Environmental & Social Review Summary

Project Number

30332

Company Name

UABL PARAGUAY S.A.

Date ESRS Disclosed

Aug 30, 2011

Country

Paraguay

Region

Latin America and the Caribbean

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Nov 22, 2011
Signed : Dec 2, 2011
Invested : Dec 13, 2011

Sector

Water Transportation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

UABL Limited, an existing IFC client, is the largest barge operator on the Paraná-Paraguay river system in South America. The company primarily transports: - soy products and iron ore from Paraguay, Bolivia and Western Brazil for final export markets in Europe and Asia, and - petroleum products into Paraguay for domestic consumption. UABL is expanding its 2011-2013 investment program to (i) accelerate the acquisition of dry bulk barges, (ii) modify and refurbish part of its existing barge fleet and (iii) repower existing pushboats and acquire new pushboats, tugboats and ancillary equipment to grow its river transport operations and to satisfy growing demand. The proposed project will allow UABL to further optimize its operations, increase fuel efficiency and expand the transport capacity in the River System (the “Project or “UBAL III”).

Overview of IFC's Scope of Review

The environmental and social review consisted of a desk review of technical, environmental, social and health and safety (ESHS) information submitted by UABL Limited (the “Company”). The review also included monitoring reports and other relevant documents from the existing IFC investments on the Company. In addition, as part of IFC’s standard supervision, in October 2010 an environmental and social specialist performed a site visit, which included an inspection of Ultrapetrol’s shipyard in Punta Alvear, Argentina, an over-flight of the main barges route on the Parana river, a visit to UABL’s Tres Fronteras Terminal in Paraguay, meetings and interviews with UABL’s management, as well as well as technical discussions with staff in-charge of environment, social, health and safety and labor issues (ESHS), at the company’s offices in Buenos Aires, Argentina. IFC’s review included (a) performance assessment against requirements in existing IFC investments, (b) ESHS management plans and procedure, (c) labor issues, (d) operation and maintenance of fleet (tugs, push boats and barges) including liquid, solid and hazardous waste management, (e) operations of on-shore terminals and shipyards, (f) spill prevention and emergency response, (g) cargo handling procedures, and (h) air emissions and fuel efficiency.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
ESAP UABL III.pdf