PROJECT

Projects

Environmental & Social Review Summary

Project Number

29157

Company Name

BHILWARA ENERGY LIMITED

Date ESRS Disclosed

Jan 25, 2010

Country

India

Region

South Asia

Last Updated Date

Dec 4, 2022

Environmental Category

A - Significant

Status

Completed

Previous Events

Approved : Jun 1, 2010
Signed : Jun 4, 2010
Invested : Sep 23, 2010

Sector

Large Hydro - Renewable Energy Generation

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

Bhilwara Energy Limited (“BEL” or “Company”) is the power sector investment vehicle of LNJ Bhilwara Group created to develop and operate hydro power assets in India and Nepal. BEL currently owns a majority stake in and operates the 86 MW Malana hydropower project and is completing the construction of the 192 MW Allain Duhangan Hydropower Project (ADHP), both located in Himachal Pradesh. BEL plans to develop several medium- to large-scale (i.e., between 50-900 MW) run-of-river hydropower projects predominantly in the mountainous regions of India (Himachal Pradesh and Arunachal Pradesh) and Nepal for which it currently holds licenses. These projects are expected to create power generation capacity of 2200 MW. IFC committed debt and equity financing to ADHP 2004 and again in 2007. The project’s sponsor, LNJ Bhilwara Group, is seeking IFC equity participation in its holding company – Bhilwara Energy Limited – that will, in addition to its existing Malana and ADHP assets, establish project companies to build, own and operate hydropower projects in India and Nepal. As a condition of IFC’s participation, BEL will develop a corporate-wide Social, Environmental, Health and Safety management system, based on the management system established for ADHP, that will be incorporated into the management and operations of each of BEL’s project companies.

Overview of IFC's Scope of Review

IFC’s review of its proposed investment in Bhilwara Energy Limited is based on its longstanding engagement with the LNJ Bhilwara Group in the development and construction of the Allain Duhangan Hydropower Project in Himachal Pradesh India (including regular monitoring of the project’s social and environmental impact mitigation measures); discussions with the Company’s senior management; and a review of the Company’s pipeline of projects. Of the eight projects in the Company’s pipeline, detailed project designs for six are in preparation but no substantive environmental or social assessments have been completed.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
Bhilwara Energy Ltd - E&S Action Plan.pdf