PS 1: Social and Environmental Assessment and Management System
Microqual has ISO 9001:2008 certified Quality Management System and ISO 14001:2004 certified Environment Management System. Additionally, the company has ERP system on product side (RF equipments) and online project management system to keep control of project milestones, monitoring and maintenance. Microqual also provides Remote Monitoring Unit (RMU) and Nodal Operation Centres (NOC) to further keep a control on fault identification and timely rectification. Microqual has product approvals from majority of its clients like Bharti Airtel, Aircel, Nokia-Siemens, Vodafone, BSNL, Huawei and ZTE. The company has internal procedures for health and safety, work permits, provisioning of Personal Protective Equipments (PPE) etc. The Company implements an accident reporting system. The Company also prepares a training calendar and training plans for its employees.
Up to date recordkeeping in O&M site logbook for OEM maintenance checkups, diesel fuelling, power consumption etc will be ensured at all sites. On multi-tenant sites where Microqual is undertaking O&M for one or two tenants’ general environment management will be improved to the extent possible.
Microqual will ensure that the environment, health, and safety procedures and protocols of the company across its operations as well as site level HSE plans will be consistent with the applicable Performance Standard. This will be done before start of any construction activity related to ‘power-tower’ business and for the rest of the business within 3 months.
To be able to track and ensure compliance to statutory requirements, Microqual maintains a compliance track sheet at Aurangabad facility. Microqual will ensure similar practices across all facilities and business operations. For any future acquisitions, Microqual will, within 6 months of acquisition, complete assessments, develop systems and procedures, acceptable to IFC, to ensure compliance with PS requirements.
PS 2: Labor and Working Conditions
Microqual currently employs around 539 on roll employees and around 481 temporary staff (mostly involved in O&M and has around 70 engineers and diploma holders). It also hires additional contractor provided labor for non critical activities like housekeeping, drivers, security and support staff. Microqual has a policy against using child labour at any of its facilities. The HR policy of Microqual has rules and procedures for leave, travel, gratuity allowances, medical benefits (covering family). Employee unions are not allowed. The present system of employee consultation is through departmental meetings and reviews. Grievances are handled informally by the line manager and supervisors. A formal grievance mechanism with grievance escalation procedure will be put in place within 3 months. Working conditions and terms of employment are set out at the time of employment. There have been no need of engaging workers/labour in overtime so far and the company is committed to comply with national laws if overtime is required.
While using contractors labour, company ensures minimum wages, working hours, PF return filing and avoiding use of child labour is compliant to labour legislations. In tower erection business, different contractor teams move in to the site at different time, e.g. civil team comprising on average 6-8 workers would be the first one to move in for 7-8 days, followed by tower erection team of 10-12 workers for 5 days. Going forward the company will ensure that only registered contractors are given site work contracts.
The company has provided adequately clean, well lit, ventilated and spacious working environment at its manufacturing facility in Aurangabad. It provides clean drinking water and toilet facilities, and eating and resting place for workers. Simple firstaid box is also kept at the premise and emergency contact numbers are displayed. Every workstation has a process flowchart and progress is monitored frequently. Plan, Do, Check and Act (PDCA) and 5-S are implemented at the facility. Small number of contractor workers is involved in recycling the packing material and manufacturing packing material within the premise. Quarterly noise monitoring is done by an environmental consultant at both the manufacturing facilities and reports are submitted to the State Pollution Control Boards. Working at heights is done through permit system and the safety manual covers general H&S situation of lifting, lifting tackles/forklift operations, first aid, use of PPEs, fire fighting, electrical and material and machine handling, general housekeeping and standard Do/Don’t procedures. Accident/incident reporting system is also in place.
Current training calendar and training programs are focused on fire and life safety, first aid, Quality Management System (QMS), Environment Management System (EMS) 5-S kaizen, use of PPEs, operations, testing and handling of RF equipments, product knowledge for which internal as well as external resources are mobilized. For the ‘power-tower’ business, specialized manpower will be needed with adequate training. Company is addressing this through appropriate training. As per agreement with PGCIL, the company has to develop ‘tower regulation’ for individual tower agreements and these will be reviewed by PGCIL. The company will also ensure that the ‘tower regulations’ are in line with IFCs sector specific EHS guidelines for power transmission and telecom, the general EHS guidelines and national requirements for RF equipments /material handling. This will be ensured atleast one month before any construction of ‘power-tower’ takes place so that the manpower is trained on /made well aware of the regulations.
The company will also upgrade its Human Resource policy to meet the requirements of this PS and the company will ensure any changes are implemented within 3 months of IFC disbursement.
PS 3: Pollution Prevention and Abatement
Given the sector and nature of operations, waste generated is minimal (mainly assembly and civil works at sites and waste generated in O&M activities). In the manufacturing unit of the company at Aurangabad, High Density Poly-Ethylene (HDPE) is used for sheathing the copper core RF cable. Currently, the site has a 33 kV substation of state electricity board for supply of power. Additional back up is ensured through 3 DG sets of 500 kVA capacity and 3 UPS of 400 kVA having 1000 kVA VRLA batteries. Hazardous material like diesel for DGs, transformer oil, gas cylinders etc are stored at the facility. Other chemicals and adhesives (in small quantities) are stored in secured place and MSDS are maintained. In terms of management of waste, the scrap metal (mainly Copper and Aluminum) and HDPE is currently stored at a designated place and then sold to scrap dealer for recycling. No open dumping or burning of waste material is practiced. Fuel storage area at the manufacturing sites will be provided with secondary containment provisions and adequate firefighting equipment. Wood for packing material is currently stacked in open. The company will ensure that this area is well fumigated to prevent pests and mosquitoes from breeding, especially in the rainy season.
Majority of project sites include construction activities of short durations and waste management becomes a critical requirement. The contractor and labour deployed is local and hence no need of temporary labour camps. Current practices, as observed during review of O&M sites, need improvement in terms of management of localized oil spills, disposal of oil filters and scraps, stack placement of DG etc. This will be ensured and covered as part of site management plans.
Microqual will also ensure that statutory compliance with respect to air, water and noise emissions from generators, ac units and any other equipments/machines including vehicles engaged for the project is met during the entire project life cycle at all project locations so that public nuisances do not take place. Site level emissions, discharges, spills and contaminations and waste management will be controlled through adequate management plans.
The company will implement a comprehensive waste management plan to ensure that hazardous waste, e-waste, wires, batteries, metal scrap, oil, grease, nails, packing material, plastic waste, concrete etc is disposed as per applicable laws. This plan will be prepared within 4 months of disbursement and will be used throughout the operations of the company and the plan will have activity wise procedures for waste identification, classification, reuse, reduce, recycle, disposal and inventory management.
PS4: Community Health, Safety and Security
The manufacturing facility at Aurangabad is not a designated industrial area but is surrounded by other industries, and the units in Rudrapur are in an industrial area. Hence, the proximity to and impact on neighboring communities or residential areas is very low. The plant operations, equipment and material do not pose a significant risk to the local communities.
In the telecom tower business, especially the RTT, sites are tested for structural strength and stability before building the site. For this an independent consultant prepares the report on structural stability and based on the design and description of the construction, the civil engineering department of Indian Institute of Technology (IIT) provides a certificate of structural suitability for tower erection. In case the tenancy on any tower increases, it would mean additional units of DG, BTS etc and hence additional load on the structure. For all such cases, if required, Microqual will review the validity of the certificate issued by IIT in context of structural suitability and assess additional requirements. NOC are obtained for all sites from the local municipality and/or local Panchayat.
In projects where tower sites are located in dense urban areas, community H&S becomes more critical. The Company will, therefore, ensure that the health, safety and security of local community during construction and O&M phase are not jeopardized in any manner. Towards this, the company will ensure sensitization of vehicle drivers, machine operators, contractors and other staff responsible for working on site. Socially and culturally appropriate behavior will be demonstrated by all workers working on any project site, especially while interacting with local community, women, old aged and children. Microqual will ensure that its contractors are also made aware of and comply with these requirements by putting conditions in their work agreements. Microqual will institute a robust health and safety plan which covers all aspects of its different operations. Where required, Microqual will also ensure prior written approvals from civil/defense air traffic authority, defense and military installations and other sensitive installations before executing the project. Company will further clarify the validity of structural stability certificate issued by IIT in case of increased tenancy.
No excavated/dug up site or under construction site will be left unattended, especially during monsoon season and adequate barricades and safety precautions will be put on display (including glowsigns for night time). Emergency contact numbers of nearest hospital, police station, ambulance, the work contractor and one company staff will also be displayed at all construction sites.
During O&M phase, the company will undertake O&M activities in a manner which causes minimum disturbance to the landowner/tenant. The company will not cause harm/damage to any property (including crops, vegetation, orchards, hutments, shed etc) while undertaking O&M activities. In case, such damage cannot be avoided, the company will compensate adequately for the damages so inflicted. In case of outsourced O&M activities, the company will ultimately be responsible if the contractor does not pay for damages.