PROJECT

Projects

Environmental & Social Review Summary

Project Number

27396

Company Name

ZONA FRANCA CELSIA S A E S P

Date ESRS Disclosed

Dec 23, 2008

Country

Colombia

Region

Latin America and the Caribbean

Last Updated Date

Jun 3, 2021

Environmental Category

B - Limited

Status

Completed

Previous Events

Approved : Sep 21, 2009
Signed : Sep 30, 2009
Invested : Nov 13, 2009

Sector

Gas - Thermal Power Generation

Industry

Infrastructure

Department

Gbl Infrastructure & Natural Resources

Project Description

The project consists of the construction of a 169 MW natural gas-fired combined cycle unit by Termoflores S.A. E.S.P. (“Termoflores” or “the Company”), a generation company whose operations are located in Barranquilla, Colombia. Currently, Termoflores has three natural gas-fired units in operation, (the Flores I combined-cycle and the Flores II and III open-cycle) with a total installed capacity of 441 MW. Flores IV includes the expansion/conversion of the existing gas turbines in Flores II and III from open cycle to a combined cycle facility, by adding a new steam turbine generator, heat recovery steam generator and balance of plant equipment. Flores IV will utilize the waste heat from Flores II and III to provide 169 MW of additional capacity without using significant additional gas. After the Project is completed, Termoflores will have two operating units (Flores I and Flores IV) with a generation capacity of 610 MW. The estimated construction time is 25 months and project completion must be attained before December 1, 2010.

The cost of the project is estimated at $278.2 million. The project will be financed with $55.6 million of equity (from cash from operations) and $222.6 million of debt. The debt component includes:


- IFC A/B facility of $200 million, and
- local currency loan of $22.6 million equivalent.

In addition to the reliability charge, the company expects to generate revenues from CO2 emission reductions of about $4 million per year, based on CO2 emission reductions approximately 460,000 MT per year.

Overview of IFC's Scope of Review

IFC’s appraisal of this project consisted on an extensive desk review of environmental, social, health and safety, and labor information, including the revision of three Environmental Impact Assessments for the existing phases (Flores I, II, and III), and a new Environmental Management Plan updated for Flores IV, the “Project”.

Furthermore, an environmental specialist and a social specialist based in IFC HQ in DC performed a site visit to Termoflores in Barranquilla, and held meetings with Termoflores’ Environmental Manager, Occupational Health and Safety Manager, HHRR Manager, security personnel, the EPC’s EHS Coordinator, and with SIESCO team which is the consulting firm appointed by the Environmental Ministry to perform the Interventoría Ambiental and therefore supervises environmental compliance of both, the existing operations and the works associated with the expansion (Flores IV). During the site visit, the IFC team inspected all existing operations, visited the site where the Flores IV will be built, reviewed in-site application of the EMPs, assessed general housekeeping, and reviewed environmental monitoring data (e.g. air quality, stack emission, noise, wastewater, etc) and occupational health and safety data (e.g. accident/incident reports, training, PPE use, etc).

E & S Project Categorization and Applicable Standard

Environmental and Social Mitigation Measures

Stakeholder Engagement