Environmental & Social Review Summary

Project Number

30053

Company Name

SEI Solar Power Private Limited

Date ESRS Disclosed

Nov 16, 2012

Country

India

Region

South Asia

Last Updated Date

Jul 28, 2017

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Feb 22, 2013
Signed : Mar 15, 2013
Invested : Nov 12, 2013

Sector

Solar - Renewable Energy Generation

Industry

Infrastructure

Department

Regional Industry - INF Asia & Pac

Project Description

The proposed project involves project financing of a 24 MWp solar photovoltaic power project on an 82.5 ha barren area in the Ugras village at approximately 35 km from the Phalodi Tehsil village in the district of Jodhpur, Rajasthan state, India. The project will be developed by a joint venture between Astronergy Solar Korea (ASK) and SunEdison Energy Holding (Singapore) Pte Ltd. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an Inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid. As part of the project, the Company will install an approximately 12 kilometers transmission line (33 kV) to transport the generated electricity to the main grid. The routing of the transmission line, which will be so selected as to remain within the right of way of existing roads, is being finalized. Since the project site is located in an area already accessible to the state highway, there will not be a need to open access roads. The nearest population settlement is approximately 2 km from the project site.

Overview of IFC's Scope of Review

IFC’s appraisal reviewed the Sun Edison (the “Company”)’s Environmental, Health and Safety (EHS), and Social capabilities and its ability to construct and operate the project in accordance with the Indian regulatory requirements and IFC’s Performance Standards. Specific items reviewed included: (a) Environmental and Social Impact Assessment (ESIA) and (b) Site Specific Safety Plan. IFC conducted a visit to the proposed project site and conducted interviews with the Company’s project management team including EHS staff in October 2012.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Broad Community Support

Environmental & Social Action Plan

Client Documentation