PROJECT

Projects

Environmental & Social Review Summary

Project Number

28966

Company Name

PAKISTAN INTERNATIONAL BULK TERMINAL LIMITED

Date ESRS Disclosed

Apr 20, 2012

Country

Pakistan

Region

Middle East

Last Updated Date

Dec 1, 2016

Environmental Category

B - Limited

Status

Active

Previous Events

Approved : May 31, 2012
Signed : Jun 7, 2012
Invested : Jul 14, 2015

Sector

Port and Harbor Operations

Industry

Infrastructure

Department

Regional Industry INF MCT

Project Description

There is at present no dedicated port terminal in Pakistan for non-food dry bulk cargo (e.g., coal, cement and clinker). The volume of coal, cement and clinker handled by Pakistan ports grew by more than 15% between 2007-08 and 2008-09. These volumes are currently handled primarily by small privately managed facilities at various Pakistan ports, none of which is equipped with adequate equipment or storage capacity. To respond to Pakistan’s need for a dedicated bulk terminal, the Port Qasim Authority (PQA) in 2008 launched an international competitive bidding process for private sector operators to develop and operate such a facility in Port Qasim, located approximately 50 km southeast of Karachi. In August 2009, Pakistan International Container Terminal Ltd. (PICT) won the bid. PICT has created a fully-owned special purpose subsidiary, Pakistan International Bulk Terminal Limited (PIBT or the Project Company) to develop and operate the project. PICT currently operates a container terminal in the Port of Karachi under a 21-year agreement signed in 2002 with the Karachi Port Trust. Since 2003 IFC has provided four loans to PICT to support the development and expansion of the Karachi Port container terminal.

The project consists of the construction and operation of the referenced bulk terminal under a 33-year agreement between PIBT and PQA. The bulk terminal will primarily handle coal, cement and clinker and will have a total capacity of approximately 8 million tons in the initial phase, which can be increased to over 12 million tons at a later stage. The project will be developed on a parcel of reclaimed land totaling 25 hectares (ha) in size. It will include five concrete silos of 10,000 tons capacity each located at the western side of the storage area. The development also includes a jetty of up to 460 meters (m) in length to allow the simultaneous operation of two vessels. The jetty will have two coal ship unloading cranes and one clinker and ship loading crane and be connected to the storage area via a 2.5km trestle bridge. The trestle will have two covered conveyors, one for coal imports and the other for cement exports.

Overview of IFC's Scope of Review

As a long-term IFC client the project sponsor, Pakistan International Container Terminal Limited, reports annually on the management of its environmental and social (E&S) performance. Its performance has been strong over the eight years of IFC’s multiple investments in its container terminal at the Port of Karachi. The company regularly submitted thorough and detailed Annual E&S monitoring reports (AMRs) that confirm compliance with IFC requirements. In addition, IFC has carried out supervision visits to the Port of Karachi facility twice in the last few years (2008 and 2010). The most recent visit (March 2010) confirmed that the company is meeting or exceeding the requirements of the investment agreement and continues to demonstrate that its activities comply with applicable Pakistan laws and regulations, IFC’s Performance Standards (PSs) and World Bank Group environmental, health and safety (EHS) guidelines. As part of the due diligence for the subject investment, IFC met with the project team in Karachi in December 2010 to review the plans for the proposed bulk terminal at Port Qasim, and toured the project site with both the project sponsor and the independent consultants, Environmental Management Consultants (EMC), who prepared the Environmental and Social Impact Assessment (ESIA) for the project, in accordance with both the requirements of the Pakistan Environmental Protection Act of 1997 and IFC’s PSs. IFC also reviewed the ESIA Final Report (dated July 2011 and included as an attachment to this Environmental and Social Review Summary) and held several follow up meetings and other communications with EMC to discuss their findings. IFC also attended the public hearing on the ESIA for the project conducted by the Sindh Environmental Protection Agency (SEPA) on October 15, 2011.

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
ESIA.pdf