PROJECT

Projects

Environmental & Social Review Summary

Project Number

27780

Company Name

SoEnergy International Inc

Date ESRS Disclosed

Feb 27, 2009

Country

Colombia

Region

Latin America and the Caribbean

Last Updated Date

Nov 30, 2016

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Sep 21, 2009
Signed : Nov 10, 2009
Invested : Dec 15, 2009

Sector

Heavy Fuel Oil - Thermal Power Generation

Industry

Infrastructure

Department

Regional Industry INF LAC & EUR

Project Description

The project consists of the design, construction, operation, maintenance and transfer of a fuel-oil fired thermal plant of 43 MW availability guarantee power generation facility (with a gross capacity of approximately 64 MW) that will be located in Campo Rubiales (Department of Meta, Colombia), 465 Km distant from Bogota. The facility will be developed in two (2) phases, Phase I consists of 5 Pielstick Engine generator sets with a total output of at least 22.5 MW and Phase II consists of implementation of an additional output of at least 20.5 MW with some redundancy engine generators for the availability guarantee. The plant will supply the energy needs of a pumping station for the new oil export pipeline and the current needs of the existing oilfield facilities.

The project sponsor is Energy International Corporation an EPC firm specialized in the power sector. Rubiales is one of the largest oilfields in Colombia and is operated by Meta Petroleum under a concession that extends until 2016. The fuel for the power plant will be supplied by Meta Petroleum and is sourced from the oil produced in Rubiales.

Termo Rubiales has a mixed role as a supplier (for energy supply) and contractor. For the purpose of this document Termo Rubiales is defined as a contractor since the plant is physically located in the operation area and is managed through the Meta Petroleum E&S management system for supervision, EHS reporting, waste management and EHS monitoring.

Overview of IFC's Scope of Review

The review of this project consisted of a document review, including the project’s technical, environmental and social reports and records; interviews with key personnel of the company; and a field visit to assess on-site the operation of the Environmental Health and Safety (EHS) and Social Management System at the facilities in Rubiales oilfield in the Puerto Gaitan area (Llanos Orientales, Colombia).

The following management elements were assessed:

- Adequacy of the existing Environmental, Health, Safety and Social Management System to satisfy IFC’s Performance Standards requirements;
- The client’s assessment of potential EHS & social impacts related to its projects;
- Labor issues and human resources policy;
- Health and safety performance;
- Noise control;
- Air emissions;
- Wastewater and effluent management;
- Solid waste management;
- Emergency response plans;
- Community and indigenous peoples engagement;
- Potential land use, consultation and compensation management;
- Management of armed military security forces;
- Community health and safety (road safety for truck fleet)

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement

Client Documentation

File Name Actions
Termo Rubiales ESAP Updated 022609.pdf