Environmental & Social Review Summary

Project Number

30794

Company Name

Red Sea Energy Private Shareholding Company

Date ESRS Disclosed

May 16, 2011

Country

Jordan

Region

Middle East

Last Updated Date

Nov 30, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : Jun 30, 2011
Signed : Jul 12, 2011
Invested : Jul 22, 2011

Sector

Multi Fuel - Thermal Power Generation

Industry

Infrastructure

Department

Regional Industry INF MCT

Project Description

IFC is considering an equity investment of up to US$ 15 million to acquire a minority stake in ENARA, owner of 51% of the Central Electricity Generating Company (“CEGCO”), Jordan’s largest power generation company with an installed capacity of 1,500 MW. CEGCO’s power plants currently sell power to NEPCO, the government owned transmission company and single buyer under long-term power purchase agreements (“PPAs”). IFC would invest alongside Acwa Power International (“ACWA Power”), one of the MENA region’s premier power developers. In addition to running CEGCO’s plants in accordance with the existing PPAs, ACWA Power’s future plans also contemplate upgrading of existing sites and assets to add capacity at costs that are below the cost of greenfield capacity additions and/or extending the terms of the existing PPAs for certain plants based on technical and environmental feasibility. CEGCO’s existing thermal power plants include (i) Aqaba Thermal Power Station (Total 656MW, 130MW x 5 steam units plus 6MW hydro, Phase 1 started operation in 1985 & Phase 2 in 1996, Heavy Fuel Oil (HFO)-fired, but converted to run on imported gas from Egypt), (ii) Hussein Thermal Power Station (Total 363MW, 33MW x 3 HFO-fired steam units, 66MW x 4 HFO-fired steam untis, started operation in 1976/1977/1984), (iii) Rehab Power Plant (Total 357MW, 30MW x 2 gas-fired simple cycle gas turbine, plus 297MW gas-fired combined cycle gas turbine, started operation in 1994-2005), (iv) Risha Power Plant (Total 150MW, 30MW x 5 gas-fired simple cycle gas turbines, started operation in 1989-2005), (v) Marka Power Plant (Total 80MW, 20MW x 4 LFO-fired simple cycle gas turbines, started operation in 1978-1980), (vi) Amman South (Total 30MW x 1 LFO-fired simple cycle gas turbines, started operation in 1995), (vii) Karak (Total 20MW, LFO-fired simple cycle gas turbine, started operation in 1982). In addition, CEGO has two wind power plants (i) Ibrahimiya Wind Power Plant (Total 0.32MW, 0.08MW x 4 wind turbines), and (ii) Hofa Wind Power Plant (Total 1.125MW, 0.225MW x 5 wind turbines). ACWA Power is reviewing the upgrading and capacity addition to improve CEGCO’s overall energy efficiency, environmental performance and power supply security. Details are still to be developed. ACWA Power will implement further upgrading and capacity addition in accordance with the agreed Environmental and Social Action Plan and IFC Performance Standards.

Overview of IFC's Scope of Review

Documents reviewed: - Environmental Due Diligence, Final, Prepared for ACWA Power International, 5 Capitals, October 2010 - CDM (Clean Development Mechanism) Project Design Document (PDD) – Fuel Switching Project of the Aqaba Thermal Power Station (ATPS), PDD Version No. 6, 15th August 2008 - CDM PDD – Reduction of Methane Emissions from Ruseifeh Landfill, Version 4.3, September 17, 2009 - The Hashemite Kingdom of Jordan, Central Electricity Generating Company, Annual Report, Section 21.A (The Company’s contribution to the protection of the environment), 2009 - Project Oryx: Environmental management approach, Version0, February 2011 - ACWA Power International, Annual Report, Section on Corporate Responsbility, 2009 - Air emissions monitoring summary reports prepared by CEGCO for 2008, 2009 and 2010 - Environmental and Social Action Plan (ESAP) – Jordan: ACWA Power, May 11, 2011 Field visits in March 2011 to Aqaba Thermal Power Station (Total 656MW, 130MW x 5 steam units plus 6MW hydro), (ii) Hussein Thermal Power Station (Total 363MW, 33MW x 3 HFO-fired steam units, 66MW x 4 HFO-fired steam units), (iii) Rehab Power Plant (Total 357MW, 30MW x 2 gas-fired simple cycle gas turbine, plus 297MW gas-fired combined cycle gas turbine), (v) Marka Power Plant (Total 80MW, 20MW x 4 LFO-fired simple cycle gas turbines), and (vi) Amman South (Total 30MW x 1 LFO-fired simple cycle gas turbines). Meetings in March 2011 with officers in charge of environmental, health and safety issues of both CEGCO and ACWA Power, and a representative from 5 Capitals (an environmental consulting firm who conducted environmental due diligence of CEGCO for ACWA Power).

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation