.

The following information was also reviewed: (i) responses to an IFC environmental and social appraisal questionnaire; (ii) existing operation licenses including Fire and Safety inspections by local authorities; (iii) contractual documentation between A&C Development and the management company and other contractors; and (iv) A&C Development’s human resources policies and procedures. The proposed project is in an early planning stage; therefore, detailed information on the design and environmental assessment of the project will be reviewed as the information become available.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation